1408 Main St
Dallas, TX 75202
Restaurant occupancy filing covers 1408 and 1410 Main Street
A City of Dallas filing seeks a certificate of occupancy for restaurant use at 1408 Main Street and permits for an existing opening between 1408 and 1410 Main. The filing was submitted May 13, 2026, and describes plans to treat the two addresses as one. It does not identify a restaurant operator or provide an opening date.
Summarized from City of Dallas records · updated May 13, 2026
- Projects
- 2
- 2 filings
- Latest filing
- May 13, 2026
- since May 13, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsBc certificate of occupancy was applied for both 1408 and 1410 main street separately. co for 1408 was issued but 1410 was denied because an opening was made between the two addresses prior to current tenant signing of the lease for same use as a restaurant. discussions and agreement has been made with rachil hanna, gentish gentish, nancy arredondo, vernon young, and linda velez, to cancel the 1408 co and reapply for 1408 main street and apply for permits for the opening between the two location to make it one address. this work was already done by a previous tennant and never filed with the city. please ensure the occupancy load is calculated and shown on the co
Bc certificate of occupancy was applied for both 1408 and 1410 main street separately. co for 1408 was issued but 1410 was denied because an opening was made between the two addresses prior to current tenant signing of the lease for same use as a restaurant. discussions and agreement has been made with rachil hanna, gentish gentish, nancy arredondo, vernon young, and linda velez, to cancel the 1408 co and reapply for 1408 main street and apply for permits for the opening between the two location to make it one address. this work was already done by a previous tennant and never filed with the city. please ensure the occupancy load is calculated and shown on the co
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 1408 Main St
What is being built at 1408 Main Street?
A May 13, 2026, City of Dallas permit filing concerns restaurant occupancy at 1408 Main and permits for an existing opening connecting it with 1410 Main. The record describes seeking approval to treat the locations as one address.
Is a restaurant opening at 1408 Main Street?
The filing refers to restaurant use and a certificate of occupancy, but it does not identify an operator or give an opening date.
What work is planned at 1408 and 1410 Main Street?
The filing says an opening between the two addresses was made previously without being filed with the city. It describes plans to apply for permits for that opening and reapply for occupancy approval.
What permit was filed for 1408 Main Street?
The City of Dallas record is permit COM-ALT-ADD-26-001160, filed May 13, 2026. It concerns restaurant occupancy and permits for the opening between 1408 and 1410 Main.
What's going in near Elite Expansion on Main Street?
At 1408 Main, a City of Dallas filing concerns restaurant occupancy and an existing connection to 1410 Main. Elite Expansion is listed nearby at 1412 Main Street.
Also being built nearby
All of 75202- 1410 Main StNov 5, 2025Install new 60' gas line for kitchen equipment · 1 m away
- 1412 Main StJun 23, 2026Electrical remodel · 1 m away
- 1412 Main Street · 1412 Main Street LLCApr 20, 2026Elite expansion — renovation/alteration — interior renovation of existing office space in high rise building · 1 m away
- 1404 Main StMar 3, 2026Roof renovation nothing will change everything will stay in the same shape · 1 m away
- 1415 Main StSep 22, 2026Relocate gas meter to new atmos location · 25 m away
- 1409 Main StMar 3, 2026Gas test · 28 m away
- 1407 Main StFeb 2, 2026Relocate gas meter to the exterior · 28 m away
- 1302 Main StOct 28, 2025Mcr cut front counter, install new walk-in freezer, paint · 29 m away
- 1500 Main StMay 14, 2026This permit is for a temporary stage platform and a set of 3 bleachers for a special event at pegasus plaza. the stage platform is twelve 4x4 platforms with 24" legs. structure will set on the main street side of the park, adjacent to the street. this platform will be used for a parade announcer. stage to be constructed on site by kelly rentals (dallas, tx) on saturday, june 6 for an all-day event on saturday, june 6. structure will be removed on sunday, june 7 after the event's conclusion. see attached photo for basic structure details · 37 m away
- 1509 Main StMar 31, 20263/4" backflow assembly replacement – 17th floor · 46 m away
- 1511 Main StAug 14, 2026Install new commercial plumbing for botanica beverage lounge, including hot and cold water distribution, sanitary waste and vent piping, three-compartment sink, two hand sinks, mop/service sink, dump sink, floor sink, restroom and service-area floor drains, and plumbing connections for ice equipment, espresso machine, pitcher rinser, bar equipment, and commercial water heater. work includes required underground/rough plumbing, final fixture connections, testing and inspections associated with existing permit com-alt-add-26-001406 · 48 m away
- 1519 Main Street · Tkg 1519 Main Partners, LPMar 27, 20241519 main street — renovation/alteration — interior renovation · 55 m away
More restaurants in 75202.