3310 Fairmount St

Dallas, TX 75201

Interior condo renovations at 3310 Fairmount St

City of Dallas permit records point to interior renovations in condo units at 3310 Fairmount St, including whole-unit remodels and bathroom, kitchen, plumbing and electrical work. The first listed filing was May 21, 2025, and the latest was June 17, 2026.

Summarized from City of Dallas records · updated Jun 17, 2026

Projects
23
23 filings
Latest filing
Jun 17, 2026
since Oct 8, 2020
Largest scope
—
Listed value
$12
partial · often understated

Permit & project history

23 projects
  1. • remove and replace 60” pocket door and frame from bedroom to library • remove and replace 32” pocket door and frame for master closet • wire in and install 2 pendant lights over master bedroom nightstands, each to be on a separate switch (note: owner to provide light fixtures) • add an electrical outlet on kitchen sink area • wire in and install a recessed electrical outlet for tv • wire in and install 2 electrical outlets for bathroom mirrors • wire in and install pendant light over guest bathroom sink (note: owner to provide light fixture) • remove and replace dining room light fixture (note: owner to provide light fixture) • repair drywall as needed throughout condo • paint walls, ceilings, doors, bookshelves, closets and cabinets except for stain cabinets • remove and haul off existing carpet from library, master bedroom and closet • install new carpet and padding on library master bedroom and closet (note: owner to provide carpet) • install shoe molding on closet area • remove and replace kitchen sink (note: owner to provide sink) • remove and replace kitchen faucet (note: owner to provide faucet fixture) master bathroom:• remove and haul off existing tile floor on bathroom area • remove and haul off existing shower wall tile, shower floor and glass enclosure • build new shower pan of approx 42”x60” • install new shower drain (note: owner to provide shower drain) • remove and replace shower faucet fixture (note: owner to provide shower fixture) • install hardie board on shower walls • build 1 soap niche • apply red guard sealant on shower walls • install tile and grout on shower floors and shower walls up to ceiling including exterior of pony wall (note: owner to provide tile and grout) • custom build and install a clear frameless shower door and panel with dfi protection • install tile and grout on bathroom floor (note: owner to provide tile and grout) • remove and reset existing toilet • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders) guest bathroom:• remove tub door • remove tub surround tile and backer board • install new faucet fixture and tub drain covers (note: owner to provide faucet fixture and tub drain covers) • install backer board on existing tub surround to prepare for plaster • custom build and install a clear frameless shower door with dfi protection • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vessel vanity sink. (note owner to provide sink.)• replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders)

    • remove and replace 60” pocket door and frame from bedroom to library • remove and replace 32” pocket door and frame for master closet • wire in and install 2 pendant lights over master bedroom nightstands, each to be on a separate switch (note: owner to provide light fixtures) • add an electrical outlet on kitchen sink area • wire in and install a recessed electrical outlet for tv • wire in and install 2 electrical outlets for bathroom mirrors • wire in and install pendant light over guest bathroom sink (note: owner to provide light fixture) • remove and replace dining room light fixture (note: owner to provide light fixture) • repair drywall as needed throughout condo • paint walls, ceilings, doors, bookshelves, closets and cabinets except for stain cabinets • remove and haul off existing carpet from library, master bedroom and closet • install new carpet and padding on library master bedroom and closet (note: owner to provide carpet) • install shoe molding on closet area • remove and replace kitchen sink (note: owner to provide sink) • remove and replace kitchen faucet (note: owner to provide faucet fixture) master bathroom:• remove and haul off existing tile floor on bathroom area • remove and haul off existing shower wall tile, shower floor and glass enclosure • build new shower pan of approx 42”x60” • install new shower drain (note: owner to provide shower drain) • remove and replace shower faucet fixture (note: owner to provide shower fixture) • install hardie board on shower walls • build 1 soap niche • apply red guard sealant on shower walls • install tile and grout on shower floors and shower walls up to ceiling including exterior of pony wall (note: owner to provide tile and grout) • custom build and install a clear frameless shower door and panel with dfi protection • install tile and grout on bathroom floor (note: owner to provide tile and grout) • remove and reset existing toilet • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders) guest bathroom:• remove tub door • remove tub surround tile and backer board • install new faucet fixture and tub drain covers (note: owner to provide faucet fixture and tub drain covers) • install backer board on existing tub surround to prepare for plaster • custom build and install a clear frameless shower door with dfi protection • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vessel vanity sink. (note owner to provide sink.)• replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders)

