3102 Maple Avenue
Dallas, TX 75201 · Ashton Gray, Sbaiti Law + 1 more
Tenant improvements registered for three businesses at 3102 Maple
Tenant improvement projects for Ashton Gray, Sbaiti Law and Hillcrest Bank were registered at the multi-tenant building at 3102 Maple Avenue between June 26 and August 11, 2025. The Texas Department of Licensing and Regulation records describe renovation and alteration work, with project areas ranging from 1,009 to 8,335 square feet.
Summarized from Texas Department of Licensing and Regulation records · updated Aug 11, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Aug 11, 2025
- since Jun 26, 2025
- Largest scope
- 8,335 sf
- Estimated cost
- $1.0M
- state registration
Where this project stands
Finishing up · inspection nextAshton Gray
1,009 sq ft · $100K est.
- RegisteredAug 11, 2025
- Plan review
- ConstructionAug '25 – Nov '25
- Inspectednow
- Closed
Scheduled to finish Nov 14, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
3 projectsTenant improvement — 3102 maple
TDLR project registrationRenovation/AlterationReview Complete1,009 sq ft$100K est.- Project #
- TABS2025025602
- Tenant / owner
- Ashton Gray
- Design firm
- Pro
- Contact
- Pro
Tenant improvement — 3102 maple avenue
TDLR project registrationRenovation/AlterationReview Complete8,335 sq ft$1.0M est.- Project #
- TABS2025024797
- Tenant / owner
- Sbaiti Law
- Design firm
- Pro
- Contact
- Pro
Tenant improvement — 3102 maple
TDLR project registrationRenovation/AlterationReview Complete3,402 sq ft$136K est.- Project #
- TABS2025022174
- Tenant / owner
- Hillcrest Bank Expansion
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3102 Maple Avenue
What is being built at 3102 Maple Avenue in Dallas?
TDLR records show tenant improvement projects for Ashton Gray, Sbaiti Law and Hillcrest Bank at this multi-tenant building. The registrations describe renovation and alteration work, not new construction.
What businesses have tenant improvement projects at 3102 Maple?
The records name Ashton Gray, Sbaiti Law and Hillcrest Bank Expansion. They are separate tenant improvement projects at the multi-tenant address.
When were the 3102 Maple projects registered?
The three TDLR registrations were filed June 26, July 31 and August 11, 2025. All three show a status of Review Complete.
How large are the tenant improvement projects at 3102 Maple?
The registered project areas are 3,402 square feet for Hillcrest Bank Expansion, 8,335 square feet for Sbaiti Law and 1,009 square feet for Ashton Gray.
What is being renovated near Old Parkland East Campus - Providence Hall?
At 3102 Maple Avenue, about 63 meters from the campus, TDLR records list tenant improvements for three businesses. The filings were made from June through August 2025.
Is there a new building planned near 3001 Maple?
The records for 3102 Maple, about 98 meters from 3001 Maple, describe tenant improvements in an existing multi-tenant building. They do not describe a new building.
Also being built nearby
All of 75201- 3102 Maple AveJan 22, 2026Plumbing remodel of existing space. space was previously a full floor occupant and is now divided into multiple tenant spaces
- 3102 Maple Avenue Suites 425 And 450 · Maple Country, Ltd.Oct 1, 2025Spec suites 425 & 450 — renovation/alteration — speculative suites
- 3102 Maple Avenue 4th · Maple Country, Ltd.Oct 7, 20254th floor corr, rr, and elev lobby — renovation/alteration — capital improvements
- 3040 Maple Ave. 2nd · Old Parkland East Campus - Providence HallDec 3, 20252nd floor corridor — additions to existing building — tenant improvement · 63 m away
- 3200 Maple AveOct 28, 2025Replacing 4” double check · 64 m away
- 3131 Maple AveDec 16, 20251. remove all loose gravel and broadcast on the main roof. 2. tear off existing roof and lightweight concrete down to the steel deck. 3. remove and replace existing steel deck with new b-deck. 4. mechanically attach two layers of 2.2" iso & 5/8" storm x coverboard. 5. mechanically attach 1/4" per foot full tapered iso sloped to all four sides. 6. torch apply a 2-ply modified bitumen base and cap sheet. 7. install new prefabricated drip edge metal along with prefabricated gutter and downspouts. 8. install new wall mounted ladder for access directly to the penthouse roof from the main roof · 87 m away
- 3008 Maple AveJul 21, 2025Repair grease underground broken pipe · 91 m away
- 3003 Maple AveFeb 5, 2026Manufacture (eaton) is to repair internal control wiring within main switchboard ms1. also need to add gfi protection to ms2 switchgear. both switchgears will require utility shutdown and meter release from city · 97 m away
- 3001 Maple Terrace · 3001 Maple LPJun 16, 2026Legacy knight expansion — renovation/alteration — tenant improvement · 98 m away
- 3001 MapleDec 2, 2025Install plumbing per plans · 98 m away
- 3001 Maple Avenue Suites 310, 320 And 330 · 3001 Maple LPApr 24, 20253rd floor spec suites — renovation/alteration — tenant improvement · 98 m away
- 3001 Maple Avenue · 3001 Maple LPApr 24, 2025The related companies — renovation/alteration — tenant improvement · 98 m away