1412 Main Street
Dallas, TX 75202 · Elite Expansion, Fairhill School Renovation
Office renovation planned at Adolphus Tower
A 2,899-square-foot interior renovation of existing office space is registered at 1412 Main Street in Adolphus Tower. The TDLR project registration was filed April 20, 2026, and lists an applicant-estimated project cost of $125,000.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 20, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 20, 2026
- since Apr 20, 2026
- Largest scope
- 2,899 sf
- Estimated cost
- $5.1M
- state registration
Where this project stands
Finishing up · inspection nextElite Expansion
2,899 sq ft · $125K est.
- RegisteredApr 20, 2026
- Plan review
- ConstructionJun '26 – Nov '26
- Inspectednow
- Closed
Scheduled to finish Nov 15, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsInterior renovation of existing office space in high rise building — adolphus tower
TDLR project registrationRenovation/AlterationReview Complete2,899 sq ft$125K est.- Project #
- TABS2026018125
- Tenant / owner
- Elite Expansion
- Design firm
- Pro
- Contact
- Pro
Interior refresh of existing building finishes, reconfiguration of administration area to create a secured vestibule and associated site work around entry. new roof and waterproofing improvements of the existing facility — fairhill school
TDLR project registrationRenovation/AlterationProject Closed59,650 sq ft$5.1M est.- Project #
- TABS2023013777
- Tenant / owner
- Fairhill School Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1412 Main Street
What is being built at 1412 Main Street in Dallas?
A 2,899-square-foot interior renovation of existing office space is registered for the address in Adolphus Tower. The filing does not describe new construction.
When was the office renovation at 1412 Main Street filed?
The TDLR project registration was filed April 20, 2026. Its project number is TABS2026018125.
How much will the 1412 Main Street office renovation cost?
The TDLR registration lists an applicant-estimated project cost of $125,000.
How large is the office renovation at Adolphus Tower?
The registered renovation covers 2,899 square feet of existing office space.
Has the 1412 Main Street project been approved?
The TDLR record lists the project status as Review Complete.
Also being built nearby
All of 75202- 1412 Main StJun 23, 2026Electrical remodel
- 1410 Main StNov 5, 2025Install new 60' gas line for kitchen equipment · 1 m away
- 1408 Main StMay 13, 2026Bc certificate of occupancy was applied for both 1408 and 1410 main street separately. co for 1408 was issued but 1410 was denied because an opening was made between the two addresses prior to current tenant signing of the lease for same use as a restaurant. discussions and agreement has been made with rachil hanna, gentish gentish, nancy arredondo, vernon young, and linda velez, to cancel the 1408 co and reapply for 1408 main street and apply for permits for the opening between the two location to make it one address. this work was already done by a previous tennant and never filed with the city. please ensure the occupancy load is calculated and shown on the co · 1 m away
- 1404 Main StMar 3, 2026Roof renovation nothing will change everything will stay in the same shape · 2 m away
- 1415 Main StSep 22, 2026Relocate gas meter to new atmos location · 26 m away
- 1409 Main StMar 3, 2026Gas test · 28 m away
- 1407 Main StFeb 2, 2026Relocate gas meter to the exterior · 29 m away
- 1302 Main StOct 28, 2025Mcr cut front counter, install new walk-in freezer, paint · 30 m away
- 1500 Main StMay 14, 2026This permit is for a temporary stage platform and a set of 3 bleachers for a special event at pegasus plaza. the stage platform is twelve 4x4 platforms with 24" legs. structure will set on the main street side of the park, adjacent to the street. this platform will be used for a parade announcer. stage to be constructed on site by kelly rentals (dallas, tx) on saturday, june 6 for an all-day event on saturday, june 6. structure will be removed on sunday, june 7 after the event's conclusion. see attached photo for basic structure details · 36 m away
- 1509 Main StMar 31, 20263/4" backflow assembly replacement – 17th floor · 45 m away
- 1511 Main StAug 14, 2026Install new commercial plumbing for botanica beverage lounge, including hot and cold water distribution, sanitary waste and vent piping, three-compartment sink, two hand sinks, mop/service sink, dump sink, floor sink, restroom and service-area floor drains, and plumbing connections for ice equipment, espresso machine, pitcher rinser, bar equipment, and commercial water heater. work includes required underground/rough plumbing, final fixture connections, testing and inspections associated with existing permit com-alt-add-26-001406 · 47 m away
- 1519 Main Street · Tkg 1519 Main Partners, LPMar 27, 20241519 main street — renovation/alteration — interior renovation · 54 m away
More offices in 75202.