2214 Boll St
Dallas, TX 75204
2214 Boll St permits show a remodel and fourth-floor addition
Dallas permits indicate a main-house remodel, a fourth-floor addition and a rooftop cover at 2214 Boll St. The first permit was filed May 4, 2026; a residential alteration permit filed August 25 describes a bedroom and media room in the addition.
Summarized from City of Dallas records · updated Sep 1, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Sep 1, 2026
- since May 4, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsAdd new plumbing for 5 toilets. 6 lavatories, 3 showers, 1 bath tub, 2 washer boxes and 2 sinks
Add new plumbing for 5 toilets. 6 lavatories, 3 showers, 1 bath tub, 2 washer boxes and 2 sinks
City of Dallas permitResidential Plumbing PermitNsfaa scope of work for remodeling an entire house and adding a new 4th?floor level that includes one bedroom, and a media room
Nsfaa scope of work for remodeling an entire house and adding a new 4th?floor level that includes one bedroom, and a media room
City of Dallas permitResidential Alteration Addition Permit
Sources: City of Dallas
Questions about 2214 Boll St
What is being built at 2214 Boll St in Dallas?
City permits indicate a main-house remodel, a fourth-floor addition and a rooftop cover. The August 25, 2026 residential alteration permit describes a bedroom and media room in the addition.
When were permits filed for 2214 Boll St?
The earliest listed filing is a commercial alteration and addition permit dated May 4, 2026. Additional residential permits were filed from August 25 through September 1, 2026.
What does the permit for 2214 Boll St include?
The August 25 residential alteration permit, RES-ALT-ADD-26-001373, describes remodeling the entire house and adding a fourth-floor level with a bedroom and media room.
Are there new plumbing permits for 2214 Boll St?
Yes. A residential plumbing permit filed August 30, 2026, lists plumbing for five toilets, six lavatories, three showers, a bathtub, two washer boxes and two sinks.
What other work is permitted at 2214 Boll St?
The listed permits also cover wiring for a remodel or addition and installation of new HVAC. They were filed August 31 and September 1, 2026, respectively.
Also being built nearby
All of 75204- 2210 Boll StMay 15, 2026Hvac changeout/alteration: replace and install three new 2-ton mini-split hvac systems, like-for-like, no structural change · 4 m away
- 2202 Boll StNov 6, 2025Install plumbing for new residence · 11 m away
- 2205 Boll StSep 22, 2026Scope of work covers, tear off the current roofing system down to clean decking (shingles only). replace it with a new, like roofing system. the contractor shall provide all necessary labor, materials, equipment, and supervision to complete the work in accordance with industry standards, manufacturer specifications, and applicable building codes · 16 m away
- 2201 Boll StNov 6, 2025Asphalt shingles roof replacement · 18 m away
- 2222 Worthington StJul 30, 2025Located outside · 61 m away
- 2226 Worthington StFeb 5, 2026Tankless swap out on 5th floor of townhome · 63 m away
- 2625 Colby StJun 1, 2026Nsfaa replaced second level balcony attached to back of townhome, within the property's back yard. the original balcony was there when i purchased the property in 2005. the replacement balcony deck has 6 support posts and approx. 16x10 trex/composite decking material to replace/repair existing structure · 69 m away
- 2619 Colby StDec 1, 2025Gas pressure test · 91 m away
- 2804 Thomas AveOct 8, 2025Installation of a 3-ton base heat pump upflow system for a flip property. thermostat to remain in box · 96 m away
- 2812 Thomas AveJul 2, 2026Zo bc existing 3rd floor terrace has been fixed to prevent water intrusion. however, water still puddles and potentially is running back into structure or following the path of least resistance to make it's way inside, causing extensive damage.we are proposing 2-- sq ft patio cover and some guttering to stop the water intrusion once and for all.it is a metal structure, approved by the hoa and it attaches to the existing exposed metal beam of the building.we did have the engineer sign-off as both this is on the 3rd floor and made of metal, as advised by the city of dallas staff · 102 m away
- 2305 Worthington StAug 31, 2026Replace 50 gall gas water heater · 103 m away
- 2816 Thomas AveApr 21, 2026Hvac change out – remove & replace 1 full system + no new duct work + attic installation · 104 m away