4228 N Central Expy
Dallas, TX 75206
Office suite renovations and finish-outs at 4228 N Central Expy
City of Dallas permits filed from May 15, 2025, through June 8, 2026, indicate ongoing interior work in office suites at 4228 N Central Expy. The permits describe suite finish-outs and expansion, along with electrical, mechanical, plumbing, sprinkler and alarm work.
Summarized from City of Dallas records · updated Jun 8, 2026
- Projects
- 16
- 16 filings
- Latest filing
- Jun 8, 2026
- since May 15, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
16 projectsMcr interior finish out and expansion of suite 350. electrical, mechanical, sprinkler & alarm
Mcr interior finish out and expansion of suite 350. electrical, mechanical, sprinkler & alarm
City of Dallas permitCommercial Alteration Addition PermitRelo 2 thermostatareplace supply air diffusers as needed in open celing area to receive gridremove, hang and reinstall layin grilles as needed for new ceiling gridrework duct as needed for supply diffuser relocates
Relo 2 thermostatareplace supply air diffusers as needed in open celing area to receive gridremove, hang and reinstall layin grilles as needed for new ceiling gridrework duct as needed for supply diffuser relocates
City of Dallas permitCommercial Mechanical PermitMcr interior finish out of existing suite that has been divided. electrical, mechanical, plumbing, fire sprinkler, firealarm
Mcr interior finish out of existing suite that has been divided. electrical, mechanical, plumbing, fire sprinkler, firealarm
City of Dallas permitCommercial Alteration Addition Permit1 supply grille rr1 exhaust fan with duct suppy grille relocate 1 supply grille overlapping wall
1 supply grille rr1 exhaust fan with duct suppy grille relocate 1 supply grille overlapping wall
City of Dallas permitCommercial Mechanical Permit
Sources: City of Dallas
Questions about 4228 N Central Expy
What is being built at 4228 N Central Expy?
City of Dallas permits indicate interior renovations and finish-outs in existing office suites, rather than a new building. The records include work on suite 350 and a divided suite.
When were permits filed for work at 4228 N Central Expy?
The records span May 15, 2025, through June 8, 2026. The latest listed permit, COM-ELC-26-002502, was filed June 8, 2026, for an electrical interior remodel.
Is there a new office building planned at 4228 N Central Expy?
The permits provided describe interior remodeling and suite work, not construction of a new building.
What work is happening in suite 350 at 4228 N Central Expy?
Permit COM-ALT-ADD-25-001680, filed December 9, 2025, describes an interior finish-out and expansion of suite 350, with electrical, mechanical, sprinkler and alarm work.
Are office suites being renovated at 4228 N Central Expy?
Yes. Permits filed in 2025 describe interior remodeling and finish-outs of existing suites, including work in a suite that had been divided.
What building systems are being updated at 4228 N Central Expy?
The permits include electrical and mechanical work, plumbing changes, and sprinkler and fire-alarm work. One permit filed November 21, 2025, covers plumbing for a break room sink.
Also being built nearby
All of 75206- 4228 N Central ExpresswayJun 2, 2026Mcr expansion of existing accounting office by1,280 sq ft office interior remodel only
- 4245 North Central Expressway · Westdale 4245 North Central, LPOct 15, 2024Salience — renovation/alteration — renovation of existing suite for new medical office space · 86 m away
- 4245 N Central ExpyOct 5, 2026Install 4-120 volt 20 amp circuits,1 subpanelfor suite # 425 · 86 m away
- 4245 N Central Expressway · 4245 NcxOct 5, 2026Salience health dallas expansion — renovation/alteration — tenant improvement · 86 m away
- 4245 N Central ExpyNov 9, 2026Install 1 vavinstall 1 fpbductwork · 86 m away
- 4926 Milam StJul 14, 202614.3 seer 3.5 ton gas hvac replacement · 160 m away
- 4930 Milam StMay 18, 2026Replace 5.0 ton system with a 5.0 ton system · 162 m away
- 2843 Lee StJun 12, 2025Change out existing 2.5 ton furnace coil and condenser with new 2.5 ton furnace coil and condenser · 166 m away
- 4164 N Central Expressway · Fitzhugh At Central, LPApr 29, 202410018_lalaland fitzhugh — renovation/alteration — non-structural tenant improvement project, the project includes, demolition of non structural elements, new non-bearing partitions ,new plumbing and and electrical. existing restroom, hvac and electrical service panel to remain. no change in use or area · 166 m away
- 2841 Lee StAug 27, 2025Install water heater · 167 m away
- 4151 N Central ExpySep 11, 2025Wiring the dryers for car wash · 169 m away
- 2819 N Fitzhugh AveMay 25, 2025Installation of (2) 19.5 dual port chargers electrifying four spaces. scope of the project to include:1) routing of 140' 1-1/4" emt conduit in garage from panel hp2b to new charger location.2) installation of 2 - 40 amp circuits one per charger.3) installation of owner provided evr l2 power beam system with disconnect post4) installation of 2 owner provided l2 dual chargers.5) installation of two bolt in place bollards.6) installation of 2 owner provided ev signage.7) relocation of circuits to 125 amp panel to create space in 200 amp panel · 170 m away
More offices in 75206.