5300 E Mockingbird Ln
Dallas, TX 75206
Backflow replacements permitted at 5300 E Mockingbird Ln
Two commercial plumbing permits cover backflow replacements in the pump riser room at 5300 E Mockingbird Ln. The permits were filed on September 12 and November 10, 2025; they do not describe a new building.
Summarized from City of Dallas records · updated Nov 10, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Nov 10, 2025
- since Sep 12, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 5300 E Mockingbird Ln
What is being built at 5300 E Mockingbird Ln?
The City of Dallas records show backflow replacements in the pump riser room, not a new building. Two commercial plumbing permits were filed for this work in 2025.
What work is happening at 5300 E Mockingbird Ln?
The permits describe replacing backflow equipment in the pump riser room. Both are commercial plumbing permits.
When were permits filed for work at 5300 E Mockingbird Ln?
The permits were filed on September 12, 2025, and November 10, 2025. Their numbers are COM-PLM-25-001756 and COM-PLM-25-002375.
Is a new building planned at 5300 E Mockingbird Ln?
The records provided do not indicate a new building. They show two permits for backflow replacements in the pump riser room.
What is happening near Ascend Collateral Exams on N Central Expressway?
At 5300 E Mockingbird Ln, about 100 meters from Ascend Collateral Exams, City of Dallas permits describe backflow replacements in a pump riser room.
Are there commercial plumbing permits for 5300 E Mockingbird Ln?
Yes. The City of Dallas issued two commercial plumbing permit records for backflow replacement work, filed September 12 and November 10, 2025.
Also being built nearby
All of 75206- 5300 E Mockingbird Lane · Lcp Highland Spe, LLCMay 31, 2024Curio - public spaces — renovation/alteration — replacement of select finishes, lighting and ff&e in ground floor public spaces to include lobby and restrooms. replacement of select lighting and ff&e in bar. replacement of select lighting in restaurant. converting 4 existing parking spaces (2 o
- 5656 N Central ExpySep 3, 2025Replacing backflow valve“ · 27 m away
- 5326 E Mockingbird LnDec 16, 2020Permanent electrical service · 49 m away
- 5910 North Central Expressway Floors 4, 5, 6, 7 · 5910 Ncx Owner, LLCJan 10, 2024Amwins dallas — renovation/alteration — over approx. 76,000sqft amwins will be implementing a new interior renovation to their office premises at premier place · 100 m away
- 5910 North Central Expressway · 5910 Ncx Owner, LLCApr 27, 2026Reeder capital partners — renovation/alteration — the scope of this project is a non-structural interior finish-out in an existing single floor suite for the above named tenant. scope includes hvac, electrical, plumbing · 100 m away
- 5910 N Central Expy 850, 950, 1450, 1470,1580,1595 · 5910 Ncx Owner, LLCAug 2, 2024Speculative suites — renovation/alteration — interior finish-out of existing office space · 100 m away
- 5910 N. Central Expwy · 5910 Ncx Owner, LLCJan 7, 2025Vista wealth partners — renovation/alteration — interior finish out of existing office space · 100 m away
- 5910 N Central Expresswa · Lsref7 Premier Place Propco, LLCJul 12, 2024Md2 dallas park cities — renovation/alteration — interior tenant build out · 100 m away
- 5910 N Central Expy · 5910 Ncx Owner, LLCNov 4, 2026New plumbing for showers, floor sinks · 100 m away
- 5910 N. Central Expressway · Lsref7 Premier Place Propco, LLCAug 5, 2026Brown ruth advisors — renovation/alteration — expansion of existing space and minor renovation (2,271 sq ft) · 100 m away
- 5307 East Mockingbird Lane · Cpus Mockingbird, LPMar 16, 2026Vela wood 2025 expansion — renovation/alteration — interior renovation of existing office space in a high rise building · 101 m away
- 5307 E Mockingbird Ln · Cpus Mockingbird LP - Cbre Global Investors LLCJul 20, 2026Provide and install:• rework existing hvac ducting to accommodate for new layout • (13) install new registers, grilles, and diffusers • (13) ra sound boots in exam rooms • (2) relocate existing thermostat(s) as required (location shown m2.03)• mechanical inspection of existing hvac equipment · 101 m away