300 S. Pearl Expressway

Dallas, TX 75201 · Hall Render, 6th Floor Spec Suite

Hall Render tenant build-out registered at 300 S. Pearl

A 6,351-square-foot tenant build-out for Hall Render was registered at the multi-tenant building at 300 S. Pearl Expressway on July 16, 2025. A separate 2023 registration covered a 11,224-square-foot spec suite build-out on the sixth floor.

Summarized from Texas Department of Licensing and Regulation records · updated Jul 16, 2025

Projects
2
2 filings
Latest filing
Jul 16, 2025
since Jul 16, 2025
Largest scope
6,351 sf
Estimated cost
$1.0M
state registration

Where this project stands

Finishing up · inspection next

Hall Render

6,351 sq ft · $750K est.

  1. RegisteredJul 16, 2025
  2. Plan review
  3. ConstructionSep '25 – Dec '25
  4. Inspectednow
  5. Closed

Scheduled to finish Dec 31, 2025; the state inspection hasn't been filed yet.

4 contacts on this project · 3 phone numbers

Permit & project history

2 projects
  1. Hall Render

    Tenant build-out — three hundred pearl

    TDLR project registrationRenovation/AlterationReview Complete6,351 sq ft$750K est.
    Tenant / owner
    Hall Render
    Design firm
    Pro
    Contact
    Pro
  2. 6th Floor Spec Suite

    Spec suite build-out within a first-generation space. — three hundred pearl

    TDLR project registrationRenovation/AlterationProject Closed11,224 sq ft$1.0M est.
    Tenant / owner
    6th Floor Spec Suite
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 300 S. Pearl Expressway

What is being built at 300 S. Pearl Expressway?

A TDLR project registration describes a tenant build-out for Hall Render in the multi-tenant building. The 6,351-square-foot project was registered July 16, 2025.

Is Hall Render taking over the whole building at 300 S. Pearl?

No. The records describe a tenant build-out at a multi-tenant building, not Hall Render occupying the entire address.

How large is the Hall Render build-out at 300 S. Pearl?

The TDLR registration lists 6,351 square feet for the Hall Render tenant build-out.

When was the Hall Render project at 300 S. Pearl registered?

The project was registered July 16, 2025, under TDLR number TABS2025023637. Its status is listed as Review Complete.

Was there an earlier build-out at 300 S. Pearl Expressway?

Yes. A September 19, 2023 TDLR registration covered an 11,224-square-foot sixth-floor spec suite build-out. That project is listed as closed.

What's being built near Loco Meletio Development on South Pearl Expressway?

At the same address, a TDLR registration describes a 6,351-square-foot Hall Render tenant build-out, registered July 16, 2025.