2804 Thomas Ave
Dallas, TX 75204
3-ton heat pump installation permitted at 2804 Thomas Ave
A residential mechanical permit indicates installation of a 3-ton base heat pump upflow system at 2804 Thomas Ave. The City of Dallas permit was filed on October 8, 2025 (RES-MEC-25-003024).
Summarized from City of Dallas records · updated Oct 8, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 8, 2025
- since Oct 8, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectInstallation of a 3-ton base heat pump upflow system for a flip property. thermostat to remain in box
Installation of a 3-ton base heat pump upflow system for a flip property. thermostat to remain in box
City of Dallas permitResidential Mechanical Permit
Sources: City of Dallas
Questions about 2804 Thomas Ave
What is being built at 2804 Thomas Ave in Dallas?
A City of Dallas residential mechanical permit indicates installation of a 3-ton base heat pump upflow system. The permit was filed October 8, 2025.
When was the heat pump permit filed for 2804 Thomas Ave?
The permit was filed on October 8, 2025. Its number is RES-MEC-25-003024.
What kind of HVAC system is being installed at 2804 Thomas Ave?
The permit describes a 3-ton base heat pump upflow system.
Is 2804 Thomas Ave a new residential building?
The record is for a residential mechanical permit to install a heat pump system; it does not describe construction of a new building.
Does the 2804 Thomas Ave permit include a thermostat?
The permit description says the thermostat is to remain in the box.
Also being built nearby
All of 75204- 2812 Thomas AveJul 2, 2026Zo bc existing 3rd floor terrace has been fixed to prevent water intrusion. however, water still puddles and potentially is running back into structure or following the path of least resistance to make it's way inside, causing extensive damage.we are proposing 2-- sq ft patio cover and some guttering to stop the water intrusion once and for all.it is a metal structure, approved by the hoa and it attaches to the existing exposed metal beam of the building.we did have the engineer sign-off as both this is on the 3rd floor and made of metal, as advised by the city of dallas staff · 9 m away
- 2803 Thomas AveOct 23, 2020Replace or modify existing hvac · 13 m away
- 2816 Thomas AveApr 21, 2026Hvac change out – remove & replace 1 full system + no new duct work + attic installation · 13 m away
- 2801 Thomas AveDec 9, 2025Water heater replacement 50 gal · 14 m away
- 2305 Worthington StAug 31, 2026Replace 50 gall gas water heater · 24 m away
- 2323 Worthington StJul 25, 2025Removing and replacing composition asphalt roofing shingles · 38 m away
- 2226 Worthington StFeb 5, 2026Tankless swap out on 5th floor of townhome · 41 m away
- 2222 Worthington StJul 30, 2025Located outside · 44 m away
- 2331 Worthington StJan 15, 2026Gas test · 45 m away
- 2853 Thomas AveAug 11, 2026Hvac replacement/ 3 ton carrier comfort basic complete system · 55 m away
- 2324 Centurion CtJul 1, 2026Hvac replacement 3 ton upflow heat pump.lennox model el16kp1 condenserlennox model cbk47uhet air handler · 79 m away
- 2214 Boll StSep 1, 2026Install new hvac · 96 m away