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-001452
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. • remove and replace 60” pocket door and frame from bedroom to library • remove and replace 32” pocket door and frame for master closet • wire in and install 2 pendant lights over master bedroom nightstands, each to be on a separate switch (note: owner to provide light fixtures) • add an electrical outlet on kitchen sink area • wire in and install a recessed electrical outlet for tv • wire in and install 2 electrical outlets for bathroom mirrors • wire in and install pendant light over guest bathroom sink (note: owner to provide light fixture) • remove and replace dining room light fixture (note: owner to provide light fixture) • repair drywall as needed throughout condo • paint walls, ceilings, doors, bookshelves, closets and cabinets except for stain cabinets • remove and haul off existing carpet from library, master bedroom and closet • install new carpet and padding on library master bedroom and closet (note: owner to provide carpet) • install shoe molding on closet area • remove and replace kitchen sink (note: owner to provide sink) • remove and replace kitchen faucet (note: owner to provide faucet fixture) master bathroom:• remove and haul off existing tile floor on bathroom area • remove and haul off existing shower wall tile, shower floor and glass enclosure • build new shower pan of approx 42”x60” • install new shower drain (note: owner to provide shower drain) • remove and replace shower faucet fixture (note: owner to provide shower fixture) • install hardie board on shower walls • build 1 soap niche • apply red guard sealant on shower walls • install tile and grout on shower floors and shower walls up to ceiling including exterior of pony wall (note: owner to provide tile and grout) • custom build and install a clear frameless shower door and panel with dfi protection • install tile and grout on bathroom floor (note: owner to provide tile and grout) • remove and reset existing toilet • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders) guest bathroom:• remove tub door • remove tub surround tile and backer board • install new faucet fixture and tub drain covers (note: owner to provide faucet fixture and tub drain covers) • install backer board on existing tub surround to prepare for plaster • custom build and install a clear frameless shower door with dfi protection • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vessel vanity sink. (note owner to provide sink.)• replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders)

    • remove and replace 60” pocket door and frame from bedroom to library • remove and replace 32” pocket door and frame for master closet • wire in and install 2 pendant lights over master bedroom nightstands, each to be on a separate switch (note: owner to provide light fixtures) • add an electrical outlet on kitchen sink area • wire in and install a recessed electrical outlet for tv • wire in and install 2 electrical outlets for bathroom mirrors • wire in and install pendant light over guest bathroom sink (note: owner to provide light fixture) • remove and replace dining room light fixture (note: owner to provide light fixture) • repair drywall as needed throughout condo • paint walls, ceilings, doors, bookshelves, closets and cabinets except for stain cabinets • remove and haul off existing carpet from library, master bedroom and closet • install new carpet and padding on library master bedroom and closet (note: owner to provide carpet) • install shoe molding on closet area • remove and replace kitchen sink (note: owner to provide sink) • remove and replace kitchen faucet (note: owner to provide faucet fixture) master bathroom:• remove and haul off existing tile floor on bathroom area • remove and haul off existing shower wall tile, shower floor and glass enclosure • build new shower pan of approx 42”x60” • install new shower drain (note: owner to provide shower drain) • remove and replace shower faucet fixture (note: owner to provide shower fixture) • install hardie board on shower walls • build 1 soap niche • apply red guard sealant on shower walls • install tile and grout on shower floors and shower walls up to ceiling including exterior of pony wall (note: owner to provide tile and grout) • custom build and install a clear frameless shower door and panel with dfi protection • install tile and grout on bathroom floor (note: owner to provide tile and grout) • remove and reset existing toilet • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders) guest bathroom:• remove tub door • remove tub surround tile and backer board • install new faucet fixture and tub drain covers (note: owner to provide faucet fixture and tub drain covers) • install backer board on existing tub surround to prepare for plaster • custom build and install a clear frameless shower door with dfi protection • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vessel vanity sink. (note owner to provide sink.)• replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders)

    City of Dallas permitResidential Alteration Addition Permit
    Record
    RES-ALT-ADD-26-001142
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Remodel plumbing drains, and water lines

    Remodel plumbing drains, and water lines

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-26-001968
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Install all new flexible ductwork and exhaust fans

