300 S Pearl Expy
Dallas, TX 75201
Office finish-out permitted for Suite 375 in Dallas
Permits indicate an office finish-out in Suite 375 at 300 S Pearl Expy. The City of Dallas issued an alteration permit on August 15, 2025, followed by electrical and plumbing permits on September 12 and a mechanical permit on September 15, 2025.
Summarized from City of Dallas records · updated Sep 15, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Sep 15, 2025
- since Aug 15, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSuite 3751. install filter media on fpbs and ahu2. demolition ductwork as shown.3. demolition 1 fpb4. new ductwork as shown5. insulation for new duct6. 2 cable-operated dampers7. 14 new supply grilles8. 24 new return grilles9. 28 supply slots10. 1 return air slot11. 2 sidewall return grilles
Suite 3751. install filter media on fpbs and ahu2. demolition ductwork as shown.3. demolition 1 fpb4. new ductwork as shown5. insulation for new duct6. 2 cable-operated dampers7. 14 new supply grilles8. 24 new return grilles9. 28 supply slots10. 1 return air slot11. 2 sidewall return grilles
City of Dallas permitCommercial Mechanical PermitSuite 375sewer, vent & water piping1-hub drain1- disposal2- sinks2- water heater1-water filter with rpz2- flood stop detection
Suite 375sewer, vent & water piping1-hub drain1- disposal2- sinks2- water heater1-water filter with rpz2- flood stop detection
City of Dallas permitCommercial Plumbing Permit
Sources: City of Dallas
Questions about 300 S Pearl Expy
What is being built at 300 S Pearl Expy?
City of Dallas permits indicate an office finish-out in Suite 375. The filings include alteration, electrical, plumbing, and mechanical work.
When was the office finish-out permitted at 300 S Pearl Expy?
The alteration permit was filed August 15, 2025. Electrical and plumbing permits followed on September 12, and a mechanical permit was filed September 15, 2025.
What do the permits say about the work in Suite 375?
The permits describe an office-use finish-out, with plumbing work for sinks and other fixtures and mechanical work involving ductwork, grilles, and dampers. The electrical filing also describes a finish-out for office use.
Is this a new office building at 300 S Pearl Expy?
The available permits describe a finish-out of space for office use in Suite 375, not construction of a new building.
What's being worked on near Speculative Suite 350 at 300 South Pearl Expressway?
Permits for Suite 375 at the same address indicate an office finish-out. The records do not identify the occupants of either suite.
What permit numbers are associated with the Suite 375 office finish-out?
The filings include alteration permit COM-ALT-ADD-25-000826, electrical permit COM-ELC-25-002146, plumbing permit COM-PLM-25-001742, and mechanical permit COM-MEC-25-000807.
Also being built nearby
All of 75201- 300 South Pearl Expressway 600 · Loco Meletio Development LPNov 11, 2025Speculative suite 600 — renovation/alteration — tenant improvement
- 300 S. Pearl Expressway · Loco Meletio Development LPJul 16, 2025Hall render — renovation/alteration — tenant build-out
- 300 South Pearl Expressway 350 · Loco Meletio Development LPNov 11, 2025Speculative suite 350 — renovation/alteration — tenant improvement
- 2130 Commerce StOct 27, 2020No build back allowed on this permit · 73 m away
- 2109 Commerce StMay 21, 2026Relocate meter from basement to exterior of building · 78 m away
- 2101 Commerce StJan 11, 2021Erect detached sign changeable copy · 78 m away
- 315 S Cesar Chavez BlvdNov 9, 2026Have a gas leak in concrete , need to remove and replace damaged pipe , test gas grill section - near the pool · 103 m away
- 2117 Albany StJan 5, 2026Replace 3.5 ton furn only · 129 m away
- 2038 Commerce StMar 25, 2026Interior remodel · 129 m away
- 2121 Diversey StJun 23, 2025Replacing the coil · 138 m away
- 2123 Albany StMay 12, 2026Replace tankless water heater · 144 m away
- 2026 Commerce StAug 11, 2025Qteam qr add new patio to existing restaurant · 146 m away