3131 Maple Ave
Dallas, TX 75201
Roof replacement permitted at 3131 Maple Ave
Roof replacement work at 3131 Maple Ave was permitted on December 1 and December 16, 2025. The permit descriptions call for replacing the roof deck and installing a new modified-bitumen roof, gutters, downspouts, and a wall-mounted ladder to the penthouse roof.
Summarized from City of Dallas records · updated Dec 16, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Dec 16, 2025
- since Dec 1, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projects1. remove all loose gravel and broadcast on the main roof. 2. tear off existing roof and lightweight concrete down to the steel deck. 3. remove and replace existing steel deck with new b-deck. 4. mechanically attach two layers of 2.2" iso & 5/8" storm x coverboard. 5. mechanically attach 1/4" per foot full tapered iso sloped to all four sides. 6. torch apply a 2-ply modified bitumen base and cap sheet. 7. install new prefabricated drip edge metal along with prefabricated gutter and downspouts. 8. install new wall mounted ladder for access directly to the penthouse roof from the main roof
1. remove all loose gravel and broadcast on the main roof. 2. tear off existing roof and lightweight concrete down to the steel deck. 3. remove and replace existing steel deck with new b-deck. 4. mechanically attach two layers of 2.2" iso & 5/8" storm x coverboard. 5. mechanically attach 1/4" per foot full tapered iso sloped to all four sides. 6. torch apply a 2-ply modified bitumen base and cap sheet. 7. install new prefabricated drip edge metal along with prefabricated gutter and downspouts. 8. install new wall mounted ladder for access directly to the penthouse roof from the main roof
City of Dallas permitCommercial Roofing PermitMcr 1. remove all loose gravel and broadcast on the main roof. 2. tear off existing roof and lightweight concrete down to the steel deck. 3. remove and replace existing steel deck with new b-deck. 4. mechanically attach two layers of 2.2" iso & 5/8" storm x coverboard. 5. mechanically attach 1/4" per foot full tapered iso sloped to all four sides. 6. torch apply a 2-ply modified bitumen base and cap sheet. 7. install new prefabricated drip edge metal along with prefabricated gutter and downspouts. 8. install new wall mounted ladder for access directly to the penthouse roof from the main roof
Mcr 1. remove all loose gravel and broadcast on the main roof. 2. tear off existing roof and lightweight concrete down to the steel deck. 3. remove and replace existing steel deck with new b-deck. 4. mechanically attach two layers of 2.2" iso & 5/8" storm x coverboard. 5. mechanically attach 1/4" per foot full tapered iso sloped to all four sides. 6. torch apply a 2-ply modified bitumen base and cap sheet. 7. install new prefabricated drip edge metal along with prefabricated gutter and downspouts. 8. install new wall mounted ladder for access directly to the penthouse roof from the main roof
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 3131 Maple Ave
What work is planned at 3131 Maple Ave in Dallas?
City of Dallas permits indicate a roof replacement, including a new steel deck, modified-bitumen roofing, gutters, downspouts, and a ladder to the penthouse roof.
When was the roof work at 3131 Maple Ave permitted?
The City of Dallas records show filings dated December 1 and December 16, 2025.
What is permit COM-ROOF-25-000165 for?
The December 16, 2025, commercial roofing permit describes removing the existing roof and deck and installing replacement roofing, drainage components, and a wall-mounted ladder.
What is permit COM-ALT-ADD-25-001820 for?
The December 1, 2025, commercial alteration addition permit describes roof replacement work at 3131 Maple Ave, including a new steel deck and modified-bitumen roof.
Is a new building being built at 3131 Maple Ave?
The records provided describe roof replacement work, not construction of a new building.
What is being built near Bva Group on Maple Avenue?
At 3131 Maple Ave, about 184 meters from Bva Group at 3001 Maple Ave, permits indicate roof replacement work. The filings are dated December 1 and December 16, 2025.
What construction is happening near the 2nd Floor Corridor on Maple Ave?
