4693 Mckinney Ave
Dallas, TX 75205
4693 Mckinney Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 4693 Mckinney Ave, Dallas, TX 75205. The most recent, filed November 18, 2020, covers: “Permanent electrical service”.
Compiled from City of Dallas records · updated Nov 18, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Nov 18, 2020
- since Nov 18, 2020
- Largest scope
- —
- Listed value
- $25
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 4693 Mckinney Ave
What is being built at 4693 Mckinney Ave?
The latest filing (City of Dallas permit 2011173048, November 18, 2020) covers permanent electrical service.
How many permits and filings does 4693 Mckinney Ave have?
1 filing across 1 project, from November 18, 2020 to November 18, 2020.
How much is the construction at 4693 Mckinney Ave worth?
Permits at this address list about $25 in valuations. Permit valuations are often partial and understate total project cost.
What is being built near Mckinney Knox Joint C/O Cencor Realty Serv in Dallas?
4693 Mckinney Ave is about 163 m from Mckinney Knox Joint C/O Cencor Realty Serv (4620 Mckinney Ave). Its latest filing is for permanent electrical service.
Is there other construction near 4693 Mckinney Ave?
Yes. Nearby filings include 4700 Mckinney Ave (barricade, Nov 20, 2020); 4717 Mckinney Ave (50 gal gas wh3rd floor attic, Aug 21, 2026); 4719 Mckinney Ave (minor gas repair, Aug 20, 2026).
How do I get alerts for new permits at 4693 Mckinney Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75205- 4700 Mckinney AveNov 20, 2020Barricade · 29 m away
- 4717 Mckinney AveAug 21, 202650 gal gas wh3rd floor attic · 48 m away
- 4719 Mckinney AveAug 20, 2026Minor gas repair · 50 m away
- 3030 Hester AveJun 2, 2025Roof top unit replacementreplace 5 york roof top units with rheem. like-for-like with same factory optionswill be applying with traffic control / civil works for separate street closure permits · 74 m away
- 4620 Mckinney Ave · Mckinney Knox Joint C/O Cencor Realty Serv INCMar 16, 2026Assembly of the new outdoor cooler vault and installation of the remote refrigeration equipment for the new cooler · 163 m away
- 4805 Mckinney AveJun 10, 2026Meters in the alley for unit 413 - outside only · 166 m away
- 4633 Insurance LnOct 16, 2020Tc-2020-21504 10/6/2020 thru 10/15/2020 9am to 330 pm daily per plan · 167 m away
- 4777 N Central ExpyOct 28, 2026Install backflow (double check) · 174 m away
- 4829 Mckinney Avenue · Dallas 3111 LPOct 6, 2026Steak 48 dallas — new construction — new construction / tenant finish-out; full-service restaurant at 16,297 s.f · 198 m away
- 4829 Mckinney AveOct 22, 2026Complete demolition of an existing one-story commercial restaurant building located at the southwest corner of monticello avenue and mckinney avenue, dallas, tx, including removal of the building structure, foundation, and slab-on-grade to finished grade. work includes disconnection and capping of interior utilities in coordination with franchise utility companies, removal of associated site improvements per the accompanying civil demolition plan, and site restoration/rough grading following building removal · 198 m away
- 4830 Mckinney AveMay 7, 2026Non lit fabric awning · 201 m away
- 4625 Cole AveSep 29, 2025Apt 2floor plan 1 – 1st floor- remove baseboards- relocate door existing garage entry door – repair existing door framing, open wall for new door - remove existing ffe – return to ho- remove all outlet covers, wall plates, install new white uno- staircase- existing treads to stay, prep walls and stair treads for new finish , led tape light to be installed at each step, stair treads to be enclosed – approximately 120 lf- foyer o electrical - pendant/ chandelier 1 ea (not on material list) , recessed downlight 2 ea, line of cove light around perimeter 40 lfo paint – ceilings pt-02 (walls pt-01 not listed on plans)- powder roomo frame new walls and install door,install drywall – 26 lfo run electrical for new lighting – line of led cove lighting around ceiling – 26 lf, vanity light (nothing speced), install exhaust fan o plumbing – run plumbing for new toilet and sink, install toilet, install fauceto install mirroro vanity – no vanity on material spec sheet- install flooring in foyer and bathroom - 88 sq ft kitchen/ bathroom - remove baseboards throughout room- prep floor for new finish – approx. 1000 sq ft, install new tile ft- 01- remove all existing ffe, return to ho- remove wall plate covers, replace with white uno- remove kitchen countertops and cabinet box millwork – 2 ea- remove existing sink and faucet – 1 ea- remove cabinet millwork – 1 ea- remove existing kitchen sink and faucet- bathroom- demolition walls – 14 lf- remove existing bathroom vanity and sink- remove existing toilet - exposed wood beams to stay, protect - remove gyp ceiling, patch and repair – 28x6- install new recessed lighting – 18 ea- install led line of cove light – 46 lf- exposed beams to be wrapped on all sides – 1,008 lf- install new appliances - relocate plumbing and gas connections balcony- install composite decking – 22x6bedroom- remove all baseboard throughout room, bathroom, closet- flooring- remove all ffe - remove all existing wall plate covers- remove existing closet- drywall, door, framing – 25 lf- d5 – demolition partial wall, repair as needed – 4 lf- bathroom- remove existing toilet – 2 ea- remove existing vanity and sink – 2 ea- remove all millwork/ cabinets - demolition framing/ drywall in bathrooms and closet – 55 lf- install new recessed lighting in bedroom – alt – 01, 13 ea- wet room – wet rated recess lights – 4 ea, line of cove light – 42 lf- run plumbing and electrical for new toilet where stair case opening is, framing work required · 207 m away