2718 Boll St
Dallas, TX 75204
Sidewalk and driveway concrete repairs permitted on Boll Street
A City of Dallas permit indicates sidewalk and driveway concrete repairs at 2718 Boll St. The permit was filed July 30, 2026, under permit number COM-DSW-26-000043.
Summarized from City of Dallas records · updated Jul 30, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 30, 2026
- since Jul 30, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSidewalk and driveway concrete repair.sidewalkconcrete specs:3500 psi, 4" depth, #3 rebar, 18" ocew.entryconcrete specs:3500 psi, 6" depth, #3 rebar, 18" ocew
Sidewalk and driveway concrete repair.sidewalkconcrete specs:3500 psi, 4" depth, #3 rebar, 18" ocew.entryconcrete specs:3500 psi, 6" depth, #3 rebar, 18" ocew
City of Dallas permitCommercial Drive Approach and Sidewalk Permit
Sources: City of Dallas
Questions about 2718 Boll St
What is being built at 2718 Boll St in Dallas?
A City of Dallas permit covers sidewalk and driveway concrete repairs, not a new building. It specifies 3,500-psi concrete with rebar.
When was the work at 2718 Boll St permitted?
The permit was filed July 30, 2026. Its number is COM-DSW-26-000043.
What does permit COM-DSW-26-000043 cover?
It covers sidewalk and driveway concrete repair at 2718 Boll St. The permit specifies a 4-inch sidewalk and a 6-inch driveway entry.
Is a new building planned at 2718 Boll St?
The record provided is for sidewalk and driveway concrete repairs. It does not describe a new building.
What construction is happening near Willkie Farr and Gallagher at 2699 Howell St?
A City of Dallas permit filed July 30, 2026, covers sidewalk and driveway concrete repairs at 2718 Boll St, about 52 meters away.
What work is planned near Truluck's Uptown Dallas?
The permit record at 2718 Boll St describes sidewalk and driveway concrete repairs. The address is about 110 meters from Truluck's Uptown Dallas at 2619 McKinney Ave.
Also being built nearby
All of 75204- 2699 Howell St · Srpf B/Quadrangle Property LLCOct 23, 2026Mcr remodel of 10th flr · 52 m away
- 2626 Howell Street · Uptown Center Jv, LPMar 16, 2026Spec suite 800 — renovation/alteration — interior renovation of existing office space in high rise building · 83 m away
- 2626 Howell Street · Uptown Center Jv, LPMar 16, 2026Spec suite 950 — renovation/alteration — interior renovation of existing office space in high rise building · 83 m away
- 2626 Howell St · Uptown Center, LtdJul 29, 2026Zo bc minor facade renovation. adding some black aluminum bands to the first floor facades facing howell, worthington, and howland · 83 m away
- 2719 Routh StJul 2, 2025Rear concrete parking area will remain. demolish two story structure and foundation. remove adjacent private sidewalk and flatwork. basement (appx: 35; x 16' x 8'): break up/remove concrete and backfill and compact · 86 m away
- 2707 Routh StOct 8, 2025Remove and replace city sidewalk · 87 m away
- 2705 Mckinney AveJun 2, 2025Remove & replace hvac pkg unit like for like · 95 m away
- 2705 Mckinney AveJan 4, 2021Interior remodel only · 95 m away
- 2719 Mckinney AveMay 4, 2026Q-team inhouse - addition: proposed wooden patio with cover 494 square feet · 96 m away
- 2633 Mckinney AveApr 7, 2026Replace rooftop hvac units like for like · 100 m away
- 2611 Worthington StJan 28, 2021Remove existing roof and install new roof · 108 m away
- 2714 Mckinney AveMay 12, 2026Zo bc we are adding a premade outdoor pergola to serve refreshments. product dimensions are listed here, height 7' x width 6' 8-3/4" x length 8' 5-1/2''. this product has a roof with open sides for ventilation · 108 m away