3352 Miro Pl
Dallas, TX 75204
Permit filed to replace water heater with tankless unit
A residential plumbing permit covers replacing a 50-gallon gas water heater with a tankless unit at 3352 Miro Pl. The City of Dallas permit was filed May 21, 2026.
Summarized from City of Dallas records · updated May 21, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 21, 2026
- since May 21, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3352 Miro Pl
What is being permitted at 3352 Miro Pl in Dallas?
A City of Dallas residential plumbing permit covers replacing a 50-gallon gas water heater with a tankless unit. It was filed May 21, 2026.
Is a tankless water heater being installed at 3352 Miro Pl?
The permit describes replacing a 50-gallon gas water heater with a tankless unit. It does not confirm whether the work is complete.
When was the water heater permit filed?
The permit was filed May 21, 2026.
What is the permit number for work at 3352 Miro Pl?
The City of Dallas permit number is RES-PLM-26-005281. It covers a residential water heater replacement.
What work is planned near Bvjv III 4155 on Buena Vista Street?
At 3352 Miro Pl, about 59 meters from Bvjv III 4155, a permit covers replacing a 50-gallon gas water heater with a tankless unit. The permit was filed May 21, 2026.
Also being built nearby
All of 75204- 3344 Miro PlSep 18, 2025Replace 2 ton downstairs completecondenser on roof · 12 m away
- 3328 Miro PlJul 29, 2025Foundation repair-install 10 pilings · 41 m away
- 4144 Buena Vista StOct 7, 2026Abatement and demolition of structure on sight. from jobsite, take right on fitzhugh and go east. take right on 75 and continue south and merge onto 45. continues south until you arrive at landfill, republic landfill ecd 5703 n 45 ennis, texas 75119 · 46 m away
- 3324 Miro PlJul 29, 2025Foundation repair-install 5 pilings · 46 m away
- 4152 Buena Vista StOct 7, 2026Abatement and demolition of structure on site and associated parking and paving · 47 m away
- 3320 Miro PlJul 29, 2025Foundation repair-install 5 pilings · 52 m away
- 4132 Buena Vista StSep 18, 2020Install water heater · 52 m away
- 4155 Buena Vista Street · Bvjv III 4155 LLCJul 1, 2026Clark's dallas — renovation/alteration — 3,300 sq ft renovation of an existing office building turning into restaurant space · 59 m away
- 4155 Buena Vista StSep 21, 2026Qualifications 1. install 2" l press hard copper water service, 4" sanitary sewer & gt-2000 grease trap with sample well installed per plans 2. install pex water supply overhead per plans with split-seam insulation and air hammer arrestors per city code 3. install pex hot & cold supply overhead to all fixtures per plan with ceiling hangers at 5' per code 4. provide and install (9) 3" floor sinks, (5) 3" floor drains, & (1) 4"x7' trench drain with trap seals in fixtures per city code 5. install gas service from meter to gas appliances per plan, final appliance connection to gas stop provided by installer 6. gc will provide all rooftop vent and gas penetrations as needed, gc to install rooftop flashings and seal penetrations 7. install tankless water heaters on wall with dual horizontal vent piping through wall, gc to patch wall as needed 8. install pvc drain & pex water connections at all sinks & toilets per plan, commercial equipment & sink install by provider 9. core cement deck as needed for drain and water penetrations. gc to provide metal pan cutting below cores as needed 10. bid includes single roof drain and overflow drain with separate discharge down from roof to terminate 6" above grade 11. bid includes 3/4" hose bib and 2" pvc capped drain stub out at aquarium location, final connections provided by others 12. bid inlcudes 1 total watts hy-725 3/4" exterior frostproof hydrant with locking box, gc to provide frame for mounting 13. install 2" rpz with air gap & strainer on water main in riser closet. fire system water main above & below grade not inlcuded 14. install 1 1/2" pvc pump discharge line from elevator closet to water heater floor sink, pump & connection by others 15. install fire suppression anzel valve on gas supply, valve provided by others. safety button system installed by others 16. install aav on island sink locations per city code. loop vent systems are not included at island fixture locations 17. bid includes fixture trim per schedule below with pex crimp water stops and tubular drain connections per code 18. any additional plumbing not included in bid and requested by gc is billed as t&m on separate change order · 59 m away
- 4143 Buena Vista StAug 24, 2025Gas test · 60 m away
- 4134 Travis StNov 28, 2025We are replacing 100 amp main electrical panel in unit due to corrosion found on main lugs · 62 m away
- 4139 Buena Vista StJun 15, 2026Replace hvac systems, and ductwork · 62 m away