2100 Greenville Avenue
Dallas, TX 75206 · Greenville 2100 Ltd
Fonda Toro interior finish-out registered on Greenville Avenue
A 3,261-square-foot interior finish-out for Fonda Toro is planned at 2100 Greenville Avenue in Dallas. The project was registered with the Texas Department of Licensing and Regulation on March 6, 2026; the applicant estimated its cost at $375,000.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 6, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 6, 2026
- since Mar 6, 2026
- Largest scope
- 3,261 sf
- Estimated cost
- $375K
- state registration
Where this project stands
In state plan reviewFonda Toro
3,261 sq ft · $375K est.
- RegisteredMar 6, 2026
- Plan reviewnow
- ConstructionApr '26 – Aug '26
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectInterior finish out — 2100 greenville
TDLR project registrationRenovation/AlterationProject Registered3,261 sq ft$375K est.- Project #
- TABS2026014408
- Tenant / owner
- Fonda Toro
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2100 Greenville Avenue
What is being built at 2100 Greenville Avenue?
A 3,261-square-foot interior finish-out for Fonda Toro is registered for the address. The TDLR project registration is TABS2026014408.
When was the Fonda Toro project on Greenville Avenue permitted?
The TDLR project was registered on March 6, 2026. The record describes it as an interior finish-out.
How much will the Fonda Toro finish-out cost?
The TDLR registration lists an applicant-estimated project cost of $375,000.
How large is the Fonda Toro project at 2100 Greenville Avenue?
The registered interior finish-out covers 3,261 square feet.
What's going in next to Shoyo on Greenville Avenue?
Fonda Toro has a registered interior finish-out at 2100 Greenville Avenue, about 46 meters from Shoyo at 2114 Greenville Avenue. The project was registered on March 6, 2026.
Is Fonda Toro opening at 2100 Greenville Avenue?
The available record documents an interior finish-out for Fonda Toro, registered March 6, 2026. It does not provide an opening date.
Also being built nearby
All of 75206- 2100 Greenville AveMay 28, 2026Install receptacles and light fixtures
- 2129 Greenville AveSep 18, 2025Remove approximately 40 to 45 feet of existing deteriorated sewer pipe and install new pvc pipe with cleanouts · 20 m away
- 2026 Greenville AveDec 11, 2020Erect attached sign · 27 m away
- 2110 Greenville AveJul 1, 2025Repair the drainage system below building accessed through a tunnel · 33 m away
- 2114 Greenville AveSep 17, 2026Install new lighting and receptacle · 46 m away
- 2120 Greenville AveOct 7, 2025Replace existing 70lb grease trap · 67 m away
- 2023 Greenville AveDec 9, 2020Alcohol certification · 68 m away
- 2010 Greenville AveOct 27, 2020Service release no work · 73 m away
- 2001 Grenville Ave · Trader Joe's #403Apr 16, 2025Trader joe's #403 — renovation/alteration — interior tenant remodel including but not limited to the below points: -repair/replace finishes/new paint as required throughout. new refrigeration & freezer cases. refrigeration change from gas to co2. new check stands/relocated and revised layout · 75 m away
- 2001 Greenville AveFeb 12, 2026Replace 1/2" backflow preventer located above mop sink · 75 m away
- 2008 Greenville AveJul 30, 2026Construction of a third roof patio stair for an existing restaurant in order to increase occupant load from 466 to 763 · 79 m away
- 13 Stonebriar CtMay 14, 2025Replace 2 ton complete hvac · 93 m away