3131 Mckinney Avenue 750
Dallas, TX 75204 · Trea 3131 Mckinney, LLC
4,004-square-foot Spec Suite 750 renovation at 3131 McKinney
A 4,004-square-foot tenant improvement for Spec Suite 750 is planned at 3131 McKinney Avenue. The Texas Department of Licensing and Regulation registration was filed September 22, 2025, and lists the project as an alteration with inspection complete. The applicant estimates the project cost at $275,000.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 22, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 22, 2025
- since Sep 22, 2025
- Largest scope
- 4,004 sf
- Estimated cost
- $275K
- state registration
Where this project stands
Inspected · closing outSpec Suite 750
4,004 sq ft · $275K est.
- RegisteredSep 22, 2025
- Plan review
- ConstructionOct '25 – Jan '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectTenant improvement — 3131 mckinney
TDLR project registrationRenovation/AlterationInspection Complete4,004 sq ft$275K est.- Project #
- TABS2026001468
- Tenant / owner
- Spec Suite 750
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3131 Mckinney Avenue 750
What is being built at 3131 McKinney Avenue 750?
A tenant improvement for Spec Suite 750 is registered at the address. The project covers 4,004 square feet and is listed as a renovation or alteration.
When was the Spec Suite 750 project filed?
The TDLR project registration was filed September 22, 2025. It is identified as project TABS2026001468.
How much will the 3131 McKinney Avenue renovation cost?
The applicant's estimated cost for the project is $275,000. This is an estimate, not a confirmed final cost.
Is the 3131 McKinney Avenue 750 project complete?
The TDLR registration lists the project status as Inspection Complete. The record describes a tenant improvement for Spec Suite 750.
What is being renovated near Tc/P M-Line Tower?
A 4,004-square-foot tenant improvement for Spec Suite 750 is registered at 3131 McKinney Avenue, about 136 meters from Tc/P M-Line Tower. The filing date is September 22, 2025.
Is a new business opening at 3131 McKinney Avenue?
The record identifies a tenant improvement for Spec Suite 750, but does not name a business or say that one is opening. The project is listed as an alteration with inspection complete.
Also being built nearby
All of 75204- 3131 Mckinney Avenue 725 · Trea 3131 Mckinney, LLCSep 22, 2025Spec suite 725 — renovation/alteration — tenant improvement
- 3131 Mckinney Ave · 3131 MckinneyNov 2, 20269 new supply diffusers and ductwork
- 3131 Mckinney Avenue 700 · Trea 3131 Mckinney, LLCSep 22, 2025Spec suite 700 — renovation/alteration — tenant improvement
- 3128 Mckinney AveMar 20, 2026Install a grease trap · 13 m away
- 3203 Mckinney AveOct 8, 2026Mcr changing finish out in the master bathroom. moving the tub location, the shower location, vanity location and adding wet bar · 108 m away
- 3100 Cole AveApr 22, 2026Hvac change out – remove & replace 1 full system + no new duct work + ceiling/roof installation · 109 m away
- 3006 Cole AveJan 26, 2021Interior and exterior remodel · 111 m away
- 3030 Mckinney AveMar 18, 2026Replace existing 2" water meter service cooling tower make up water line in central plant · 116 m away
- 3015 Cole AveOct 16, 2026Mcr phase 4 (2815 cole ave) consists of interior alterations to four (4) existing occupied dwelling units (3007 cole ave units 104 & 106, 3015 cole ave unit 227, and 3104 sneed st unit 114) for the installation of ventless combination washer/dryer units. work includes conversion of an existing closet adjacent to the bathroom into a laundry area, installation of a new electrical branch circuit from the existing electrical panel, extension of domestic hot and cold water lines from the existing bathroom plumbing, connection of the appliance drain to the existing sanitary drainage system, drywall, and finish repairs. no structural modifications, exterior alterations, changes to the building footprint, occupancy, or use are proposed · 122 m away
- 3213 Mckinney AveOct 14, 2020Permanent electrical service · 123 m away
- 3111 Cole Ave · Uptown Ballun Dor LLCJan 14, 2025Ballun dor — new construction — 35 unit multifamily building with retail kitchen and two levels of parking garage. total building area of approx 69000 sqf · 123 m away
- 3007 Cole AveSep 4, 2026Phase - alteration addition · 123 m away