3030 Hester Ave
Dallas, TX 75205
Five rooftop units to be replaced at 3030 Hester Ave
A commercial mechanical permit indicates that five York rooftop units at 3030 Hester Ave will be replaced with Rheem units on a like-for-like basis. The City of Dallas permit was filed June 2, 2025 (COM-MEC-25-000087).
Summarized from City of Dallas records · updated Jun 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 2, 2025
- since Jun 2, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectRoof top unit replacementreplace 5 york roof top units with rheem. like-for-like with same factory optionswill be applying with traffic control / civil works for separate street closure permits
Roof top unit replacementreplace 5 york roof top units with rheem. like-for-like with same factory optionswill be applying with traffic control / civil works for separate street closure permits
City of Dallas permitCommercial Mechanical Permit
Sources: City of Dallas
Questions about 3030 Hester Ave
What is happening at 3030 Hester Ave in Dallas?
A City of Dallas permit indicates that five rooftop units will be replaced with Rheem units. The like-for-like replacement permit was filed June 2, 2025.
What is being built near Steak 48 Dallas at 4829 McKinney Avenue?
At 3030 Hester Ave, about 188 meters from Steak 48 Dallas, a permit covers replacement of five rooftop units. It does not describe construction of a new building.
What's happening near Alphagraphics on Knox Street?
A commercial mechanical permit at 3030 Hester Ave, about 245 meters from Alphagraphics, covers replacing five York rooftop units with Rheem units. The permit was filed June 2, 2025.
Is a new building planned at 3030 Hester Ave?
The available record is for replacement of five rooftop units, not construction of a new building. It is City of Dallas permit COM-MEC-25-000087, filed June 2, 2025.
What does permit COM-MEC-25-000087 cover?
The permit covers a like-for-like replacement of five York rooftop units with Rheem units at 3030 Hester Ave. It was filed with the City of Dallas on June 2, 2025.
Also being built nearby
All of 75205- 4700 Mckinney AveNov 20, 2020Barricade · 57 m away
- 4717 Mckinney AveAug 21, 202650 gal gas wh3rd floor attic · 74 m away
- 4693 Mckinney AveNov 18, 2020Permanent electrical service · 74 m away
- 4719 Mckinney AveAug 20, 2026Minor gas repair · 75 m away
- 4777 N Central ExpyOct 28, 2026Install backflow (double check) · 114 m away
- 4805 Mckinney AveJun 10, 2026Meters in the alley for unit 413 - outside only · 159 m away
- 4633 Insurance LnOct 16, 2020Tc-2020-21504 10/6/2020 thru 10/15/2020 9am to 330 pm daily per plan · 162 m away
- 5106 Vanderbilt AveSep 3, 2025Hvac replacement 2 systems · 170 m away
- 5115 Vanderbilt AveJul 13, 2026150 linear feet of wood board on board fence, 8' tall · 184 m away
- 4830 Mckinney AveMay 7, 2026Non lit fabric awning · 186 m away
- 4829 Mckinney Avenue · Dallas 3111 LPOct 6, 2026Steak 48 dallas — new construction — new construction / tenant finish-out; full-service restaurant at 16,297 s.f · 188 m away
- 4829 Mckinney AveOct 22, 2026Complete demolition of an existing one-story commercial restaurant building located at the southwest corner of monticello avenue and mckinney avenue, dallas, tx, including removal of the building structure, foundation, and slab-on-grade to finished grade. work includes disconnection and capping of interior utilities in coordination with franchise utility companies, removal of associated site improvements per the accompanying civil demolition plan, and site restoration/rough grading following building removal · 188 m away