2626 Howell St
Dallas, TX 75204 · Uptown Center, Ltd
Office suite renovations and facade work at 2626 Howell St
Permits indicate office tenant improvements at 2626 Howell St, including new spec suites 900 and 980 and a finish-out for suite 950 on the ninth floor. The suite work was permitted in May and June 2026; a July 29, 2026 permit covers black aluminum bands on first-floor facades facing Howell, Worthington and Howland streets.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Jul 29, 2026
- Projects
- 46
- 46 filings
- Latest filing
- Jul 29, 2026
- since Apr 9, 2024
- Largest scope
- 1,229 sf
- Estimated cost
- $185K
- state registration
Permit & project history
46 projectsZo bc minor facade renovation. adding some black aluminum bands to the first floor facades facing howell, worthington, and howland
Zo bc minor facade renovation. adding some black aluminum bands to the first floor facades facing howell, worthington, and howland
City of Dallas permitCommercial Alteration Addition PermitNon structural tenant improvement project in suites #900, #950, and #980. electrical remodel to include new lights, receptacles, switches, and additional necessary electrical remodel work
Non structural tenant improvement project in suites #900, #950, and #980. electrical remodel to include new lights, receptacles, switches, and additional necessary electrical remodel work
City of Dallas permitCommercial Electrical PermitMcr non-structural tenant improvement project. we are adding a wall to create spec suites 900 and 980 and finishing out the space next to the shared conference room on the 9th floor to create 950. non-load bearing walls only/co & finish out permits required prior to occupancy
Mcr non-structural tenant improvement project. we are adding a wall to create spec suites 900 and 980 and finishing out the space next to the shared conference room on the 9th floor to create 950. non-load bearing walls only/co & finish out permits required prior to occupancy
City of Dallas permitCommercial Plumbing PermitMcr non structural tenant improvement project. we are adding a wall to create spec suites 900 and 980 and finishing out the space next to the shared conference room on the 9th floor to create suite 950.non-load bearing walls only/co & finish out permits required prior to occupancy
Mcr non structural tenant improvement project. we are adding a wall to create spec suites 900 and 980 and finishing out the space next to the shared conference room on the 9th floor to create suite 950.non-load bearing walls only/co & finish out permits required prior to occupancy
City of Dallas permitCommercial Alteration Addition Permit1. make safe grds2. install filter media.3. demolition as shown.4. install new ductwork as shown.5. insulation for new ductwork.6. relocate 2 fpbs7. 24 return grilles.8. 18 supply grilles.9. 5 supply slots
1. make safe grds2. install filter media.3. demolition as shown.4. install new ductwork as shown.5. insulation for new ductwork.6. relocate 2 fpbs7. 24 return grilles.8. 18 supply grilles.9. 5 supply slots
City of Dallas permitCommercial Mechanical PermitElectrical modifications. lighting, power distribution, hvac systems and life safety improvements
Electrical modifications. lighting, power distribution, hvac systems and life safety improvements
City of Dallas permitCommercial Electrical PermitQteam qr interior commercial tenant finish-out of an existing shell space for a fitness studio (body machine fitness) located at 2626 howell st, suite 110, dallas, tx 75204. scope include interior construction consisting of new non-load-bearing partitions, interior ramps, ada-compliant men’s and women’s restrooms, offices, storage, fitness and recovery areas. work includes interior finishes, flooring, ceilings, doors, and millwork. scope also includes associated mechanical, electrical, plumbing, fire alarm, and fire sprinkler coordination and modifications, lighting and power distribution, hvac systems, and life-safety improvements in accordance with the approved construction documents. no change to building footprint, height, or exterior walls
Qteam qr interior commercial tenant finish-out of an existing shell space for a fitness studio (body machine fitness) located at 2626 howell st, suite 110, dallas, tx 75204. scope include interior construction consisting of new non-load-bearing partitions, interior ramps, ada-compliant men’s and women’s restrooms, offices, storage, fitness and recovery areas. work includes interior finishes, flooring, ceilings, doors, and millwork. scope also includes associated mechanical, electrical, plumbing, fire alarm, and fire sprinkler coordination and modifications, lighting and power distribution, hvac systems, and life-safety improvements in accordance with the approved construction documents. no change to building footprint, height, or exterior walls
