2912 Mckinney Ave
Dallas, TX 75204
Facade renovation planned at 2912 McKinney Ave
City of Dallas permits indicate facade renovation work at 2912 McKinney Ave. A commercial permit filed November 10, 2025, describes a facade renovation, and a second permit filed December 16, 2025, describes work on the front facade.
Summarized from City of Dallas records · updated Dec 16, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Dec 16, 2025
- since Nov 10, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 2912 Mckinney Ave
What is being built at 2912 McKinney Ave?
City of Dallas permit descriptions indicate facade renovation work. They do not identify a new tenant or a different project use.
When were permits filed for work at 2912 McKinney Ave?
The City of Dallas records show filings on November 10 and December 16, 2025.
What does permit COM-NEW-25-000240 cover?
Filed November 10, 2025, the permit is described as a facade renovation.
What does permit COM-ALT-ADD-25-001726 cover?
Filed December 16, 2025, the permit description refers to redoing the front facade.
Is there facade work near Palm Beach Tan on McKinney Avenue?
The facade renovation permits are for 2912 McKinney Ave. A nearby landmark record lists Palm Beach Tan at 2815 Allen Street, about 87 meters away.
Also being built nearby
All of 75204- 2908 Mckinney AveAug 8, 2025Gas test · 4 m away
- 2900 Mckinney AveJul 8, 2025Replace failing 1/2" rpz at the soda machine · 10 m away
- 2950 Mckinney AveOct 29, 2026Tear off existing roof system down to decking. install synthetic underlayment, ice and water shield and architectural shingles. paint vents to match shingle color, pick up all debris and perform nail sweep · 30 m away
- 2801 Allen StAug 6, 2026Suite 180: grease interceptor replacement - remove existing grease trap and install new schier gb-250 grease interceptor and sampling well · 77 m away
- 2805 Allen StNov 10, 2026Run drain and water lines for a washer from the existingbathroom · 80 m away
- 2815 Allen StSep 15, 2026Unit 426: running a dedicated 20 amp 120 volt circuit from the existing electrical panel to the location of a new washer/dryer combo appliance inside the unit · 87 m away
- 2815 Allen Street · Post Apartment Homes LPNov 20, 2025Maa mckinney ave #190 (palm beach tan) — renovation/alteration — demolition to a white box with ada compliant restroom, elecxtrical room, janitor closet · 87 m away
- 2817 Howell StOct 3, 2026Add receptacles, switches and light fixtures, run some emt conduit, installing pull boxes, pull wire, adding circuits into the electrical panel for lighting and power · 91 m away
- 3030 Mckinney AveMar 18, 2026Replace existing 2" water meter service cooling tower make up water line in central plant · 119 m away
- 2811 Mckinney Avenue · Pjo 2811 LtdMay 27, 2026Edsa expansion — renovation/alteration — interior renovation of existing office space in high-rise building · 141 m away
- 2811 Mckinney AveSep 17, 2026Pull plumbing permit for gas line. purchase calibrated gauge and install it on site. test gas pipe at 5 psi. remove gauge and advise the customer · 141 m away
- 2610 Allen StJul 3, 20251" rpz on roof in pool equipment room · 142 m away