Interior condo renovations at 3310 Fairmount St
City of Dallas permit records point to interior renovations in condo units at 3310 Fairmount St, including whole-unit remodels and bathroom, kitchen, plumbing and electrical work. The first listed filing was May 21, 2025, and the latest was June 17, 2026.
Summarized from City of Dallas records · updated Jun 17, 2026
- Projects
- 23
- 23 filings
- Latest filing
- Jun 17, 2026
- since Oct 8, 2020
- Largest scope
- —
- Listed value
- $12
- partial · often understated
Permit & project history
23 projects• remove and replace 60” pocket door and frame from bedroom to library • remove and replace 32” pocket door and frame for master closet • wire in and install 2 pendant lights over master bedroom nightstands, each to be on a separate switch (note: owner to provide light fixtures) • add an electrical outlet on kitchen sink area • wire in and install a recessed electrical outlet for tv • wire in and install 2 electrical outlets for bathroom mirrors • wire in and install pendant light over guest bathroom sink (note: owner to provide light fixture) • remove and replace dining room light fixture (note: owner to provide light fixture) • repair drywall as needed throughout condo • paint walls, ceilings, doors, bookshelves, closets and cabinets except for stain cabinets • remove and haul off existing carpet from library, master bedroom and closet • install new carpet and padding on library master bedroom and closet (note: owner to provide carpet) • install shoe molding on closet area • remove and replace kitchen sink (note: owner to provide sink) • remove and replace kitchen faucet (note: owner to provide faucet fixture) master bathroom:• remove and haul off existing tile floor on bathroom area • remove and haul off existing shower wall tile, shower floor and glass enclosure • build new shower pan of approx 42”x60” • install new shower drain (note: owner to provide shower drain) • remove and replace shower faucet fixture (note: owner to provide shower fixture) • install hardie board on shower walls • build 1 soap niche • apply red guard sealant on shower walls • install tile and grout on shower floors and shower walls up to ceiling including exterior of pony wall (note: owner to provide tile and grout) • custom build and install a clear frameless shower door and panel with dfi protection • install tile and grout on bathroom floor (note: owner to provide tile and grout) • remove and reset existing toilet • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders) guest bathroom:• remove tub door • remove tub surround tile and backer board • install new faucet fixture and tub drain covers (note: owner to provide faucet fixture and tub drain covers) • install backer board on existing tub surround to prepare for plaster • custom build and install a clear frameless shower door with dfi protection • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vessel vanity sink. (note owner to provide sink.)• replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders)
• remove and replace 60” pocket door and frame from bedroom to library • remove and replace 32” pocket door and frame for master closet • wire in and install 2 pendant lights over master bedroom nightstands, each to be on a separate switch (note: owner to provide light fixtures) • add an electrical outlet on kitchen sink area • wire in and install a recessed electrical outlet for tv • wire in and install 2 electrical outlets for bathroom mirrors • wire in and install pendant light over guest bathroom sink (note: owner to provide light fixture) • remove and replace dining room light fixture (note: owner to provide light fixture) • repair drywall as needed throughout condo • paint walls, ceilings, doors, bookshelves, closets and cabinets except for stain cabinets • remove and haul off existing carpet from library, master bedroom and closet • install new carpet and padding on library master bedroom and closet (note: owner to provide carpet) • install shoe molding on closet area • remove and replace kitchen sink (note: owner to provide sink) • remove and replace kitchen faucet (note: owner to provide faucet fixture) master bathroom:• remove and haul off existing tile floor on bathroom area • remove and haul off existing shower wall tile, shower floor and glass enclosure • build new shower pan of approx 42”x60” • install new shower drain (note: owner to provide shower drain) • remove and replace shower faucet fixture (note: owner to provide shower fixture) • install hardie board on shower walls • build 1 soap niche • apply red guard sealant on shower walls • install tile and grout on shower floors and shower walls up to ceiling including exterior of pony wall (note: owner to provide tile and grout) • custom build and install a clear frameless shower door and panel with dfi protection • install tile and grout on bathroom floor (note: owner to provide tile and grout) • remove and reset existing toilet • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders) guest bathroom:• remove tub door • remove tub surround tile and backer board • install new faucet fixture and tub drain covers (note: owner to provide faucet fixture and tub drain covers) • install backer board on existing tub surround to prepare for plaster • custom build and install a clear frameless shower door with dfi protection • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vessel vanity sink. (note owner to provide sink.)• replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders)