City of Dallas permitCommercial Alteration Addition PermitMcr landlord improvement- interior alteration of suite 920 on the 9th floor of existing office highrise building. interior remodel only, future tenant will file for their own co
Mcr landlord improvement- interior alteration of suite 920 on the 9th floor of existing office highrise building. interior remodel only, future tenant will file for their own co
City of Dallas permitCommercial Alteration Addition PermitFire pump room1. disconnect existing fire pump.2. furnish and install 1-ground wire from oncor transformer tonew fire pump controller.3. hook-up new fire pump controller
Fire pump room1. disconnect existing fire pump.2. furnish and install 1-ground wire from oncor transformer tonew fire pump controller.3. hook-up new fire pump controller
City of Dallas permitCommercial Electrical PermitCertificate of occupancy required prior to occupancymcr interior commercial tenant finish-out of an existing shell space for a fitness studio (body machine fitness) located at 2626 howell st, suite 110, dallas, tx 75204. scope include interior construction consisting of new non-load-bearing partitions, interior ramps, ada-compliant men’s and women’s restrooms, offices, storage, fitness and recovery areas. work includes interior finishes, flooring, ceilings, doors, and millwork. scope also includes associated mechanical, electrical, plumbing, fire alarm, and fire sprinkler coordination and modifications, lighting and power distribution, hvac systems, and life-safety improvements in accordance with the approved construction documents. no change to building footprint, height, or exterior walls
Certificate of occupancy required prior to occupancymcr interior commercial tenant finish-out of an existing shell space for a fitness studio (body machine fitness) located at 2626 howell st, suite 110, dallas, tx 75204. scope include interior construction consisting of new non-load-bearing partitions, interior ramps, ada-compliant men’s and women’s restrooms, offices, storage, fitness and recovery areas. work includes interior finishes, flooring, ceilings, doors, and millwork. scope also includes associated mechanical, electrical, plumbing, fire alarm, and fire sprinkler coordination and modifications, lighting and power distribution, hvac systems, and life-safety improvements in accordance with the approved construction documents. no change to building footprint, height, or exterior walls
City of Dallas permitCommercial Alteration Addition PermitMcr tenant build up from a shell structure to a gym to be operated by bode machine fitness (bmf)
Mcr tenant build up from a shell structure to a gym to be operated by bode machine fitness (bmf)
City of Dallas permitCommercial Alteration Addition Permit1. tear off existing roof down to the flat structural concrete deck. 2. prime the concrete deck using elastocol 500 primer. 3. install an elastophene sp 2.2 base sheet (temporary roof). 4. install (1) one layer of 2" sopra-iso adhered using duotack 365 adhesive. 5. install 1/8" per foot full tapered sopra-iso adhered using duotack 365 adhesive. 6. install 1/4" per foot tapered sopra-iso crickets adhered using duotack 365 adhesive. 7. install (1) one layer of 1/2" dexcell glass mat coverboard adhered using duotack 365 adhesive. 8. install (1) one layer of elastophene flam 2.2 base sheet, torch applied. 9. install (1) one layer of elastophene flam ls fr gr wh cap sheet, torch applied. 10. liquid flashing figured at all rooftop curbs and penetrations
1. tear off existing roof down to the flat structural concrete deck. 2. prime the concrete deck using elastocol 500 primer. 3. install an elastophene sp 2.2 base sheet (temporary roof). 4. install (1) one layer of 2" sopra-iso adhered using duotack 365 adhesive. 5. install 1/8" per foot full tapered sopra-iso adhered using duotack 365 adhesive. 6. install 1/4" per foot tapered sopra-iso crickets adhered using duotack 365 adhesive. 7. install (1) one layer of 1/2" dexcell glass mat coverboard adhered using duotack 365 adhesive. 8. install (1) one layer of elastophene flam 2.2 base sheet, torch applied. 9. install (1) one layer of elastophene flam ls fr gr wh cap sheet, torch applied. 10. liquid flashing figured at all rooftop curbs and penetrations
City of Dallas permitCommercial Roofing PermitNon-structural tenant improvement of common area restrooms, corridor and shared conference room for the 9th floor common areas
Non-structural tenant improvement of common area restrooms, corridor and shared conference room for the 9th floor common areas
City of Dallas permitCommercial Alteration Addition PermitInterior tenant finish for facial spa with (5) treatment rooms, supply room and lobby. — uptown center
TDLR project registrationRenovation/AlterationProject Closed1,229 sq ft$185K est.- Project #
- TABS2024015759
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
+ 6 older projects. See the full history with a free trial.