    Install all new flexible ductwork and exhaust fans

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-26-000781
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Master bath: floor tile replacementshower replacement: new pan liner, shower valve + trim, shower drain, wall tile and pan tile, and glassnew vanity faucetremove & re-install toilet replace angle stops as neededreplace wall hung mirror & cabinet hardwaresheetrock and texture repairs paintadd plug for lighted mirror hall bath: convert tub surround full height wing wall to pony wallremove tub surround tile, install backer board and apply waterproof plasterreplace shower/tub combo valve & trimreplace tub drain trimreplace vanity faucet & sink replace angle stops as needed install new wall hung mirror & cabinet hardwaresheetrock & texture repairs paintadd plug for lighted mirror & pendant light over vanitymaster bedroom, closet, & study: replace carpetadd 2 sconce lights on either side of bed kitchen: replace kitchen sink add splash plug entire condo: paintsheetrock & texture repairs trim & door repairs replace & install new light fixtures dining chandelier** address department is adding this condo unit into the system. the owner and parcel number might change. this work is being done in unit 15c

    Master bath: floor tile replacementshower replacement: new pan liner, shower valve + trim, shower drain, wall tile and pan tile, and glassnew vanity faucetremove & re-install toilet replace angle stops as neededreplace wall hung mirror & cabinet hardwaresheetrock and texture repairs paintadd plug for lighted mirror hall bath: convert tub surround full height wing wall to pony wallremove tub surround tile, install backer board and apply waterproof plasterreplace shower/tub combo valve & trimreplace tub drain trimreplace vanity faucet & sink replace angle stops as needed install new wall hung mirror & cabinet hardwaresheetrock & texture repairs paintadd plug for lighted mirror & pendant light over vanitymaster bedroom, closet, & study: replace carpetadd 2 sconce lights on either side of bed kitchen: replace kitchen sink add splash plug entire condo: paintsheetrock & texture repairs trim & door repairs replace & install new light fixtures dining chandelier** address department is adding this condo unit into the system. the owner and parcel number might change. this work is being done in unit 15c

    City of Dallas permitResidential Alteration Addition Permit
    Record
    RES-ALT-ADD-26-000564
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Electrical remodel

    Electrical remodel

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-001225
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Mcr remodel of whole unit- moving walls, new cabinets, new countertops, new mep locations and fixtures, update flooring, no external changes- mechanical rework for hvac, plumbing rework for new locations/fixtures, electrical rework for new locations/fixtures

    Mcr remodel of whole unit- moving walls, new cabinets, new countertops, new mep locations and fixtures, update flooring, no external changes- mechanical rework for hvac, plumbing rework for new locations/fixtures, electrical rework for new locations/fixtures

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-000427
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. Nsfaa remodel of whole unit- moving walls, new cabinets, new countertops, new mep locations and fixtures, update flooring, no external changes- mechanical rework for hvac, plumbing rework for new locations/fixtures, electrical rework for new locations/fixtures

    Nsfaa remodel of whole unit- moving walls, new cabinets, new countertops, new mep locations and fixtures, update flooring, no external changes- mechanical rework for hvac, plumbing rework for new locations/fixtures, electrical rework for new locations/fixtures

    City of Dallas permitResidential Alteration Addition Permit
    Record
    RES-ALT-ADD-26-000336
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. 2 chilling water fan coils

    2 chilling water fan coils

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-26-000004
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  10. Minor alteration apartment 12c 2 bathrooms= 2 shower pans, new valves, 2 bathroom sinks & 1 kit sink

    Minor alteration apartment 12c 2 bathrooms= 2 shower pans, new valves, 2 bathroom sinks & 1 kit sink

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-25-003300
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  11. 2 chilling water fan coils bu permit com-alt-add-25-000998

    2 chilling water fan coils bu permit com-alt-add-25-000998

    City of Dallas permitResidential Mechanical Permit
    Record
    RES-MEC-25-004069
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  12. Electrical remoel

    Electrical remoel

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-002811
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  13. Park towers condo interior remodel at unit 12c. no building envelope changes, no large systems changes; no changes in load bearing walls, nor any breeches in existing fire separation. remove crown molding, add ceiling layer fur-down in order to add new lighting and electrical. primary ensuite with new his and her closets. kitchen expansion. create office/dining/living in large open area. relocating existing electrical panel to other side of the wall and new laundry closet

