2707 Routh St
Dallas, TX 75201
Sidewalk replacement permitted at 2707 Routh St
A City of Dallas permit indicates that the sidewalk at 2707 Routh St will be removed and replaced. The permit, COM-DSW-25-000042, was filed on October 8, 2025.
Summarized from City of Dallas records · updated Oct 8, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 8, 2025
- since Nov 16, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsInstallation of a dual path cellular and ip communicator to take over monitoring of an existing fire
Installation of a dual path cellular and ip communicator to take over monitoring of an existing fire
City of Dallas permitFire Alarm (FA) Commercial Renovation
Sources: City of Dallas
Questions about 2707 Routh St
What is being built at 2707 Routh St in Dallas?
A City of Dallas permit indicates sidewalk removal and replacement at the address. It does not describe a new building.
When was the sidewalk work at 2707 Routh St permitted?
The permit was filed on October 8, 2025.
What is the permit number for 2707 Routh St?
The City of Dallas permit number is COM-DSW-25-000042. It is a Commercial Drive Approach and Sidewalk Permit.
Is a new building planned at 2707 Routh St?
The available permit describes removing and replacing the city sidewalk, not building construction.
What work is planned near Willkie Farr & Gallagher at 2699 Howell St?
A City of Dallas permit at 2707 Routh St indicates that the city sidewalk will be removed and replaced. The permit was filed October 8, 2025.
What is happening near Truluck's in Uptown Dallas?
At 2707 Routh St, a City of Dallas permit indicates sidewalk removal and replacement. The permit was filed October 8, 2025.
Also being built nearby
All of 75201- 2719 Routh StJul 2, 2025Rear concrete parking area will remain. demolish two story structure and foundation. remove adjacent private sidewalk and flatwork. basement (appx: 35; x 16' x 8'): break up/remove concrete and backfill and compact · 13 m away
- 2718 Boll StJul 30, 2026Sidewalk and driveway concrete repair.sidewalkconcrete specs:3500 psi, 4" depth, #3 rebar, 18" ocew.entryconcrete specs:3500 psi, 6" depth, #3 rebar, 18" ocew · 87 m away
- 2699 Howell St · Srpf B/Quadrangle Property LLCOct 23, 2026Mcr remodel of 10th flr · 110 m away
- 2803 Routh StOct 7, 2026Removal of paving · 113 m away
- 2626 Howell Street · Uptown Center Jv, LPMar 16, 2026Spec suite 950 — renovation/alteration — interior renovation of existing office space in high rise building · 118 m away
- 2626 Howell Street · Uptown Center Jv, LPMar 16, 2026Spec suite 800 — renovation/alteration — interior renovation of existing office space in high rise building · 118 m away
- 2626 Howell St · Uptown Center, LtdJul 29, 2026Zo bc minor facade renovation. adding some black aluminum bands to the first floor facades facing howell, worthington, and howland · 118 m away
- 2811 Routh StOct 5, 2026Removal of paving · 122 m away
- 2813 Routh StOct 5, 2026Removal of paving · 124 m away
- 2821 Routh StOct 5, 2026Demolition of building, fondation, associated paving, trees as shown on demolition plan · 133 m away
- 2619 Mckinney Ave · One Dallas Uptown Venture LLCSep 22, 2026Qteam renovation/alteration of interior. new finishes only · 134 m away
- 2633 Mckinney AveApr 7, 2026Replace rooftop hvac units like for like · 141 m away