3600 Routh St
Dallas, TX 75219
Duplex construction permitted at 3600 Routh St
City of Dallas records show a new-construction permit for a duplex at 3600 Routh St, also referenced with 2607 Hood St, filed December 16, 2025. Plumbing and electrical permits followed in July 2026.
Summarized from City of Dallas records · updated Jul 27, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Jul 27, 2026
- since Dec 16, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Dallas
Questions about 3600 Routh St
What is being built at 3600 Routh St in Dallas?
City of Dallas records describe new construction of a duplex at 3600 Routh St, also referenced with 2607 Hood St. The new-construction permit was filed December 16, 2025.
When was the duplex at 3600 Routh St permitted?
The new-construction permit, RES-NEW-25-000088, was filed December 16, 2025. Plumbing and electrical permits were filed in July 2026.
What do the permits at 3600 Routh St cover?
The records include a new-construction duplex permit, a new plumbing permit filed July 9, 2026, and residential electrical permits filed July 23 and July 27, 2026.
Is a duplex being built near Clover Tower in Dallas?
City records list a new-construction duplex at 3600 Routh St, about 139 meters from Clover Tower at 2701 Hood Street. The duplex permit was filed December 16, 2025.
What is the address listed for the new duplex near 2607 Hood St?
The permit description identifies the project as a duplex at 3600 Routh St/2607 Hood St. It was filed as new residential construction on December 16, 2025.
How much will the duplex at 3600 Routh St cost?
The available City of Dallas records do not report a project valuation or cost estimate for the duplex.
Also being built nearby
All of 75219- 3605 Brown StOct 28, 2026Replacing 2 ton hvac unit · 87 m away
- 2626 Welborn StJun 3, 202650 gallon electric water heater · 119 m away
- 2601 Welborn StMay 12, 2026We poured the approach, city sidewalk, and curb gutter already what happen was a small piece of ramp didnt pass inspection so we have to take out the ramp and repour it. the city sidewalk, approach, and curb gutter will stay but not the small piece of ramp we will have to take out and repour it.ramp on sidewalk:(8'x4'x4") · 130 m away
- 2615 Welborn StNov 6, 2020Remove existing roof and install new roof · 130 m away
- 3516 Routh StAug 14, 2026Lennox 5 ton gas horizontal complete ml17 2-stage sl280 furnace/ hvac replacement · 135 m away
- 3707 Routh StJul 9, 2026Replacing the electric water heater in the basement · 136 m away
- 2701 Hood StJun 12, 2026Qteam meeting 7.7.26 (all day)review of new construction 54 dwu mfd tower. 226,172 sq ft total. dp24-231 ww24-622 · 139 m away
- 2701 Hood Street · Clover Tower LPApr 30, 2026Clover tower — new construction — gross building area: 214,677 ft² - 15 above grade levels, 2 below grade levels and roof. 54 total dwelling units · 139 m away
- 2711 Hood StJul 28, 20252.5 ton system - downstair system · 149 m away
- 2704 Welborn StDec 4, 2020Remove existing roof and install new roof · 154 m away
- 2515 Welborn StMay 24, 2025Hvac replacement · 156 m away
- 2721 Hood StJun 23, 2026Partial cast iron replacement up to slab approx 70 feet of new piping · 158 m away
More townhomes in 75219.