3030 Mckinney Ave
Dallas, TX 75204
Condo remodels and pool-system work at 3030 McKinney
City of Dallas permits indicate interior condo remodels and plumbing, electrical, and mechanical work at 3030 McKinney Ave, rather than a new building. The first listed permit was filed May 6, 2025; later permits include pool-room and cooling-tower water-system work, most recently on March 18, 2026.
Summarized from City of Dallas records · updated Mar 18, 2026
- Projects
- 14
- 14 filings
- Latest filing
- Mar 18, 2026
- since May 6, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
14 projectsSources: City of Dallas
Questions about 3030 Mckinney Ave
What is being built at 3030 McKinney Ave?
The permits listed for the address describe condo interior remodels and work on existing building systems, not a new building. The first listed permit was filed May 6, 2025.
Is a new apartment building going up at 3030 McKinney?
The available City of Dallas permits do not indicate construction of a new apartment building. They include interior condo remodels and plumbing, electrical, and mechanical work.
What work was permitted at 3030 McKinney in 2025?
Permits filed in 2025 include condo interior remodels, plumbing and electrical remodels, duct reconfiguration, water-heater work, and replacement of a pool-room RPZ. The condo remodel permits were filed May 6 and May 22, 2025.
What is the latest work permitted at 3030 McKinney?
On March 18, 2026, permits COM-PLM-26-001065 and COM-PLM-26-001064 covered work on the cooling-tower makeup water line and replacement of an RPZ for cooling-tower makeup water.
Is the pool at 3030 McKinney being renovated?
A September 29, 2025 plumbing permit, COM-PLM-25-001982, lists replacement of the pool-room RPZ. The permit description does not indicate a broader pool renovation.
What work is happening at 3030 McKinney near Palm Beach Tan?
The address is listed about 62 meters from the Palm Beach Tan location at 2815 Allen Street. Permits for 3030 McKinney describe condo remodels and maintenance to plumbing and building systems.
Also being built nearby
All of 75204- 2815 Allen Street · Post Apartment Homes LPNov 20, 2025Maa mckinney ave #190 (palm beach tan) — renovation/alteration — demolition to a white box with ada compliant restroom, elecxtrical room, janitor closet · 62 m away
- 2815 Allen StSep 15, 2026Unit 426: running a dedicated 20 amp 120 volt circuit from the existing electrical panel to the location of a new washer/dryer combo appliance inside the unit · 62 m away
- 2805 Allen StNov 10, 2026Run drain and water lines for a washer from the existingbathroom · 63 m away
- 2801 Allen StAug 6, 2026Suite 180: grease interceptor replacement - remove existing grease trap and install new schier gb-250 grease interceptor and sampling well · 64 m away
- 2950 Mckinney AveOct 29, 2026Tear off existing roof system down to decking. install synthetic underlayment, ice and water shield and architectural shingles. paint vents to match shingle color, pick up all debris and perform nail sweep · 89 m away
- 3128 Mckinney AveMar 20, 2026Install a grease trap · 108 m away
- 3131 Mckinney Avenue 750 · Trea 3131 Mckinney, LLCSep 22, 2025Spec suite 750 — renovation/alteration — tenant improvement · 116 m away
- 3131 Mckinney Avenue 700 · Trea 3131 Mckinney, LLCSep 22, 2025Spec suite 700 — renovation/alteration — tenant improvement · 116 m away
- 3131 Mckinney Avenue 725 · Trea 3131 Mckinney, LLCSep 22, 2025Spec suite 725 — renovation/alteration — tenant improvement · 116 m away
- 3131 Mckinney Ave · 3131 MckinneyNov 2, 20269 new supply diffusers and ductwork · 116 m away
- 2912 Mckinney AveDec 16, 2025Qteam qr redo front facade · 119 m away
- 2908 Mckinney AveAug 8, 2025Gas test · 123 m away