Permits for 3131 Maple Ave, about 150 meters from the 2nd Floor Corridor at 3040 Maple Ave, describe replacing the roof and related components. The records are dated December 1 and December 16, 2025.
Also being built nearby
All of 75201- 3200 Maple AveOct 28, 2025Replacing 4” double check · 25 m away
- 3102 Maple Avenue Suites 425 And 450 · Maple Country, Ltd.Oct 1, 2025Spec suites 425 & 450 — renovation/alteration — speculative suites · 87 m away
- 3102 Maple Avenue 4th · Maple Country, Ltd.Oct 7, 20254th floor corr, rr, and elev lobby — renovation/alteration — capital improvements · 87 m away
- 3102 Maple Avenue · Maple Country, Ltd.Aug 11, 2025Ashton gray — renovation/alteration — tenant improvement · 87 m away
- 3102 Maple AveJan 22, 2026Plumbing remodel of existing space. space was previously a full floor occupant and is now divided into multiple tenant spaces · 87 m away
- 3040 Maple Ave. 2nd · Old Parkland East Campus - Providence HallDec 3, 20252nd floor corridor — additions to existing building — tenant improvement · 150 m away
- 3008 Maple AveJul 21, 2025Repair grease underground broken pipe · 177 m away
- 3003 Maple AveFeb 5, 2026Manufacture (eaton) is to repair internal control wiring within main switchboard ms1. also need to add gfi protection to ms2 switchgear. both switchgears will require utility shutdown and meter release from city · 182 m away
- 3310 Fairmount StJun 17, 2026• remove and replace 60” pocket door and frame from bedroom to library • remove and replace 32” pocket door and frame for master closet • wire in and install 2 pendant lights over master bedroom nightstands, each to be on a separate switch (note: owner to provide light fixtures) • add an electrical outlet on kitchen sink area • wire in and install a recessed electrical outlet for tv • wire in and install 2 electrical outlets for bathroom mirrors • wire in and install pendant light over guest bathroom sink (note: owner to provide light fixture) • remove and replace dining room light fixture (note: owner to provide light fixture) • repair drywall as needed throughout condo • paint walls, ceilings, doors, bookshelves, closets and cabinets except for stain cabinets • remove and haul off existing carpet from library, master bedroom and closet • install new carpet and padding on library master bedroom and closet (note: owner to provide carpet) • install shoe molding on closet area • remove and replace kitchen sink (note: owner to provide sink) • remove and replace kitchen faucet (note: owner to provide faucet fixture) master bathroom:• remove and haul off existing tile floor on bathroom area • remove and haul off existing shower wall tile, shower floor and glass enclosure • build new shower pan of approx 42”x60” • install new shower drain (note: owner to provide shower drain) • remove and replace shower faucet fixture (note: owner to provide shower fixture) • install hardie board on shower walls • build 1 soap niche • apply red guard sealant on shower walls • install tile and grout on shower floors and shower walls up to ceiling including exterior of pony wall (note: owner to provide tile and grout) • custom build and install a clear frameless shower door and panel with dfi protection • install tile and grout on bathroom floor (note: owner to provide tile and grout) • remove and reset existing toilet • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders) guest bathroom:• remove tub door • remove tub surround tile and backer board • install new faucet fixture and tub drain covers (note: owner to provide faucet fixture and tub drain covers) • install backer board on existing tub surround to prepare for plaster • custom build and install a clear frameless shower door with dfi protection • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vessel vanity sink. (note owner to provide sink.)• replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders) · 182 m away
- 3001 Maple Avenue · 3001 Maple LPApr 24, 2025The related companies — renovation/alteration — tenant improvement · 184 m away
- 3001 Maple Avenue Suites 310, 320 And 330 · 3001 Maple LPApr 24, 20253rd floor spec suites — renovation/alteration — tenant improvement · 184 m away
- 3001 Maple Terrace · 3001 Maple LPJun 16, 2026Legacy knight expansion — renovation/alteration — tenant improvement · 184 m away