4033 Travis St
Dallas, TX 75204
4033 Travis St: 1 project on record
City of Dallas lists 1 filing across 1 project at 4033 Travis St, Dallas, TX 75204. The most recent, filed May 19, 2025, covers: “Repair sewer line in the yard”.
Compiled from City of Dallas records · updated May 19, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 19, 2025
- since May 19, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 4033 Travis St
What is being built at 4033 Travis St?
The latest filing (City of Dallas permit RES-PLM-25-000493, May 19, 2025) covers repair sewer line in the yard.
How many permits and filings does 4033 Travis St have?
1 filing across 1 project, from May 19, 2025 to May 19, 2025.
Is there other construction near 4033 Travis St?
Yes. Nearby filings include 4027 Travis St (demolition & replace existing concrete sidewalk in front of townhome per city standards, Sep 11, 2026); 4026 Travis St (private residential ev charger tied into existing msp on a dedicated 60a-2p breaker. #6 cu conductors, #8 cu ground, and 3/4" emt or equivalent raceway, May 21, 2025); 4041 Travis St (plumbing (pl) single family alteration, Oct 7, 2020).
How do I get alerts for new permits at 4033 Travis St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75204- 4027 Travis StSep 11, 2026Demolition & replace existing concrete sidewalk in front of townhome per city standards · 15 m away
- 4026 Travis StMay 21, 2025Private residential ev charger tied into existing msp on a dedicated 60a-2p breaker. #6 cu conductors, #8 cu ground, and 3/4" emt or equivalent raceway · 20 m away
- 4041 Travis StOct 7, 2020Plumbing (pl) single family alteration · 20 m away
- 4025 Travis StSep 17, 2026Demolition & replace existing concrete sidewalk in front of townhome per city standards · 20 m away
- 4043 Travis StJun 12, 2026Installing two 4 tons one downstairs and one upstairs · 25 m away
- 4023 Travis StSep 11, 2026Demolition & replace existing concrete sidewalk in front of townhome per city standards · 25 m away
- 4022 Travis StAug 5, 2026Replacement of existing water heater with a new unit · 28 m away
- 4045 Travis StOct 21, 2026Replace 3 ton gas hvac unit · 30 m away
- 4021 Travis StSep 11, 2026Demolition & replace existing concrete sidewalk in front of townhome per city standards · 30 m away
- 4018 Travis StJul 7, 2026Replace 3.5 ton complete · 37 m away
- 4017 Travis StNov 11, 2026Remove and replace section of city sidewalk · 40 m away
- 4016 Travis StOct 12, 2026Installing 2 dedicated 60 amp circuits for a new air handler · 42 m away