3014 Skillman St
Dallas, TX 75206
Worship center renovation at 3014 Skillman St
Permits filed in 2025 and 2026 indicate renovations to an existing worship center at 3014 Skillman St, including its restrooms and lobby. The July 2, 2025 alteration permit says the building footprint and envelope will not be changed; later permits cover plumbing, electrical, and mechanical work.
Summarized from City of Dallas records · updated Jan 16, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Jan 16, 2026
- since May 30, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
6 projectsRemodel of an existing worship center, renovation of exisiting restrooms & renovation of the existing lobby
Remodel of an existing worship center, renovation of exisiting restrooms & renovation of the existing lobby
City of Dallas permitCommercial Electrical PermitQteam inhouse remodel of an existing worship center, renovation of existing restrooms, and renovationof the existing lobby. the building footprint and envelope will not be altered
Qteam inhouse remodel of an existing worship center, renovation of existing restrooms, and renovationof the existing lobby. the building footprint and envelope will not be altered
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 3014 Skillman St
What is being built at 3014 Skillman St?
City of Dallas permits indicate renovations to an existing worship center, including work on the restrooms and lobby. The July 2, 2025 alteration permit says the building footprint and envelope will not be altered.
When were permits filed for the 3014 Skillman St renovation?
The earliest listed permit was filed May 30, 2025, for plumbing work at a baptismal pit. The latest listed permit, for mechanical work, was filed January 16, 2026.
Is a new building planned at 3014 Skillman St?
The July 2, 2025 alteration permit describes a remodel of an existing worship center and says its footprint and envelope will not be altered.
What renovation work is planned at 3014 Skillman St?
Permit descriptions include renovations to existing restrooms and the lobby, plumbing work, and installation of mechanical equipment and ductwork. The records do not specify a project cost or square footage.
What does the January 2026 permit cover at 3014 Skillman St?
The January 16, 2026 commercial mechanical permit, COM-MEC-26-000115, lists one mini-split system, two split systems, ductwork, grills, three exhaust fans, and three louvers.
What plumbing work is permitted at 3014 Skillman St?
Plumbing permits include work on the baptismal supply line, fixture replacement, and replacement of a 3/4-inch RPZ in the main boiler room. The listed plumbing permits were filed from May through December 2025.
Also being built nearby
All of 75206- 3014 Skillman Avenue · Skillman Avenue Church Of ChristApr 29, 2025The hills church dallas — renovation/alteration — remodel of an existing worship center, renovation of existing restrooms, and renovation of existing lobby
- 6038 Vanderbilt AveDec 23, 2020Install swimming pool · 128 m away
- 6030 Vanderbilt AveSep 24, 2020Remove & replace drive approach 11x10 sidewalk 50x4 · 142 m away
- 6027 Vanderbilt AveNov 1, 2020Pool and spa · 148 m away
- 6022 Vanderbilt AveJul 29, 2025Re-roof, replacement of shingles only · 157 m away
- 6043 Marquita AveSep 5, 2025Remove and replace roof shingles · 162 m away
- 6046 Goodwin AveOct 14, 2026Replace gas service from meter to house · 180 m away
- 6039 Goodwin AveMay 19, 20264 ton complete · 180 m away
- 6027 Marquita AveAug 25, 2025Installing a 8' cedar fence in the backyard. 280lft · 184 m away
- 6007 Vanderbilt AveJun 9, 2026Replace old 200 amp panel with new 200 amp 42 space · 185 m away
- 6025 Marquita AveMay 19, 2025New plumbing · 187 m away
- 6018 Marquita AveJun 11, 20261,870.8 sq ft reset/reshim · 189 m away