City of Dallas permitCommercial Alteration Addition Permit• remove and replace 60” pocket door and frame from bedroom to library • remove and replace 32” pocket door and frame for master closet • wire in and install 2 pendant lights over master bedroom nightstands, each to be on a separate switch (note: owner to provide light fixtures) • add an electrical outlet on kitchen sink area • wire in and install a recessed electrical outlet for tv • wire in and install 2 electrical outlets for bathroom mirrors • wire in and install pendant light over guest bathroom sink (note: owner to provide light fixture) • remove and replace dining room light fixture (note: owner to provide light fixture) • repair drywall as needed throughout condo • paint walls, ceilings, doors, bookshelves, closets and cabinets except for stain cabinets • remove and haul off existing carpet from library, master bedroom and closet • install new carpet and padding on library master bedroom and closet (note: owner to provide carpet) • install shoe molding on closet area • remove and replace kitchen sink (note: owner to provide sink) • remove and replace kitchen faucet (note: owner to provide faucet fixture) master bathroom:• remove and haul off existing tile floor on bathroom area • remove and haul off existing shower wall tile, shower floor and glass enclosure • build new shower pan of approx 42”x60” • install new shower drain (note: owner to provide shower drain) • remove and replace shower faucet fixture (note: owner to provide shower fixture) • install hardie board on shower walls • build 1 soap niche • apply red guard sealant on shower walls • install tile and grout on shower floors and shower walls up to ceiling including exterior of pony wall (note: owner to provide tile and grout) • custom build and install a clear frameless shower door and panel with dfi protection • install tile and grout on bathroom floor (note: owner to provide tile and grout) • remove and reset existing toilet • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders) guest bathroom:• remove tub door • remove tub surround tile and backer board • install new faucet fixture and tub drain covers (note: owner to provide faucet fixture and tub drain covers) • install backer board on existing tub surround to prepare for plaster • custom build and install a clear frameless shower door with dfi protection • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vessel vanity sink. (note owner to provide sink.)• replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders)
• remove and replace 60” pocket door and frame from bedroom to library • remove and replace 32” pocket door and frame for master closet • wire in and install 2 pendant lights over master bedroom nightstands, each to be on a separate switch (note: owner to provide light fixtures) • add an electrical outlet on kitchen sink area • wire in and install a recessed electrical outlet for tv • wire in and install 2 electrical outlets for bathroom mirrors • wire in and install pendant light over guest bathroom sink (note: owner to provide light fixture) • remove and replace dining room light fixture (note: owner to provide light fixture) • repair drywall as needed throughout condo • paint walls, ceilings, doors, bookshelves, closets and cabinets except for stain cabinets • remove and haul off existing carpet from library, master bedroom and closet • install new carpet and padding on library master bedroom and closet (note: owner to provide carpet) • install shoe molding on closet area • remove and replace kitchen sink (note: owner to provide sink) • remove and replace kitchen faucet (note: owner to provide faucet fixture) master bathroom:• remove and haul off existing tile floor on bathroom area • remove and haul off existing shower wall tile, shower floor and glass enclosure • build new shower pan of approx 42”x60” • install new shower drain (note: owner to provide shower drain) • remove and replace shower faucet fixture (note: owner to provide shower fixture) • install hardie board on shower walls • build 1 soap niche • apply red guard sealant on shower walls • install tile and grout on shower floors and shower walls up to ceiling including exterior of pony wall (note: owner to provide tile and grout) • custom build and install a clear frameless shower door and panel with dfi protection • install tile and grout on bathroom floor (note: owner to provide tile and grout) • remove and reset existing toilet • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders) guest bathroom:• remove tub door • remove tub surround tile and backer board • install new faucet fixture and tub drain covers (note: owner to provide faucet fixture and tub drain covers) • install backer board on existing tub surround to prepare for plaster • custom build and install a clear frameless shower door with dfi protection • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vessel vanity sink. (note owner to provide sink.)• replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders)
City of Dallas permitResidential Alteration Addition PermitMaster bath: floor tile replacementshower replacement: new pan liner, shower valve + trim, shower drain, wall tile and pan tile, and glassnew vanity faucetremove & re-install toilet replace angle stops as neededreplace wall hung mirror & cabinet hardwaresheetrock and texture repairs paintadd plug for lighted mirror hall bath: convert tub surround full height wing wall to pony wallremove tub surround tile, install backer board and apply waterproof plasterreplace shower/tub combo valve & trimreplace tub drain trimreplace vanity faucet & sink replace angle stops as needed install new wall hung mirror & cabinet hardwaresheetrock & texture repairs paintadd plug for lighted mirror & pendant light over vanitymaster bedroom, closet, & study: replace carpetadd 2 sconce lights on either side of bed kitchen: replace kitchen sink add splash plug entire condo: paintsheetrock & texture repairs trim & door repairs replace & install new light fixtures dining chandelier** address department is adding this condo unit into the system. the owner and parcel number might change. this work is being done in unit 15c
