3214 Knox St
Dallas, TX 75205
Gas meter test permitted at 3214 Knox St
A commercial plumbing permit at 3214 Knox St covers a gas test on meter 14c145242. The City of Dallas permit was filed June 1, 2026; it does not describe new construction.
Summarized from City of Dallas records · updated Jun 1, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 1, 2026
- since Jun 1, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3214 Knox St
What is being built at 3214 Knox St?
The permit does not describe a new building. It covers a gas test on meter 14c145242.
What does permit COM-PLM-26-001982 cover?
The City of Dallas commercial plumbing permit covers performing a gas test on meter 14c145242. It was filed June 1, 2026.
When was the permit filed for 3214 Knox St?
The City of Dallas permit was filed June 1, 2026.
Is a new commercial building planned at 3214 Knox St?
The available permit describes a gas test on a meter, not construction of a new commercial building.
What's happening near Me+em Knox Street Reno?
At 3214 Knox St, a commercial plumbing permit filed June 1, 2026, covers a gas test on meter 14c145242. Me+em Knox Street Reno is listed nearby at 3212 Knox Street.
Also being built nearby
All of 75205- 3212 Knox StSep 9, 2026Install a new drainage system to address recurring flooding at the existing commercial storefront. work includes saw-cutting and removing approximately 36 inches of existing concrete at the sidewalk/entrance area, excavating as required, installing a new drain and approximately 8 feet of drainage piping across the sidewalk/landscape area, and extending the discharge toward the street. the work will include proper slope, connections, backfilling, and restoration of the affected concrete and landscape areas. all work will be performed in accordance with applicable city of dallas requirements · 3 m away
- 3212 Knox Street · Kd Knox Street Village Holdco, LLCJul 13, 2026Me+em knox street reno — renovation/alteration — renovating 3000 sq: paint, installing partition walls, minor electrical work, redoing flooring · 3 m away
- 3219 Knox StSep 30, 2020Tc-2020-2064004/02/2021-09/15/2021 · 14 m away
- 3201 Knox StFeb 6, 2026Nextech proposes to: * installing 3 heat pump package units with emergency electric heat (customer supplied) to replace units below * permit * coordinate with city of dallas for road closure permit * sub contract traffic control company to set up barricades and detour signs during lift. * tie down details * with crane service lift new units to roof * set and secure curb adaptors for units that require them * install and secure new unit per code * reconnect new unit to existing electrical and drain lines * install factory supplied hail guards and economizer * connect system to ems equipment * reconnect to existing duct work * mount and install supplied co2 sensor, remote temperature, and remote zone sensor * start unit and verify all operations * clean job site * complete final permit inspection · 22 m away
- 4625 Cole AveSep 29, 2025Apt 2floor plan 1 – 1st floor- remove baseboards- relocate door existing garage entry door – repair existing door framing, open wall for new door - remove existing ffe – return to ho- remove all outlet covers, wall plates, install new white uno- staircase- existing treads to stay, prep walls and stair treads for new finish , led tape light to be installed at each step, stair treads to be enclosed – approximately 120 lf- foyer o electrical - pendant/ chandelier 1 ea (not on material list) , recessed downlight 2 ea, line of cove light around perimeter 40 lfo paint – ceilings pt-02 (walls pt-01 not listed on plans)- powder roomo frame new walls and install door,install drywall – 26 lfo run electrical for new lighting – line of led cove lighting around ceiling – 26 lf, vanity light (nothing speced), install exhaust fan o plumbing – run plumbing for new toilet and sink, install toilet, install fauceto install mirroro vanity – no vanity on material spec sheet- install flooring in foyer and bathroom - 88 sq ft kitchen/ bathroom - remove baseboards throughout room- prep floor for new finish – approx. 1000 sq ft, install new tile ft- 01- remove all existing ffe, return to ho- remove wall plate covers, replace with white uno- remove kitchen countertops and cabinet box millwork – 2 ea- remove existing sink and faucet – 1 ea- remove cabinet millwork – 1 ea- remove existing kitchen sink and faucet- bathroom- demolition walls – 14 lf- remove existing bathroom vanity and sink- remove existing toilet - exposed wood beams to stay, protect - remove gyp ceiling, patch and repair – 28x6- install new recessed lighting – 18 ea- install led line of cove light – 46 lf- exposed beams to be wrapped on all sides – 1,008 lf- install new appliances - relocate plumbing and gas connections balcony- install composite decking – 22x6bedroom- remove all baseboard throughout room, bathroom, closet- flooring- remove all ffe - remove all existing wall plate covers- remove existing closet- drywall, door, framing – 25 lf- d5 – demolition partial wall, repair as needed – 4 lf- bathroom- remove existing toilet – 2 ea- remove existing vanity and sink – 2 ea- remove all millwork/ cabinets - demolition framing/ drywall in bathrooms and closet – 55 lf- install new recessed lighting in bedroom – alt – 01, 13 ea- wet room – wet rated recess lights – 4 ea, line of cove light – 42 lf- run plumbing and electrical for new toilet where stair case opening is, framing work required · 59 m away
- 4611 Travis StOct 13, 2026Replace 1- 40 gallon electric water heater · 118 m away
- 3133 Knox StSep 11, 2026Install 12 total pilings, voidfill · 119 m away
- 3300 Knox StMar 8, 2026Replace 60' of sewer line “ · 121 m away
- 3130 Knox StJun 18, 2026Direct replacement of 1/2" backflow device for tea machine · 121 m away
- 3313 Knox StDec 11, 2020Tc-2020-23198 duration 10/09/2020 thruu 03/09/2020 · 132 m away
- 3120 Knox StOct 23, 2025Sewer repair · 135 m away
- 3319 Knox StJul 13, 2026Refrigeration install · 137 m away