3229 Hugo Pl
Dallas, TX 75204
Five pilings permitted at 3229 Hugo Pl
A commercial foundation repair permit for installing five pilings at 3229 Hugo Pl was filed on June 18, 2026. The City of Dallas record lists permit COM-FDN-26-000077; it does not specify a project size or valuation.
Summarized from City of Dallas records · updated Jun 18, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 18, 2026
- since Jun 18, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3229 Hugo Pl
What is happening at 3229 Hugo Pl in Dallas?
A City of Dallas permit records commercial foundation repair work to install five pilings. The permit was filed June 18, 2026, under COM-FDN-26-000077.
Is a new building being built at 3229 Hugo Pl?
The available permit describes installing five pilings for commercial foundation repair. It does not identify a new building project.
When was the foundation work at 3229 Hugo Pl permitted?
The permit was filed on June 18, 2026. Its number is COM-FDN-26-000077.
What does permit COM-FDN-26-000077 cover?
The City of Dallas permit covers installing five pilings and is categorized as commercial foundation repair.
What is being permitted near Ionna TX-0003 on N Hall Street?
At 3229 Hugo Pl, about 97 meters from the listed Ionna TX-0003 location, a commercial foundation repair permit covers installing five pilings. The record does not connect that work to the nearby EV charging hub.
Also being built nearby
All of 75204- 3225 Hugo PlJun 18, 2026Installing 5 pilings · 7 m away
- 3233 Hugo PlJun 18, 2026Installing 5 pilings · 7 m away
- 3237 Hugo PlJun 18, 2026Installing 6 pilings · 14 m away
- 3221 Hugo PlJun 18, 2026Installing 6 pilings · 15 m away
- 2411 N Hall StOct 29, 2026Hvac replacement. install 1.5 ton heat pump complete system · 84 m away
- 2500 N Hall St · Ionna LLCSep 17, 2026Ionna tx-0003 2500 n hall st dallas tx — new construction — new ev charging hub, approx. 2,800 sq ft - 7 chargers serving 14 stalls, canopy, c-store, restroom building, signage and electrical equipment · 97 m away
- 2420 Hugo StJul 14, 2025Apartment number #1 parcel number: 00c81460000700001scope of workadding sub panel, surge protection, labeling · 101 m away
- 3205 State StJul 8, 2026Removal of existing hvac system and installation of new hvac system · 122 m away
- 3304 State StNov 2, 20261. install new sanitary drain line with 4” schedule 40 pvc pipe for new restrooms and convenient store from each building to wye connection point and connect to main sanitary sewer connection left by utility contractor located approx. 100 feet away 2. install new 1” zurn pex water line for new restrooms and connect to 2” water meter located approx. 10 feet away.3. connect and run condensate drain line for ac units for restrooms to lavatory p-trap with schedule 80 pvc. 4. provide and install new 4” hub drain with wire mesh cover for condensate drains line discharge in convenient store.5. provide and install the following plumbing fixtures: two kohler k-2084-0 wall mounted lavatory sink with kohler k-13461-cp battery powered faucet. two american standard cadet pro ada floor mounted water closet with pressure assistant tank and open front seat.three 3” sioux chief pvc floor drain with trap guard and stainless-steel strainer one 4” lateral cleanouttwo chonomite instant hot water heater for lavatories · 148 m away
- 3132 State StFeb 24, 2026Full reroof · 163 m away
- 3126 State StFeb 24, 2026Full reroof · 166 m away
- 3124 State StFeb 24, 2026Full reroof · 167 m away