1011 N Zang Blvd
Dallas, TX 75208
1011 N Zang Blvd: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 1011 N Zang Blvd, Dallas, TX 75208. The most recent, filed January 17, 2021, covers: “Convert basement into dwelling unit”.
Compiled from City of Dallas records · updated Jan 17, 2021
- Projects
- 2
- 2 filings
- Latest filing
- Jan 17, 2021
- since Jan 17, 2021
- Largest scope
- —
- Listed value
- $25
- partial · often understated
Permit & project history
2 projectsSources: City of Dallas
Questions about 1011 N Zang Blvd
What is being built at 1011 N Zang Blvd?
The latest filing (City of Dallas permit 2010121123, January 17, 2021) covers convert basement into dwelling unit.
How many permits and filings does 1011 N Zang Blvd have?
2 filings across 2 projects, from January 17, 2021 to January 17, 2021.
How much is the construction at 1011 N Zang Blvd worth?
Permits at this address list about $25 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 1011 N Zang Blvd?
Yes. Nearby filings include 1030 N Zang Blvd (sewer relay, Jan 6, 2021); 975 N Zang Blvd (bu me pl el zo he finish-out of a 310 sq ft catering kitchen (within an existing building) without a commercial hood, Aug 14, 2026); 820 N Zang Blvd (clean and show, May 13, 2026).
How do I get alerts for new permits at 1011 N Zang Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 1030 N Zang BlvdJan 6, 2021Sewer relay · 47 m away
- 975 N Zang BlvdAug 14, 2026Bu me pl el zo he finish-out of a 310 sq ft catering kitchen (within an existing building) without a commercial hood · 56 m away
- 820 N Zang BlvdMay 13, 2026Clean and show · 108 m away
- 820 N Zang BlvdOct 14, 2020Service release no work · 108 m away
- 1018 N Beckley AveAug 25, 2026200 amp service wire all house · 114 m away
- 1022 N Beckley AveNov 6, 2025Nsfaa-12x24x14 ft 6 shed detached. no electric or plumbing on our steel foundation · 115 m away
- 1008 Elsbeth AveAug 18, 2025Repipe all gas lines in home and new gas line from meter to home · 117 m away
- 1006 Elsbeth AveSep 11, 2025Whole home rewire. includes all new wiring and devices, hardwired smoke detectors and sub panel with basic surge“ · 117 m away
- 106 E 5th StNov 18, 2025Gas test · 120 m away
- 126 Neches StFeb 18, 2026Water heater replacement (gas) · 154 m away
- 105 E 6th StAug 28, 2026Foundation repair consisting of the installation of twenty-five (25) hydraulically pressed concrete piers along the exterior perimeter of the existing residence. the structure will be carefully raised and re-leveled as necessary to achieve the closest practical tolerance without causing damage to the existing structure. existing piers beneath the residence will be re-shimmed with steel shims as needed. upon completion, all existing structural wood components will be inspected to verify they are in good working condition. all work will be performed in accordance with the attached engineer's report, structural drawings, and repair details · 164 m away
- 1114 Elsbeth AveNov 11, 2026Relocate gas meter · 169 m away