3505 Maple Ave
Dallas, TX 75219
Temporary staging truss for Katy5K at 3505 Maple Ave
City of Dallas permits indicate temporary staging truss for the Katy5K 5K race at 3505 Maple Ave. A permit filed August 15, 2025, describes setup on September 4 and removal on September 5 after the event. A later permit filed September 8, 2026, lists construction for September 9 and load-out on September 10 at 10 p.m.
Summarized from City of Dallas records · updated Sep 8, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 8, 2026
- since Aug 15, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsStarline for 5k race katy5k, built out of staging truss. build september 9th 10aminspect september 10th any timeloads out on september 10th 10pm
Starline for 5k race katy5k, built out of staging truss. build september 9th 10aminspect september 10th any timeloads out on september 10th 10pm
City of Dallas permitCommercial Alteration Addition PermitStarline for 5k race katy5k, built out of staging truss. up - 09-04-2025 down 09-05-2025 after event
Starline for 5k race katy5k, built out of staging truss. up - 09-04-2025 down 09-05-2025 after event
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 3505 Maple Ave
What is being set up at 3505 Maple Ave in Dallas?
City of Dallas permit records describe staging truss for the Katy5K 5K race. The records describe temporary event setup, not a permanent building project.
When is the staging truss scheduled to be set up and removed?
The permit filed September 8, 2026, lists construction for September 9 and load-out on September 10 at 10 p.m.
What does the 2025 permit for 3505 Maple Ave cover?
Permit COM-ALT-ADD-25-000957, filed August 15, 2025, describes staging truss for the Katy5K race, with setup on September 4 and removal on September 5 after the event.
What is the 2026 permit number for the Katy5K staging?
The 2026 City of Dallas permit is COM-ALT-ADD-26-002158. It describes staging truss for the Katy5K 5K race.
What’s being set up near Producers Midstream - Suite 440 on Maple Avenue?
A City of Dallas permit for 3505 Maple Ave describes temporary staging truss for the Katy5K race. Producers Midstream - Suite 440 is listed nearby at 3500 Maple Ave.
Also being built nearby
All of 75219- 3505 Maple Ave 1500 Marilla · City Of DallasJun 20, 2024Reverchon ballpark renovation — renovation/alteration — renovate grandstands, renovate baseball field, replace team dugouts, and replace support building
- 3500 Maple Ave · Lincoln Property CompanyJul 12, 20243500 maple, ste 1150 - gallian firm (392447206) — renovation/alteration — new non load bearing walls, ceiling, finishes, furnishings, millwork, and lighting; no change of use of area, occupancy, or parking · 112 m away
- 3500 Mape Ave · Lincoln Property CompanyFeb 27, 2025Producers midstream - dallas office expansion — renovation/alteration — expansion of existing office space into the adjacent suite consisting of 2,179 usf. scope includes removing a demising wall for access, reworking 4 existing offices into 7, re-using glass fronts, blend and extend of finishes · 112 m away
- 3500 Maple Avenue · Tr 3500 Maple CorpSep 25, 2026Gallian expansion — renovation/alteration — tenant improvements · 112 m away
- 3500 Maple Ave · Tr 3500 Maple CorpNov 9, 20262,500 sq ft renovation of existing office multi-purpose space which will include new flooring, wall base and paint throughout, new lighting in renovated areas, new power/data, and new millwork · 112 m away
- 3702 Fairmount StApr 14, 2026Mcr installation of 27 roof mounted pv solar panels · 173 m away
- 2515 Welborn StMay 24, 2025Hvac replacement · 180 m away
- 3714 Fairmount StNov 23, 2020Upgrade existing electrical service · 181 m away
- 3600 Routh StJul 27, 2026Install electrical · 206 m away
- 2222 Welborn StNov 17, 2026Qteam inhouse - interior renovation associated with the replacement of the existing ct imaging equipment. work includes selective demolition and modifications to the existing ct room and adjacent areas; installation of new architectural finishes, including floor finishes; modifications to existing lead-lined doors, window/frame and glazing as required; adjustments to the existing fire suppression system to accommodate the new ceiling layout; hvac controls modifications and connection to the existing building automation system; electrical and low-voltage modifications required for the ct equipment and associated systems; and modifications to existing building systems as indicated by the construction documents · 213 m away
- 2222 Wellborn St · Texas Scottish Rite HospitalApr 14, 2026Ct equipment replacement — renovation/alteration — the replacement of ct equipment - 1,000sf · 213 m away
- 3800 Maple AveOct 28, 2026Install breakroom sink · 231 m away