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 2626 Howell St
What is being built at 2626 Howell St in Dallas?
City of Dallas permits indicate non-structural office renovations, including spec suites 900 and 980 and a finish-out for suite 950 on the ninth floor. A separate permit covers black aluminum bands on three first-floor facades.
When were the office renovations at 2626 Howell St permitted?
Permits for the ninth-floor suite work were filed May 29 and June 1, 2026. The records include alteration, plumbing, electrical and mechanical permits.
What work is planned for suites 900, 950 and 980 at 2626 Howell St?
The permits describe adding walls for spec suites 900 and 980 and finishing out space beside the shared conference room as suite 950. The work is described as non-structural.
Is the facade changing at 2626 Howell St?
A City of Dallas permit filed July 29, 2026, describes adding black aluminum bands to first-floor facades facing Howell, Worthington and Howland streets.
What permits have been filed for 2626 Howell St?
The City of Dallas records list 37 filings, with dates from June 13, 2025, through July 29, 2026. Recent permits cover office tenant improvements, mechanical and electrical work, plumbing and facade changes.
Also being built nearby
All of 75204- 2626 Howell Street · Uptown Center Jv, LPMar 16, 2026Spec suite 800 — renovation/alteration — interior renovation of existing office space in high rise building
- 2626 Howell Street · Uptown Center Jv, LPMar 16, 2026Spec suite 950 — renovation/alteration — interior renovation of existing office space in high rise building
- 2699 Howell St · Srpf B/Quadrangle Property LLCOct 23, 2026Mcr remodel of 10th flr · 34 m away
- 2681 Howell StAug 15, 20254 split systems, hood, exhaust fan, make up air, duct and grills · 52 m away
- 2828 Routh Street 7th · Srpf B/Quadrangle Property, LLCAug 20, 20267th floor spec suites — renovation/alteration — capital improvement · 74 m away
- 2828 Routh Street · Srpf B/Quadrangle Property LLCDec 15, 2025Dave perry miller relocation — renovation/alteration — tenant improvement · 74 m away
- 2828 Routh StNov 10, 20267th floor plumbing remodel · 74 m away
- 2803 Routh StOct 7, 2026Removal of paving · 74 m away
- 2811 Routh StOct 5, 2026Removal of paving · 76 m away
- 2813 Routh StOct 5, 2026Removal of paving · 77 m away
- 2821 Routh StOct 5, 2026Demolition of building, fondation, associated paving, trees as shown on demolition plan · 80 m away
- 2718 Boll StJul 30, 2026Sidewalk and driveway concrete repair.sidewalkconcrete specs:3500 psi, 4" depth, #3 rebar, 18" ocew.entryconcrete specs:3500 psi, 6" depth, #3 rebar, 18" ocew · 83 m away
More demolitions in 75204, gyms & fitness in 75204, warehouses & industrial in 75204.