3516 Routh St
Dallas, TX 75219
HVAC system replacement permitted at 3516 Routh St
A City of Dallas residential mechanical permit indicates an HVAC system replacement at 3516 Routh St. The permit was filed August 14, 2026, for a Lennox 5-ton gas horizontal system with an ML17 two-stage unit and an SL280 furnace.
Summarized from City of Dallas records · updated Aug 14, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 14, 2026
- since Aug 14, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3516 Routh St
What is happening at 3516 Routh St in Dallas?
A City of Dallas residential mechanical permit indicates an HVAC system replacement at the address. It was filed August 14, 2026.
When was the HVAC replacement at 3516 Routh St permitted?
The permit was filed August 14, 2026.
What kind of HVAC system is listed in the permit?
The permit describes a Lennox 5-ton gas horizontal system, with an ML17 two-stage unit and an SL280 furnace.
What is happening near Clover Tower on Hood Street?
A residential HVAC replacement was permitted at 3516 Routh St, about 179 meters from Clover Tower at 2701 Hood Street. The permit does not describe work at Clover Tower.
What's happening near Producers Midstream at 3500 Maple Ave?
A residential HVAC replacement was permitted at 3516 Routh St, about 215 meters from Producers Midstream - Suite 440 at 3500 Maple Ave.
What is the permit number for work at 3516 Routh St?
The City of Dallas permit number is RES-MEC-26-004425. It was filed August 14, 2026, for a residential mechanical replacement.
Also being built nearby
All of 75219- 3600 Routh StJul 27, 2026Install electrical · 135 m away
- 3605 Brown StOct 28, 2026Replacing 2 ton hvac unit · 154 m away
- 2701 Hood Street · Clover Tower LPApr 30, 2026Clover tower — new construction — gross building area: 214,677 ft² - 15 above grade levels, 2 below grade levels and roof. 54 total dwelling units · 179 m away
- 2701 Hood StJun 12, 2026Qteam meeting 7.7.26 (all day)review of new construction 54 dwu mfd tower. 226,172 sq ft total. dp24-231 ww24-622 · 179 m away
- 2502 Turtle Creek BlvdJun 10, 2025New 100a 120/240v 1ph service for verizon wireless small cell node · 180 m away
- 2711 Hood StJul 28, 20252.5 ton system - downstair system · 186 m away
- 2728 Hood StOct 12, 2026Install the client-provided ev charger and run two 40-amp single-phase circuits from the existing panel to the new dual-port level 2 ev charger · 189 m away
- 2721 Hood StJun 23, 2026Partial cast iron replacement up to slab approx 70 feet of new piping · 192 m away
- 3500 Maple Ave · Tr 3500 Maple CorpNov 9, 20262,500 sq ft renovation of existing office multi-purpose space which will include new flooring, wall base and paint throughout, new lighting in renovated areas, new power/data, and new millwork · 215 m away
- 3500 Maple Ave · Lincoln Property CompanyJul 12, 20243500 maple, ste 1150 - gallian firm (392447206) — renovation/alteration — new non load bearing walls, ceiling, finishes, furnishings, millwork, and lighting; no change of use of area, occupancy, or parking · 215 m away
- 3500 Mape Ave · Lincoln Property CompanyFeb 27, 2025Producers midstream - dallas office expansion — renovation/alteration — expansion of existing office space into the adjacent suite consisting of 2,179 usf. scope includes removing a demising wall for access, reworking 4 existing offices into 7, re-using glass fronts, blend and extend of finishes · 215 m away
- 3500 Maple Avenue · Tr 3500 Maple CorpSep 25, 2026Gallian expansion — renovation/alteration — tenant improvements · 215 m away