groundranger
Historic · latest filing Jun 2021Residential

2706 Turtle Creek Cir

Dallas, TX 75219

2706 Turtle Creek Cir: 2 projects on record

City of Dallas lists 2 filings across 2 projects at 2706 Turtle Creek Cir, Dallas, TX 75219. The most recent, filed June 14, 2021, covers: “Remodel and addition_2706 turtle creek circle”.

Compiled from City of Dallas records · updated Jun 14, 2021

Projects
2
2 filings
Latest filing
Jun 14, 2021
since Jun 14, 2021
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. Remodel and addition_2706 turtle creek circle

    Remodel and addition_2706 turtle creek circle

    City of Dallas permitResidential Plumbing Permit
    Record
    2106141014_166274447-003_PL_1
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Remodel and addition_2706 turtle creek circle

    Remodel and addition_2706 turtle creek circle

    City of Dallas permitResidential Plumbing Permit
    Record
    2106141013_166274447-002_PL_1
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 2706 Turtle Creek Cir

What is being built at 2706 Turtle Creek Cir?

The latest filing (City of Dallas permit 2106141014_166274447-003_PL_1, June 14, 2021) covers remodel and addition_2706 turtle creek circle.

How many permits and filings does 2706 Turtle Creek Cir have?

2 filings across 2 projects, from June 14, 2021 to June 14, 2021.

What is being built near Vivante Turtle Creek, in Dallas?

2706 Turtle Creek Cir is about 129 m from Vivante Turtle Creek, (2505 Turtle Creek Blvd). Its latest filing is for remodel and addition_2706 turtle creek circle.

Is there other construction near 2706 Turtle Creek Cir?

Yes. Nearby filings include 3120 Routh St (meter base, May 26, 2026); 2505 Turtle Creek Blvd (install full electrical for the building, including new electrical service, Sep 28, 2026); 3310 Fairmount St (• remove and replace 60” pocket door and frame from bedroom to library • remove and replace 32” pocket door and frame for master closet • wire in and install 2 pendant lights over master bedroom nightstands, each to be on a separate switch (note: owner to provide light fixtures) • add an electrical outlet on kitchen sink area • wire in and install a recessed electrical outlet for tv • wire in and install 2 electrical outlets for bathroom mirrors • wire in and install pendant light over guest bathroom sink (note: owner to provide light fixture) • remove and replace dining room light fixture (note: owner to provide light fixture) • repair drywall as needed throughout condo • paint walls, ceilings, doors, bookshelves, closets and cabinets except for stain cabinets • remove and haul off existing carpet from library, master bedroom and closet • install new carpet and padding on library master bedroom and closet (note: owner to provide carpet) • install shoe molding on closet area • remove and replace kitchen sink (note: owner to provide sink) • remove and replace kitchen faucet (note: owner to provide faucet fixture) master bathroom:• remove and haul off existing tile floor on bathroom area • remove and haul off existing shower wall tile, shower floor and glass enclosure • build new shower pan of approx 42”x60” • install new shower drain (note: owner to provide shower drain) • remove and replace shower faucet fixture (note: owner to provide shower fixture) • install hardie board on shower walls • build 1 soap niche • apply red guard sealant on shower walls • install tile and grout on shower floors and shower walls up to ceiling including exterior of pony wall (note: owner to provide tile and grout) • custom build and install a clear frameless shower door and panel with dfi protection • install tile and grout on bathroom floor (note: owner to provide tile and grout) • remove and reset existing toilet • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders) guest bathroom:• remove tub door • remove tub surround tile and backer board • install new faucet fixture and tub drain covers (note: owner to provide faucet fixture and tub drain covers) • install backer board on existing tub surround to prepare for plaster • custom build and install a clear frameless shower door with dfi protection • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vessel vanity sink. (note owner to provide sink.)• replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders), Jun 17, 2026).

How do I get alerts for new permits at 2706 Turtle Creek Cir?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 75219
Get alerts for 2706 Turtle Creek Cir