2817 Howell St
Dallas, TX 75204
Massage and spa suite getting an interior fit-out
A new massage/spa business is being fitted out in an existing 2,033-square-foot suite at 2817 Howell St. The City of Dallas issued an interior alteration permit on September 16, 2026, followed by mechanical, plumbing and electrical permits filed through October 3. The work described includes new interior partitions and updates to building systems, with no exterior or square-footage changes.
Summarized from City of Dallas records · updated Oct 3, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Oct 3, 2026
- since Sep 16, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsAdd receptacles, switches and light fixtures, run some emt conduit, installing pull boxes, pull wire, adding circuits into the electrical panel for lighting and power
Add receptacles, switches and light fixtures, run some emt conduit, installing pull boxes, pull wire, adding circuits into the electrical panel for lighting and power
City of Dallas permitCommercial Electrical PermitInterior tenant finish-out of an existing 2,033 sq ft suite for a new massage/spa business. scope: selective demolition of existing partitions/ceiling, new interior partitions creating reception, massage rooms, break room and storage, reuse of existing restrooms, and associated new mep (electrical, mechanical, plumbing) improvements. no exterior, structural, or square footage changes
Interior tenant finish-out of an existing 2,033 sq ft suite for a new massage/spa business. scope: selective demolition of existing partitions/ceiling, new interior partitions creating reception, massage rooms, break room and storage, reuse of existing restrooms, and associated new mep (electrical, mechanical, plumbing) improvements. no exterior, structural, or square footage changes
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 2817 Howell St
What is being built at 2817 Howell St in Dallas?
A new massage/spa business is being fitted out in an existing suite. The September 16, 2026, alteration permit describes reception, massage rooms, a break room and storage.
What business is going into 2817 Howell St?
The permit describes a new massage/spa business, but does not name a business or operator.
How big is the new massage and spa suite at 2817 Howell St?
The interior finish-out permit describes an existing 2,033-square-foot suite. It specifies no increase in square footage.
When were permits filed for the work at 2817 Howell St?
The alteration and mechanical permits were filed September 16, 2026; a plumbing permit followed on September 29, and an electrical permit was filed October 3.
What work do the permits describe at 2817 Howell St?
The permits cover interior partitions and related electrical, plumbing and mechanical work. The electrical permit, COM-ELC-26-004942, describes adding receptacles, switches, lighting and circuits.
What's going in near Palm Beach Tan on Allen Street?
Permits for 2817 Howell St describe an interior fit-out for a new massage/spa business. The nearby Palm Beach Tan listing is at 2815 Allen Street.
Also being built nearby
All of 75204- 2900 Mckinney AveJul 8, 2025Replace failing 1/2" rpz at the soda machine · 86 m away
- 2908 Mckinney AveAug 8, 2025Gas test · 89 m away
- 2912 Mckinney AveDec 16, 2025Qteam qr redo front facade · 91 m away
- 2816 Vine StNov 10, 2026Run drain and water lines for a washer from the existing bathroom · 92 m away
- 2717 Howell StSep 28, 2026Unit 4114- remove and replace existing hvac equipment with new like-for-like a2l refrigerant system, installation to include compatible air handler, condenser, refrigerant piping connections, condensate drain, electrical · 98 m away
- 2717 Howell StOct 27, 2020Shingle reroof · 98 m away
- 2704 Worthington StMar 20, 2026Were replacing 35ft of gas line from the meter to the kitchen area · 99 m away
- 2801 Allen StAug 6, 2026Suite 180: grease interceptor replacement - remove existing grease trap and install new schier gb-250 grease interceptor and sampling well · 106 m away
- 2950 Mckinney AveOct 29, 2026Tear off existing roof system down to decking. install synthetic underlayment, ice and water shield and architectural shingles. paint vents to match shingle color, pick up all debris and perform nail sweep · 107 m away
- 2805 Allen StNov 10, 2026Run drain and water lines for a washer from the existingbathroom · 107 m away
- 2815 Allen StSep 15, 2026Unit 426: running a dedicated 20 amp 120 volt circuit from the existing electrical panel to the location of a new washer/dryer combo appliance inside the unit · 110 m away
- 2815 Allen Street · Post Apartment Homes LPNov 20, 2025Maa mckinney ave #190 (palm beach tan) — renovation/alteration — demolition to a white box with ada compliant restroom, elecxtrical room, janitor closet · 110 m away
More demolitions in 75204, warehouses & industrial in 75204, retail spaces in 75204.