3130 Knox St
Dallas, TX 75205
Backflow device replacement permitted at 3130 Knox St
A commercial plumbing permit at 3130 Knox St covers direct replacement of a 1/2-inch backflow device for a tea machine. The City of Dallas permit was filed June 18, 2026; the record does not describe a new building or tenant.
Summarized from City of Dallas records · updated Jun 18, 2026
- Projects
- 9
- 9 filings
- Latest filing
- Jun 18, 2026
- since Jun 18, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
9 projectsSources: City of Dallas
Questions about 3130 Knox St
What is happening at 3130 Knox St in Dallas?
A City of Dallas commercial plumbing permit covers direct replacement of a 1/2-inch backflow device for a tea machine. The permit number is COM-PLM-26-002282.
When was the plumbing permit for 3130 Knox St filed?
The permit was filed June 18, 2026.
Is a new building being built at 3130 Knox St?
The available permit record describes a backflow device replacement, not new building construction.
What is happening at 3130 Knox St near Tesla at 3113 Knox Street?
At 3130 Knox St, the permit is for replacing a backflow device for a tea machine. The nearby Tesla permit is for a separate address, 3113 Knox Street.
What work is permitted near Me+em Knox Street Reno?
At 3130 Knox St, the City of Dallas permit covers direct replacement of a 1/2-inch backflow device for a tea machine. The filing date was June 18, 2026.
Also being built nearby
All of 75205- 3133 Knox StSep 11, 2026Install 12 total pilings, voidfill · 13 m away
- 3120 Knox StOct 23, 2025Sewer repair · 13 m away
- 3113 Knox Street · Tabesh Family TrustJun 8, 2026Tesla - trt#480952 - d2600084 — renovation/alteration — 2,513 sq ft tenant improvement for "tesla, inc." auto sales including site improvements · 27 m away
- 3113 Knox StAug 27, 2026Electrical alterations associated with remodel of existing retail space, including modifications to branch circuitry, lighting, devices, and associated electrical systems · 27 m away
- 3101 Knox StAug 2, 2026Existing roof system has one layer of roofing. we are overlaying existing roof system with 60 mil white tpo. installing one layer of insulation mechanically attached with screws and plates for 20year manufacturer's warranty · 42 m away
- 4600 Mckinney AveDec 2, 2025Gas test · 53 m away
- 4620 Mckinney Ave · Mckinney Knox Joint C/O Cencor Realty Serv INCMar 16, 2026Assembly of the new outdoor cooler vault and installation of the remote refrigeration equipment for the new cooler · 69 m away
- 3201 Knox StFeb 6, 2026Nextech proposes to: * installing 3 heat pump package units with emergency electric heat (customer supplied) to replace units below * permit * coordinate with city of dallas for road closure permit * sub contract traffic control company to set up barricades and detour signs during lift. * tie down details * with crane service lift new units to roof * set and secure curb adaptors for units that require them * install and secure new unit per code * reconnect new unit to existing electrical and drain lines * install factory supplied hail guards and economizer * connect system to ems equipment * reconnect to existing duct work * mount and install supplied co2 sensor, remote temperature, and remote zone sensor * start unit and verify all operations * clean job site * complete final permit inspection · 104 m away
- 4625 Cole AveSep 29, 2025Apt 2floor plan 1 – 1st floor- remove baseboards- relocate door existing garage entry door – repair existing door framing, open wall for new door - remove existing ffe – return to ho- remove all outlet covers, wall plates, install new white uno- staircase- existing treads to stay, prep walls and stair treads for new finish , led tape light to be installed at each step, stair treads to be enclosed – approximately 120 lf- foyer o electrical - pendant/ chandelier 1 ea (not on material list) , recessed downlight 2 ea, line of cove light around perimeter 40 lfo paint – ceilings pt-02 (walls pt-01 not listed on plans)- powder roomo frame new walls and install door,install drywall – 26 lfo run electrical for new lighting – line of led cove lighting around ceiling – 26 lf, vanity light (nothing speced), install exhaust fan o plumbing – run plumbing for new toilet and sink, install toilet, install fauceto install mirroro vanity – no vanity on material spec sheet- install flooring in foyer and bathroom - 88 sq ft kitchen/ bathroom - remove baseboards throughout room- prep floor for new finish – approx. 1000 sq ft, install new tile ft- 01- remove all existing ffe, return to ho- remove wall plate covers, replace with white uno- remove kitchen countertops and cabinet box millwork – 2 ea- remove existing sink and faucet – 1 ea- remove cabinet millwork – 1 ea- remove existing kitchen sink and faucet- bathroom- demolition walls – 14 lf- remove existing bathroom vanity and sink- remove existing toilet - exposed wood beams to stay, protect - remove gyp ceiling, patch and repair – 28x6- install new recessed lighting – 18 ea- install led line of cove light – 46 lf- exposed beams to be wrapped on all sides – 1,008 lf- install new appliances - relocate plumbing and gas connections balcony- install composite decking – 22x6bedroom- remove all baseboard throughout room, bathroom, closet- flooring- remove all ffe - remove all existing wall plate covers- remove existing closet- drywall, door, framing – 25 lf- d5 – demolition partial wall, repair as needed – 4 lf- bathroom- remove existing toilet – 2 ea- remove existing vanity and sink – 2 ea- remove all millwork/ cabinets - demolition framing/ drywall in bathrooms and closet – 55 lf- install new recessed lighting in bedroom – alt – 01, 13 ea- wet room – wet rated recess lights – 4 ea, line of cove light – 42 lf- run plumbing and electrical for new toilet where stair case opening is, framing work required · 113 m away
- 3212 Knox Street · Kd Knox Street Village Holdco, LLCJul 13, 2026Me+em knox street reno — renovation/alteration — renovating 3000 sq: paint, installing partition walls, minor electrical work, redoing flooring · 119 m away
- 3212 Knox StSep 9, 2026Install a new drainage system to address recurring flooding at the existing commercial storefront. work includes saw-cutting and removing approximately 36 inches of existing concrete at the sidewalk/entrance area, excavating as required, installing a new drain and approximately 8 feet of drainage piping across the sidewalk/landscape area, and extending the discharge toward the street. the work will include proper slope, connections, backfilling, and restoration of the affected concrete and landscape areas. all work will be performed in accordance with applicable city of dallas requirements · 119 m away
- 3214 Knox StJun 1, 2026Performing gas test on meter number 14c145242 · 121 m away