2502 Turtle Creek Blvd
Dallas, TX 75219
New electrical service for a Verizon Wireless small-cell node
A City of Dallas electrical permit filed June 10, 2025, indicates a new 100-amp, 120/240-volt, single-phase electrical service for a Verizon Wireless small-cell node at 2502 Turtle Creek Blvd. The permit is COM-ELC-25-000395.
Summarized from City of Dallas records · updated Jun 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 10, 2025
- since Jun 10, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2502 Turtle Creek Blvd
What is being built at 2502 Turtle Creek Blvd?
A City of Dallas permit indicates new electrical service for a Verizon Wireless small-cell node. The permit was filed June 10, 2025, under COM-ELC-25-000395.
Is a new Verizon Wireless cell site planned at 2502 Turtle Creek Blvd?
The permit description specifies a small-cell node and new 100-amp electrical service. It does not provide details about the node's construction or installation.
When was the permit for 2502 Turtle Creek Blvd filed?
The City of Dallas electrical permit, COM-ELC-25-000395, was filed June 10, 2025.
What's being built near Clover Tower in Dallas?
At 2502 Turtle Creek Blvd, about 359 meters from Clover Tower, a City of Dallas permit indicates new electrical service for a Verizon Wireless small-cell node. The permit was filed June 10, 2025.
What is the permit number for the small-cell node at 2502 Turtle Creek Blvd?
The City of Dallas permit number is COM-ELC-25-000395. It describes a new 100-amp, 120/240-volt, single-phase service for a Verizon Wireless small-cell node.
Also being built nearby
All of 75219- 3310 Fairmount StJun 17, 2026• remove and replace 60” pocket door and frame from bedroom to library • remove and replace 32” pocket door and frame for master closet • wire in and install 2 pendant lights over master bedroom nightstands, each to be on a separate switch (note: owner to provide light fixtures) • add an electrical outlet on kitchen sink area • wire in and install a recessed electrical outlet for tv • wire in and install 2 electrical outlets for bathroom mirrors • wire in and install pendant light over guest bathroom sink (note: owner to provide light fixture) • remove and replace dining room light fixture (note: owner to provide light fixture) • repair drywall as needed throughout condo • paint walls, ceilings, doors, bookshelves, closets and cabinets except for stain cabinets • remove and haul off existing carpet from library, master bedroom and closet • install new carpet and padding on library master bedroom and closet (note: owner to provide carpet) • install shoe molding on closet area • remove and replace kitchen sink (note: owner to provide sink) • remove and replace kitchen faucet (note: owner to provide faucet fixture) master bathroom:• remove and haul off existing tile floor on bathroom area • remove and haul off existing shower wall tile, shower floor and glass enclosure • build new shower pan of approx 42”x60” • install new shower drain (note: owner to provide shower drain) • remove and replace shower faucet fixture (note: owner to provide shower fixture) • install hardie board on shower walls • build 1 soap niche • apply red guard sealant on shower walls • install tile and grout on shower floors and shower walls up to ceiling including exterior of pony wall (note: owner to provide tile and grout) • custom build and install a clear frameless shower door and panel with dfi protection • install tile and grout on bathroom floor (note: owner to provide tile and grout) • remove and reset existing toilet • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders) guest bathroom:• remove tub door • remove tub surround tile and backer board • install new faucet fixture and tub drain covers (note: owner to provide faucet fixture and tub drain covers) • install backer board on existing tub surround to prepare for plaster • custom build and install a clear frameless shower door with dfi protection • install new electrified mirror (note: owner to provide mirror) • replace vanity faucet fixture (note: owner to provide faucet fixture) • replace vessel vanity sink. (note owner to provide sink.)• replace vanity push and pull handles (note: owner to provide push and pull handles) • install towel and toilet paper holders (note: owner to provide towel and toilet paper holders) · 141 m away
- 3516 Routh StAug 14, 2026Lennox 5 ton gas horizontal complete ml17 2-stage sl280 furnace/ hvac replacement · 180 m away
- 3500 Maple Ave · Tr 3500 Maple CorpNov 9, 20262,500 sq ft renovation of existing office multi-purpose space which will include new flooring, wall base and paint throughout, new lighting in renovated areas, new power/data, and new millwork · 187 m away
- 3500 Maple Avenue · Tr 3500 Maple CorpSep 25, 2026Gallian expansion — renovation/alteration — tenant improvements · 187 m away
- 3500 Maple Ave · Lincoln Property CompanyJul 12, 20243500 maple, ste 1150 - gallian firm (392447206) — renovation/alteration — new non load bearing walls, ceiling, finishes, furnishings, millwork, and lighting; no change of use of area, occupancy, or parking · 187 m away
- 3500 Mape Ave · Lincoln Property CompanyFeb 27, 2025Producers midstream - dallas office expansion — renovation/alteration — expansion of existing office space into the adjacent suite consisting of 2,179 usf. scope includes removing a demising wall for access, reworking 4 existing offices into 7, re-using glass fronts, blend and extend of finishes · 187 m away
- 2706 Turtle Creek CirJun 14, 2021Remodel and addition_2706 turtle creek circle · 200 m away
- 2706 Turtle Creek CirAug 7, 2026New house · 203 m away
- 2505 Turtle Creek Blvd · Vivante Turtle Creek, LLCSep 28, 2026Install full electrical for the building, including new electrical service · 229 m away
- 2525 Turtle Creek BlvdSep 14, 2026Level 14: new construction of 20-story assisted living building with 2 levels of underground parking. 2505 turtle creek · 271 m away
- 3120 Routh StMay 26, 2026Meter base · 286 m away
- 3600 Routh StJul 27, 2026Install electrical · 288 m away