    Park towers condo interior remodel at unit 12c. no building envelope changes, no large systems changes; no changes in load bearing walls, nor any breeches in existing fire separation. remove crown molding, add ceiling layer fur-down in order to add new lighting and electrical. primary ensuite with new his and her closets. kitchen expansion. create office/dining/living in large open area. relocating existing electrical panel to other side of the wall and new laundry closet

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-25-000998
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  14. Park towers high-rise (12th floor), individual home-owned condominium 12c remodel.no load bearing wall alterations, no alterations to hvac and no alterations to fire wall or building envelope. remove crown molding and drop ceiling height 6"-8" (as noted on proposed floorplan) for installation of lighting and electrical at ceiling, thought out unit. primary ensuite with his/her closets and restroom mark-over. kitchen expansion, create office/living room/dining space. relocate existing electrical panel (other side of wall) and new laundry closet

    Park towers high-rise (12th floor), individual home-owned condominium 12c remodel.no load bearing wall alterations, no alterations to hvac and no alterations to fire wall or building envelope. remove crown molding and drop ceiling height 6"-8" (as noted on proposed floorplan) for installation of lighting and electrical at ceiling, thought out unit. primary ensuite with his/her closets and restroom mark-over. kitchen expansion, create office/living room/dining space. relocate existing electrical panel (other side of wall) and new laundry closet

    City of Dallas permitResidential Alteration Addition Permit
    Record
    RES-ALT-ADD-25-000729
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  15. Interior remodel

    Interior remodel

    City of Dallas permitResidential Plumbing Permit
    Record
    RES-PLM-25-000252
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  16. This is for 16d. replace some lighting with upgraded led can lighting and add switches and outlets.relocate panel.this is a partial remodel

    This is for 16d. replace some lighting with upgraded led can lighting and add switches and outlets.relocate panel.this is a partial remodel

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-25-000236
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  17. Interior remodel only

    Interior remodel only

    City of Dallas permitBuilding (BU) Multi Family Renovation$5
    Record
    2009211004
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  18. Interior remodel only

    Interior remodel only

    City of Dallas permitBuilding (BU) Multi Family Renovation$7
    Record
    2009231024
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  19. Tc-2020-19152 08/25/2020 to 08/29/2020

    Tc-2020-19152 08/25/2020 to 08/29/2020

    City of Dallas permitBarricade (BA) Commercial Alteration
    Record
    2008251104
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  20. Change out lobby windows and doors/change (1) door to window

    Change out lobby windows and doors/change (1) door to window

    City of Dallas permitBuilding (BU) Multi Family Renovation$108
    Record
    2005211005
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  21. Int / ext remodel of unit

    Int / ext remodel of unit

    City of Dallas permitBuilding (BU) Multi Family Renovation$2
    Record
    2001081051
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  22. Remodel existing plumbing

    Remodel existing plumbing

    City of Dallas permitPlumbing (PL) Multi Family Alteration$5
    Record
    2001033008
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  23. Remodel existing plumbing

    Remodel existing plumbing

    City of Dallas permitPlumbing (PL) Multi Family Alteration$72
    Record
    1910293257
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 3310 Fairmount St

What is being built at 3310 Fairmount St in Dallas?

City permits point to renovations inside condo units, not a new building. Records describe whole-unit remodels and updates to bathrooms, kitchens, plumbing, electrical systems and mechanical equipment.

Is a new apartment building planned at 3310 Fairmount St?

The permit records provided describe work inside existing units, including a condo remodel and work in apartment unit 12C. They do not show a permit for a new apartment building.

When were permits filed for work at 3310 Fairmount St?

The first filing in the records is dated May 21, 2025. The latest listed permit is dated June 17, 2026.

What does the latest permit for 3310 Fairmount St cover?

The June 17, 2026 permit, COM-ALT-ADD-26-001452, describes interior work in a condo, including door, lighting, electrical, carpet, kitchen and bathroom updates.

Are the renovations at 3310 Fairmount St exterior work?

A whole-unit remodel permit dated March 11, 2026, says there are no external changes. Other listed permits describe interior work.

How many permit records are listed for 3310 Fairmount St?

The fact sheet lists 16 City of Dallas permit records, with filing dates from May 21, 2025, through June 17, 2026.