106 E 5th St
Dallas, TX 75203
106 E 5th St: 1 project on record
City of Dallas lists 1 filing across 1 project at 106 E 5th St, Dallas, TX 75203. The most recent, filed November 18, 2025, covers: “Gas test”.
Compiled from City of Dallas records · updated Nov 18, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 18, 2025
- since Nov 18, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 106 E 5th St
What is being built at 106 E 5th St?
The latest filing (City of Dallas permit RES-PLM-25-007694, November 18, 2025) covers gas test.
How many permits and filings does 106 E 5th St have?
1 filing across 1 project, from November 18, 2025 to November 18, 2025.
Is there other construction near 106 E 5th St?
Yes. Nearby filings include 1018 N Beckley Ave (200 amp service wire all house, Aug 25, 2026); 1022 N Beckley Ave (nsfaa-12x24x14 ft 6 shed detached. no electric or plumbing on our steel foundation, Nov 6, 2025); 1030 N Zang Blvd (sewer relay, Jan 6, 2021).
How do I get alerts for new permits at 106 E 5th St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75203- 1018 N Beckley AveAug 25, 2026200 amp service wire all house · 39 m away
- 1022 N Beckley AveNov 6, 2025Nsfaa-12x24x14 ft 6 shed detached. no electric or plumbing on our steel foundation · 44 m away
- 1030 N Zang BlvdJan 6, 2021Sewer relay · 88 m away
- 105 E 6th StAug 28, 2026Foundation repair consisting of the installation of twenty-five (25) hydraulically pressed concrete piers along the exterior perimeter of the existing residence. the structure will be carefully raised and re-leveled as necessary to achieve the closest practical tolerance without causing damage to the existing structure. existing piers beneath the residence will be re-shimmed with steel shims as needed. upon completion, all existing structural wood components will be inspected to verify they are in good working condition. all work will be performed in accordance with the attached engineer's report, structural drawings, and repair details · 100 m away
- 1011 N Zang BlvdJan 17, 2021Convert basement into dwelling unit · 120 m away
- 218 E 5th StJul 25, 2025Connect meter to the oncor service · 125 m away
- 975 N Zang BlvdAug 14, 2026Bu me pl el zo he finish-out of a 310 sq ft catering kitchen (within an existing building) without a commercial hood · 140 m away
- 820 N Zang BlvdOct 14, 2020Service release no work · 144 m away
- 820 N Zang BlvdMay 13, 2026Clean and show · 144 m away
- 1100 N Zang BlvdDec 23, 2020Tc-2020-23605 11/9/2020 to 5/7/2021 830am to 530pm daily · 159 m away
- 216 E 6th StSep 25, 2020Porch & existing carport · 167 m away
- 218 E 6th StSep 25, 2020Porch & existing carport · 169 m away