3001 Fairmount St
Dallas, TX 75201
Outdoor improvements permitted at 3001 Fairmount St
City of Dallas permits indicate outdoor improvements at 3001 Fairmount St, including fencing, decorative fountains, a concrete seat wall, lighting and electrical receptacles. The filings began October 16, 2025, and the latest listed permit, for a wood fence with faux ivy, was filed February 25, 2026.
Summarized from City of Dallas records · updated Feb 25, 2026
- Projects
- 8
- 8 filings
- Latest filing
- Feb 25, 2026
- since Oct 16, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
8 projectsSources: City of Dallas
Questions about 3001 Fairmount St
What is being built at 3001 Fairmount St?
City of Dallas permits indicate outdoor improvements, including decorative fountains, a concrete seat wall, lighting, receptacles and fencing. The records do not identify a new tenant or a broader project purpose.
When were permits filed for work at 3001 Fairmount St?
The listed permits run from October 16, 2025, through February 25, 2026. The latest filing is permit COM-ACC-26-000010 for a wood fence with faux ivy.
Is a new building going up at 3001 Fairmount St?
The listed permits describe site features and related work, including fountains, fencing, lighting and a seat wall. They do not indicate construction of a new building.
What does permit COM-ELC-25-003249 cover at 3001 Fairmount St?
Filed November 19, 2025, the permit covers two new light poles, string lights, a water feature and six receptacles.
Is there a fountain planned at 3001 Fairmount St?
Yes. City permits filed November 4 and November 14, 2025, describe a decorative fountain; electrical filings also mention a water feature.
What is being improved near 2nd Floor Corridor on Maple Avenue?
At 3001 Fairmount St, about 110 meters from the listed 2nd Floor Corridor address, City of Dallas permits indicate outdoor improvements such as fencing, lighting, fountains and a concrete seat wall.
Also being built nearby
All of 75201- 3001 Fairmount Street · Am Uptown Hotel II LLCJul 28, 2025Wolf street plaza — new construction — outdoor plaza for adjacent hotel use. 7735 sq ft
- 3033 Fairmount StOct 6, 2026Installed backflow for new drinking fountain outside of building. backflow is in a box · 26 m away
- 3030 Fairmount StNov 19, 2025Qteam meeting tbd new construction mfdwith structured garage and ground floor retail. 321 dwus. directed by james shelton to apply for a new permit to replace permit 2212091082_175310999-001 since it has expired. no new work at all · 27 m away
- 2525 Carlisle StFeb 3, 2026Dc repair · 100 m away
- 3008 Maple AveJul 21, 2025Repair grease underground broken pipe · 105 m away
- 3040 Maple Ave. 2nd · Old Parkland East Campus - Providence HallDec 3, 20252nd floor corridor — additions to existing building — tenant improvement · 110 m away
- 3001 MapleDec 2, 2025Install plumbing per plans · 117 m away
- 3001 Maple Avenue Suites 310, 320 And 330 · 3001 Maple LPApr 24, 20253rd floor spec suites — renovation/alteration — tenant improvement · 117 m away
- 3001 Maple Terrace · 3001 Maple LPJun 16, 2026Legacy knight expansion — renovation/alteration — tenant improvement · 117 m away
- 3001 Maple Avenue · 3001 Maple LPApr 24, 2025The related companies — renovation/alteration — tenant improvement · 117 m away
- 3001 Maple Ave · 3001 Maple LPNov 12, 2026Job#26178h bva remodel. furnish and install fan coil unitsexhaust fansupply grilles lay in return grilles slot diffusers sidewall grilles · 117 m away
- 3003 Maple AveFeb 5, 2026Manufacture (eaton) is to repair internal control wiring within main switchboard ms1. also need to add gfi protection to ms2 switchgear. both switchgears will require utility shutdown and meter release from city · 117 m away