3219 Knox St
Dallas, TX 75205
3219 Knox St: 4 projects on record
City of Dallas lists 4 filings across 4 projects at 3219 Knox St, Dallas, TX 75205. The most recent, filed September 30, 2020, covers: “Tc-2020-2064004/02/2021-09/15/2021”.
Compiled from City of Dallas records · updated Sep 30, 2020
- Projects
- 4
- 4 filings
- Latest filing
- Sep 30, 2020
- since Sep 30, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Dallas
Questions about 3219 Knox St
What is being built at 3219 Knox St?
The latest filing (City of Dallas permit 2009301009, September 30, 2020) covers tc-2020-2064004/02/2021-09/15/2021.
How many permits and filings does 3219 Knox St have?
4 filings across 4 projects, from September 30, 2020 to September 30, 2020.
What is being built near Kd Knox Street Village Holdco, in Dallas?
3219 Knox St is about 15 m from Kd Knox Street Village Holdco, (3212 Knox Street). Its latest filing is for tc-2020-2064004/02/2021-09/15/2021.
Is there other construction near 3219 Knox St?
Yes. Nearby filings include 3214 Knox St (performing gas test on meter number 14c145242, Jun 1, 2026); 3212 Knox St (install a new drainage system to address recurring flooding at the existing commercial storefront. work includes saw-cutting and removing approximately 36 inches of existing concrete at the sidewalk/entrance area, excavating as required, installing a new drain and approximately 8 feet of drainage piping across the sidewalk/landscape area, and extending the discharge toward the street. the work will include proper slope, connections, backfilling, and restoration of the affected concrete and landscape areas. all work will be performed in accordance with applicable city of dallas requirements, Sep 9, 2026); 3212 Knox Street (me+em knox street reno — renovation/alteration — renovating 3000 sq: paint, installing partition walls, minor electrical work, redoing flooring, Jul 13, 2026).
How do I get alerts for new permits at 3219 Knox St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75205- 3214 Knox StJun 1, 2026Performing gas test on meter number 14c145242 · 14 m away
- 3212 Knox StSep 9, 2026Install a new drainage system to address recurring flooding at the existing commercial storefront. work includes saw-cutting and removing approximately 36 inches of existing concrete at the sidewalk/entrance area, excavating as required, installing a new drain and approximately 8 feet of drainage piping across the sidewalk/landscape area, and extending the discharge toward the street. the work will include proper slope, connections, backfilling, and restoration of the affected concrete and landscape areas. all work will be performed in accordance with applicable city of dallas requirements · 15 m away
- 3212 Knox Street · Kd Knox Street Village Holdco, LLCJul 13, 2026Me+em knox street reno — renovation/alteration — renovating 3000 sq: paint, installing partition walls, minor electrical work, redoing flooring · 15 m away
- 3201 Knox StFeb 6, 2026Nextech proposes to: * installing 3 heat pump package units with emergency electric heat (customer supplied) to replace units below * permit * coordinate with city of dallas for road closure permit * sub contract traffic control company to set up barricades and detour signs during lift. * tie down details * with crane service lift new units to roof * set and secure curb adaptors for units that require them * install and secure new unit per code * reconnect new unit to existing electrical and drain lines * install factory supplied hail guards and economizer * connect system to ems equipment * reconnect to existing duct work * mount and install supplied co2 sensor, remote temperature, and remote zone sensor * start unit and verify all operations * clean job site * complete final permit inspection · 23 m away
- 4625 Cole AveSep 29, 2025Apt 2floor plan 1 – 1st floor- remove baseboards- relocate door existing garage entry door – repair existing door framing, open wall for new door - remove existing ffe – return to ho- remove all outlet covers, wall plates, install new white uno- staircase- existing treads to stay, prep walls and stair treads for new finish , led tape light to be installed at each step, stair treads to be enclosed – approximately 120 lf- foyer o electrical - pendant/ chandelier 1 ea (not on material list) , recessed downlight 2 ea, line of cove light around perimeter 40 lfo paint – ceilings pt-02 (walls pt-01 not listed on plans)- powder roomo frame new walls and install door,install drywall – 26 lfo run electrical for new lighting – line of led cove lighting around ceiling – 26 lf, vanity light (nothing speced), install exhaust fan o plumbing – run plumbing for new toilet and sink, install toilet, install fauceto install mirroro vanity – no vanity on material spec sheet- install flooring in foyer and bathroom - 88 sq ft kitchen/ bathroom - remove baseboards throughout room- prep floor for new finish – approx. 1000 sq ft, install new tile ft- 01- remove all existing ffe, return to ho- remove wall plate covers, replace with white uno- remove kitchen countertops and cabinet box millwork – 2 ea- remove existing sink and faucet – 1 ea- remove cabinet millwork – 1 ea- remove existing kitchen sink and faucet- bathroom- demolition walls – 14 lf- remove existing bathroom vanity and sink- remove existing toilet - exposed wood beams to stay, protect - remove gyp ceiling, patch and repair – 28x6- install new recessed lighting – 18 ea- install led line of cove light – 46 lf- exposed beams to be wrapped on all sides – 1,008 lf- install new appliances - relocate plumbing and gas connections balcony- install composite decking – 22x6bedroom- remove all baseboard throughout room, bathroom, closet- flooring- remove all ffe - remove all existing wall plate covers- remove existing closet- drywall, door, framing – 25 lf- d5 – demolition partial wall, repair as needed – 4 lf- bathroom- remove existing toilet – 2 ea- remove existing vanity and sink – 2 ea- remove all millwork/ cabinets - demolition framing/ drywall in bathrooms and closet – 55 lf- install new recessed lighting in bedroom – alt – 01, 13 ea- wet room – wet rated recess lights – 4 ea, line of cove light – 42 lf- run plumbing and electrical for new toilet where stair case opening is, framing work required · 73 m away
- 4611 Travis StOct 13, 2026Replace 1- 40 gallon electric water heater · 115 m away
- 3300 Knox StMar 8, 2026Replace 60' of sewer line “ · 117 m away
- 3133 Knox StSep 11, 2026Install 12 total pilings, voidfill · 124 m away
- 3313 Knox StDec 11, 2020Tc-2020-23198 duration 10/09/2020 thruu 03/09/2020 · 127 m away
- 3130 Knox StJun 18, 2026Direct replacement of 1/2" backflow device for tea machine · 127 m away
- 3319 Knox StJul 13, 2026Refrigeration install · 131 m away
- 4550 Travis St · Weirs Plaza Owner LLC/Four Rivers CapitalFeb 21, 2025Kirkland & ellis dallas - phase 2 & 3 — renovation/alteration — phase 2: interior remodel of first generation space to include a catering kitchen, cafe and coffee bar with hot and cold serveries, cafe seating, and game lounge. phase 3: interior remodel to remove existing pantry and cafe seating, adding private · 138 m away