2323 Bryan St
Dallas, TX 75201 · 2323 Bryan St
Break room renovation and office-suite work at 2323 Bryan St
A renovation of existing break rooms at 2323 Bryan St was registered with TDLR on November 24, 2025. The 7,200-square-foot project includes tile and millwork updates and repairs to walls and flooring. Dallas permits filed in 2026 also describe suite changes, work on the building’s mechanical system and a skybridge roof replacement.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Nov 9, 2026
- Projects
- 11
- 11 filings
- Latest filing
- Nov 9, 2026
- since Dec 1, 2020
- Largest scope
- 7,200 sf
- Estimated cost
- $80K
- state registration
Permit & project history
11 projectsThe tenant is demolishing a demising wall between their current suite and a suite next door. we will be combining the 2 suites
The tenant is demolishing a demising wall between their current suite and a suite next door. we will be combining the 2 suites
City of Dallas permitCommercial Plumbing PermitMcr tenant is vacating leased suite 1530 on the 15th floor and returning the space back to the landlord. the interior level lease areas will be gutted back to bare walls. the mechanical and hvac equipment in the suite will be removed along with the rooftop mechanical heat rejection equipment and associated pumps. hvac of the space will be switched over to "house" systems, and a new chilled water fan coil unit will be installed to satisfy cooling and heating of the space. the electrical distribution for that suite will be removed. lighting, house power, and hvac for the space will be rewired to the building house panels. fire suppression and detection systems will be modified to service the vacated space. the space will be left with code required minimum lighting, ventilation and life safety systems
Mcr tenant is vacating leased suite 1530 on the 15th floor and returning the space back to the landlord. the interior level lease areas will be gutted back to bare walls. the mechanical and hvac equipment in the suite will be removed along with the rooftop mechanical heat rejection equipment and associated pumps. hvac of the space will be switched over to "house" systems, and a new chilled water fan coil unit will be installed to satisfy cooling and heating of the space. the electrical distribution for that suite will be removed. lighting, house power, and hvac for the space will be rewired to the building house panels. fire suppression and detection systems will be modified to service the vacated space. the space will be left with code required minimum lighting, ventilation and life safety systems
City of Dallas permitCommercial Alteration Addition PermitQteam inhouse the tenant is demoing a demising wall between their current suite and a suite next door. we will be combing the 2 suites. in the current suite area, we will be performing the following work - we are added a cool water spicket at 2 sink locations. this will be connected to the current plumbing. we are also adding electrical outlets through out the suite. we will add some finishes to the suite; quietrock on existing walls, painting, replace stained carpet, modify millwork to add trash can cabinets
Qteam inhouse the tenant is demoing a demising wall between their current suite and a suite next door. we will be combing the 2 suites. in the current suite area, we will be performing the following work - we are added a cool water spicket at 2 sink locations. this will be connected to the current plumbing. we are also adding electrical outlets through out the suite. we will add some finishes to the suite; quietrock on existing walls, painting, replace stained carpet, modify millwork to add trash can cabinets
City of Dallas permitCommercial Alteration Addition PermitRemove and dispose of the existing skybridge roof down to the existing metal deck substrate for approximately [2300] square feet. a. kpost will provide a dumpster for the existing roof tear-off disposal. 2. furnish and install two [2] layers of 2.2” polyisocyanurate mechanically attached onto the existing cleaned metal deck. 3. fully adhere a 60 mil carlisle tpo membrane on top of the newly installed two layers of 2.2” polyisocyanurate. 4. provide and flash wall and curb assemblies with carlisle tpo membrane. 5. provide and install new penetration flashings. penetration flashing type shall be determined by the type of penetration and the duration of the roof warranty
Remove and dispose of the existing skybridge roof down to the existing metal deck substrate for approximately [2300] square feet. a. kpost will provide a dumpster for the existing roof tear-off disposal. 2. furnish and install two [2] layers of 2.2” polyisocyanurate mechanically attached onto the existing cleaned metal deck. 3. fully adhere a 60 mil carlisle tpo membrane on top of the newly installed two layers of 2.2” polyisocyanurate. 4. provide and flash wall and curb assemblies with carlisle tpo membrane. 5. provide and install new penetration flashings. penetration flashing type shall be determined by the type of penetration and the duration of the roof warranty
City of Dallas permitCommercial Roofing PermitFinish renovation of existing break rooms including small areas of new tile and millwork. repairs for damaged walls and flooring throughout both floors. — 2323 bryan st
TDLR project registrationRenovation/AlterationProject Registered7,200 sq ft$80K est.- Project #
- TABS2026006657
- Tenant / owner
- Digital Realty Trust Break Room Updates 17 & 18
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 2323 Bryan St
What is being built at 2323 Bryan St in Dallas?
Records describe a renovation of existing break rooms, along with later office-suite and building work. The break room project was registered with TDLR on November 24, 2025.
What does the 2323 Bryan St break room renovation include?
The project description calls for small areas of new tile and millwork and repairs to damaged walls and flooring on both floors. The TDLR registration lists 7,200 square feet.
Are office suites being changed at 2323 Bryan St?
Yes. A November 4, 2026 plumbing permit describes combining two suites, and an October 23, 2026 alteration permit also describes combining suites and adding finishes and outlets.
How much will the 2323 Bryan St break room project cost?
The TDLR registration lists an estimated cost of $80,000 for the project. That is the applicant’s estimate, not a confirmed total cost for all work at the address.
What work is happening near Morgan Lewis Dallas on Ross Avenue?
At 2323 Bryan St, about 366 meters from Morgan Lewis Dallas at 2200 Ross Ave, records describe break room renovation and later suite and building-system work. The break room project was registered on November 24, 2025.
Is construction complete at 2323 Bryan St?
The records provided do not say whether the work is complete. They include permits filed through November 9, 2026, including one for adding duplex receptacles.
Also being built nearby
All of 75201- 2323 Bryan · 2323 BryanJun 24, 2024Chat sports — renovation/alteration — a non-structural interior finish-out in an existing single floor suite
- 717 Leondard St · Digital RealtyMay 31, 2024Dlr - 717 leondard st. garage security upgrade — renovation/alteration — addition of security fence and associated doors to create a security perimeter at the first floor of parking garage · 94 m away
- 673 Crockett StJan 22, 2021Permanent electrical service · 112 m away
- 600 N Pearl StSep 5, 2025Replace backflow assemblies in south tower 25th floor & central plant · 124 m away
- 700 N Pearl StAug 24, 2026Commercial remodel of existing space · 126 m away
- 650 N Pearl StDec 22, 2025Boiler removal in mechanical room. install water softner system and rpza“ · 146 m away
- 2502 Live Oak StApr 22, 20262.5 ton straight ac system basic horizontal · 255 m away
- 720 Olive StJan 4, 2021Supergraphics change copy · 268 m away
- 400 Olive StAug 28, 2026Backflow device replacement in the center tower on the 42nd floor · 288 m away
- 2110 Live Oak StMay 21, 2025We’re expanding the driveway approach by approximately 125 square feet of concrete and pavers to improve bus exit flow. as part of this work, the ada ramp will be moved back to allow better clearance for buses while maintaining full accessibility · 291 m away
- 2516 Florence StOct 16, 2026Gas test · 329 m away
- 2001 Bryan StJul 29, 2026Disconnect reconnect · 343 m away