Master bath: floor tile replacementshower replacement: new pan liner, shower valve + trim, shower drain, wall tile and pan tile, and glassnew vanity faucetremove & re-install toilet replace angle stops as neededreplace wall hung mirror & cabinet hardwaresheetrock and texture repairs paintadd plug for lighted mirror hall bath: convert tub surround full height wing wall to pony wallremove tub surround tile, install backer board and apply waterproof plasterreplace shower/tub combo valve & trimreplace tub drain trimreplace vanity faucet & sink replace angle stops as needed install new wall hung mirror & cabinet hardwaresheetrock & texture repairs paintadd plug for lighted mirror & pendant light over vanitymaster bedroom, closet, & study: replace carpetadd 2 sconce lights on either side of bed kitchen: replace kitchen sink add splash plug entire condo: paintsheetrock & texture repairs trim & door repairs replace & install new light fixtures dining chandelier** address department is adding this condo unit into the system. the owner and parcel number might change. this work is being done in unit 15c
City of Dallas permitResidential Alteration Addition PermitMcr remodel of whole unit- moving walls, new cabinets, new countertops, new mep locations and fixtures, update flooring, no external changes- mechanical rework for hvac, plumbing rework for new locations/fixtures, electrical rework for new locations/fixtures
Mcr remodel of whole unit- moving walls, new cabinets, new countertops, new mep locations and fixtures, update flooring, no external changes- mechanical rework for hvac, plumbing rework for new locations/fixtures, electrical rework for new locations/fixtures
City of Dallas permitCommercial Alteration Addition PermitNsfaa remodel of whole unit- moving walls, new cabinets, new countertops, new mep locations and fixtures, update flooring, no external changes- mechanical rework for hvac, plumbing rework for new locations/fixtures, electrical rework for new locations/fixtures
Nsfaa remodel of whole unit- moving walls, new cabinets, new countertops, new mep locations and fixtures, update flooring, no external changes- mechanical rework for hvac, plumbing rework for new locations/fixtures, electrical rework for new locations/fixtures
City of Dallas permitResidential Alteration Addition PermitMinor alteration apartment 12c 2 bathrooms= 2 shower pans, new valves, 2 bathroom sinks & 1 kit sink
Minor alteration apartment 12c 2 bathrooms= 2 shower pans, new valves, 2 bathroom sinks & 1 kit sink
City of Dallas permitCommercial Plumbing PermitPark towers condo interior remodel at unit 12c. no building envelope changes, no large systems changes; no changes in load bearing walls, nor any breeches in existing fire separation. remove crown molding, add ceiling layer fur-down in order to add new lighting and electrical. primary ensuite with new his and her closets. kitchen expansion. create office/dining/living in large open area. relocating existing electrical panel to other side of the wall and new laundry closet
Park towers condo interior remodel at unit 12c. no building envelope changes, no large systems changes; no changes in load bearing walls, nor any breeches in existing fire separation. remove crown molding, add ceiling layer fur-down in order to add new lighting and electrical. primary ensuite with new his and her closets. kitchen expansion. create office/dining/living in large open area. relocating existing electrical panel to other side of the wall and new laundry closet
City of Dallas permitCommercial Alteration Addition PermitPark towers high-rise (12th floor), individual home-owned condominium 12c remodel.no load bearing wall alterations, no alterations to hvac and no alterations to fire wall or building envelope. remove crown molding and drop ceiling height 6"-8" (as noted on proposed floorplan) for installation of lighting and electrical at ceiling, thought out unit. primary ensuite with his/her closets and restroom mark-over. kitchen expansion, create office/living room/dining space. relocate existing electrical panel (other side of wall) and new laundry closet
Park towers high-rise (12th floor), individual home-owned condominium 12c remodel.no load bearing wall alterations, no alterations to hvac and no alterations to fire wall or building envelope. remove crown molding and drop ceiling height 6"-8" (as noted on proposed floorplan) for installation of lighting and electrical at ceiling, thought out unit. primary ensuite with his/her closets and restroom mark-over. kitchen expansion, create office/living room/dining space. relocate existing electrical panel (other side of wall) and new laundry closet
City of Dallas permitResidential Alteration Addition PermitThis is for 16d. replace some lighting with upgraded led can lighting and add switches and outlets.relocate panel.this is a partial remodel
This is for 16d. replace some lighting with upgraded led can lighting and add switches and outlets.relocate panel.this is a partial remodel
City of Dallas permitResidential Electrical Permit
Sources: City of Dallas
Questions about 3310 Fairmount St
What is being built at 3310 Fairmount St in Dallas?
