3500 Maple Ave
Dallas, TX 75201 · Lincoln Property Company
Interior renovations in two suites at 3500 Maple Ave
Two suite renovations are registered at 3500 Maple Ave: work in suite 1150 was filed with TDLR on July 12, 2024, and work in suite 500 was filed on November 28, 2023. Both registrations describe new interior walls, ceilings, finishes, furnishings, millwork and lighting, with no change to use, occupancy or parking. The applicant estimated the suite 1150 project at $330,000.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 12, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Jul 12, 2024
- since Jul 12, 2024
- Largest scope
- 2,926 sf
- Estimated cost
- $330K
- state registration
Where this project stands
Completed3500 Maple, Ste 1150 - Gallian Firm (392447206)
2,926 sq ft · $330K est.
- RegisteredJul 12, 2024
- Plan review
- ConstructionAug '24 – Oct '24
- Inspected
- Closed
Ran as a 2-month build.
4 contacts on this project · 4 phone numbers
Permit & project history
2 projectsNew non load bearing walls, ceiling, finishes, furnishings, millwork, and lighting; no change of use of area, occupancy, or parking. — parkside tower
TDLR project registrationRenovation/AlterationProject Closed2,926 sq ft$330K est.- Project #
- TABS2024022920
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
New non load bearing walls, ceiling, finishes, furnishings, millwork, and lighting; no change of use of area, occupancy, or parking. — parkside tower
TDLR project registrationRenovation/AlterationProject Closed10,059 sq ft$305K est.- Project #
- TABS2024006117
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3500 Maple Ave
What is being renovated at 3500 Maple Ave?
TDLR records describe interior renovations in suites 1150 and 500, including walls, ceilings, finishes, furnishings, millwork and lighting.
When were the 3500 Maple Ave renovations filed?
The suite 1150 project was filed July 12, 2024, under TDLR registration TABS2024022920. The suite 500 project was filed November 28, 2023, under TABS2024006117.
How much is the 3500 Maple Ave suite 1150 project estimated to cost?
The applicant's estimated cost for the 2,926-square-foot suite 1150 project is $330,000.
Is a new building going up at 3500 Maple Ave?
The records describe renovations inside existing suites, not a new building. They state there is no change to use, occupancy or parking.
What's being renovated near the City of Dallas at 3500 Maple Ave?
TDLR records show interior renovations in suites 1150 and 500 at 3500 Maple Ave, about 112 meters from the City of Dallas location listed nearby.
What's being renovated near Texas Scottish Rite Hospital?
The 3500 Maple Ave registrations describe interior work in two suites. The address is listed about 285 meters from Texas Scottish Rite Hospital.
Also being built nearby
All of 75201- 3500 Maple Ave · Tr 3500 Maple CorpNov 9, 20262,500 sq ft renovation of existing office multi-purpose space which will include new flooring, wall base and paint throughout, new lighting in renovated areas, new power/data, and new millwork
- 3500 Maple Avenue · Tr 3500 Maple CorpSep 25, 2026Gallian expansion — renovation/alteration — tenant improvements
- 3500 Mape Ave · Lincoln Property CompanyFeb 27, 2025Producers midstream - dallas office expansion — renovation/alteration — expansion of existing office space into the adjacent suite consisting of 2,179 usf. scope includes removing a demising wall for access, reworking 4 existing offices into 7, re-using glass fronts, blend and extend of finishes
- 3505 Maple Ave 1500 Marilla · City Of DallasJun 20, 2024Reverchon ballpark renovation — renovation/alteration — renovate grandstands, renovate baseball field, replace team dugouts, and replace support building · 112 m away
- 3505 Maple AveSep 8, 2026Starline for 5k race katy5k, built out of staging truss. build september 9th 10aminspect september 10th any timeloads out on september 10th 10pm · 112 m away
- 2502 Turtle Creek BlvdJun 10, 2025New 100a 120/240v 1ph service for verizon wireless small cell node · 187 m away
- 3516 Routh StAug 14, 2026Lennox 5 ton gas horizontal complete ml17 2-stage sl280 furnace/ hvac replacement · 215 m away
- 3600 Routh StJul 27, 2026Install electrical · 225 m away
- 3702 Fairmount StApr 14, 2026Mcr installation of 27 roof mounted pv solar panels · 265 m away
- 2515 Welborn StMay 24, 2025Hvac replacement · 268 m away
- 3714 Fairmount StNov 23, 2020Upgrade existing electrical service · 274 m away
- 2222 Welborn St · Texas Scottish Rite HospitalOct 26, 2026Interior renovation associated with the replacement of the existing ct imaging equipment. work includes selective demolition and modifications to the existing ct room and adjacent areas; installation of new architectural finishes, including floor finishes; modifications to existing lead-lined doors, window/frame and glazing as required; adjustments to the existing fire suppression system to accommodate the new ceiling layout; hvac controls modifications and connection to the existing building automation system; electrical and low-voltage modifications required for the ct equipment and associated systems; and modifications to existing building systems as indicated by the construction documents · 285 m away