4021 Travis St
Dallas, TX 75204
Townhome HVAC and sidewalk work at 4021 Travis St
City of Dallas permits indicate HVAC replacement at the residence and demolition and replacement of the concrete sidewalk in front of a townhome. The HVAC permit was filed Jan. 16, 2026 (RES-MEC-26-000251), and the sidewalk permit was filed Sept. 11, 2026 (RES-DSW-26-000444).
Summarized from City of Dallas records · updated Sep 11, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 11, 2026
- since Jan 16, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 4021 Travis St
What work is happening at 4021 Travis St in Dallas?
City of Dallas records show an HVAC replacement and demolition and replacement of the concrete sidewalk in front of a townhome.
When were permits filed for 4021 Travis St?
The HVAC permit, RES-MEC-26-000251, was filed Jan. 16, 2026. The sidewalk permit, RES-DSW-26-000444, was filed Sept. 11, 2026.
Is a new townhome being built at 4021 Travis St?
The records provided describe HVAC and sidewalk work at a townhome; they do not indicate construction of a new townhome.
What sidewalk work was permitted at 4021 Travis St?
Permit RES-DSW-26-000444 describes demolishing and replacing the existing concrete sidewalk in front of a townhome according to city standards. It was filed Sept. 11, 2026.
What HVAC work was permitted at 4021 Travis St?
A residential mechanical permit describes HVAC replacement. It was filed Jan. 16, 2026, as RES-MEC-26-000251.
Also being built nearby
All of 75204- 4023 Travis StSep 11, 2026Demolition & replace existing concrete sidewalk in front of townhome per city standards · 5 m away
- 4025 Travis StSep 17, 2026Demolition & replace existing concrete sidewalk in front of townhome per city standards · 10 m away
- 4017 Travis StNov 11, 2026Remove and replace section of city sidewalk · 10 m away
- 4022 Travis StAug 5, 2026Replacement of existing water heater with a new unit · 14 m away
- 4018 Travis StJul 7, 2026Replace 3.5 ton complete · 14 m away
- 4027 Travis StSep 11, 2026Demolition & replace existing concrete sidewalk in front of townhome per city standards · 15 m away
- 4016 Travis StOct 12, 2026Installing 2 dedicated 60 amp circuits for a new air handler · 16 m away
- 4026 Travis StMay 21, 2025Private residential ev charger tied into existing msp on a dedicated 60a-2p breaker. #6 cu conductors, #8 cu ground, and 3/4" emt or equivalent raceway · 20 m away
- 4033 Travis StMay 19, 2025Repair sewer line in the yard · 30 m away
- 4041 Travis StOct 7, 2020Plumbing (pl) single family alteration · 50 m away
- 4043 Travis StJun 12, 2026Installing two 4 tons one downstairs and one upstairs · 55 m away
- 4045 Travis StOct 21, 2026Replace 3 ton gas hvac unit · 60 m away