City permits point to renovations inside condo units, not a new building. Records describe whole-unit remodels and updates to bathrooms, kitchens, plumbing, electrical systems and mechanical equipment.
Is a new apartment building planned at 3310 Fairmount St?
The permit records provided describe work inside existing units, including a condo remodel and work in apartment unit 12C. They do not show a permit for a new apartment building.
When were permits filed for work at 3310 Fairmount St?
The first filing in the records is dated May 21, 2025. The latest listed permit is dated June 17, 2026.
What does the latest permit for 3310 Fairmount St cover?
The June 17, 2026 permit, COM-ALT-ADD-26-001452, describes interior work in a condo, including door, lighting, electrical, carpet, kitchen and bathroom updates.
Are the renovations at 3310 Fairmount St exterior work?
A whole-unit remodel permit dated March 11, 2026, says there are no external changes. Other listed permits describe interior work.
How many permit records are listed for 3310 Fairmount St?
The fact sheet lists 16 City of Dallas permit records, with filing dates from May 21, 2025, through June 17, 2026.
Also being built nearby
All of 75201- 2706 Turtle Creek CirJun 14, 2021Remodel and addition_2706 turtle creek circle · 132 m away
- 2502 Turtle Creek BlvdJun 10, 2025New 100a 120/240v 1ph service for verizon wireless small cell node · 141 m away
- 2706 Turtle Creek CirAug 7, 2026New house · 152 m away
- 3120 Routh StMay 26, 2026Meter base · 173 m away
- 3131 Maple AveDec 16, 20251. remove all loose gravel and broadcast on the main roof. 2. tear off existing roof and lightweight concrete down to the steel deck. 3. remove and replace existing steel deck with new b-deck. 4. mechanically attach two layers of 2.2" iso & 5/8" storm x coverboard. 5. mechanically attach 1/4" per foot full tapered iso sloped to all four sides. 6. torch apply a 2-ply modified bitumen base and cap sheet. 7. install new prefabricated drip edge metal along with prefabricated gutter and downspouts. 8. install new wall mounted ladder for access directly to the penthouse roof from the main roof · 182 m away
- 3200 Maple AveOct 28, 2025Replacing 4” double check · 190 m away
- 2525 Carlisle StFeb 3, 2026Dc repair · 217 m away
- 2505 Turtle Creek Blvd · Vivante Turtle Creek, LLCSep 28, 2026Install full electrical for the building, including new electrical service · 236 m away
- 3102 Maple AveJan 22, 2026Plumbing remodel of existing space. space was previously a full floor occupant and is now divided into multiple tenant spaces · 243 m away
- 3102 Maple Avenue 4th · Maple Country, Ltd.Oct 7, 20254th floor corr, rr, and elev lobby — renovation/alteration — capital improvements · 243 m away
- 3102 Maple Avenue Suites 425 And 450 · Maple Country, Ltd.Oct 1, 2025Spec suites 425 & 450 — renovation/alteration — speculative suites · 243 m away
- 3102 Maple Avenue · Maple Country, Ltd.Aug 11, 2025Ashton gray — renovation/alteration — tenant improvement · 243 m away
More apartments & multifamily in 75201, offices in 75201, restaurants in 75201.