1008 Elsbeth Ave
Dallas, TX 75208
1008 Elsbeth Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 1008 Elsbeth Ave, Dallas, TX 75208. The most recent, filed August 18, 2025, covers: “Repipe all gas lines in home and new gas line from meter to home”.
Compiled from City of Dallas records · updated Aug 18, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 18, 2025
- since Aug 18, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 1008 Elsbeth Ave
What is being built at 1008 Elsbeth Ave?
The latest filing (City of Dallas permit RES-PLM-25-003815, August 18, 2025) covers repipe all gas lines in home and new gas line from meter to home.
How many permits and filings does 1008 Elsbeth Ave have?
1 filing across 1 project, from August 18, 2025 to August 18, 2025.
Is there other construction near 1008 Elsbeth Ave?
Yes. Nearby filings include 1006 Elsbeth Ave (whole home rewire. includes all new wiring and devices, hardwired smoke detectors and sub panel with basic surge“, Sep 11, 2025); 901 Elsbeth Ave (detached carport, Jan 27, 2021); 975 N Zang Blvd (bu me pl el zo he finish-out of a 310 sq ft catering kitchen (within an existing building) without a commercial hood, Aug 14, 2026).
How do I get alerts for new permits at 1008 Elsbeth Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 1006 Elsbeth AveSep 11, 2025Whole home rewire. includes all new wiring and devices, hardwired smoke detectors and sub panel with basic surge“ · 3 m away
- 901 Elsbeth AveJan 27, 2021Detached carport · 109 m away
- 975 N Zang BlvdAug 14, 2026Bu me pl el zo he finish-out of a 310 sq ft catering kitchen (within an existing building) without a commercial hood · 110 m away
- 1010 N Madison AveOct 30, 2020Gas test · 116 m away
- 1006 N Madison AveMay 15, 2025Gas test · 116 m away
- 1011 N Zang BlvdJan 17, 2021Convert basement into dwelling unit · 117 m away
- 1029 N Madison AveAug 17, 2026Apartment addition · 132 m away
- 126 Neches StFeb 18, 2026Water heater replacement (gas) · 146 m away
- 908 N Madison AveOct 19, 2026Foundation repair-install 13 pilings, 3 support pads, 23' of sill, and 14' of beam · 154 m away
- 820 N Zang BlvdOct 14, 2020Service release no work · 159 m away
- 820 N Zang BlvdMay 13, 2026Clean and show · 159 m away
- 1030 N Zang BlvdJan 6, 2021Sewer relay · 160 m away