groundranger
Recent · latest filing Jan 2026Residential

5310 Morningside Ave

Dallas, TX 75206

Bathroom remodels and HVAC replacement at 5310 Morningside Ave

Dallas permits indicate bathroom remodeling work at 5310 Morningside Ave, including a tub-to-shower conversion, filed in June 2025. A permit filed January 23, 2026, covers replacement of the home's full 4-ton HVAC system.

Summarized from City of Dallas records · updated Jan 23, 2026

Projects
4
4 filings
Latest filing
Jan 23, 2026
since Jun 8, 2025
Largest scope
—
Listed value
—

Permit & project history

4 projects
  1. 15seer 4 ton full system replacement

    15seer 4 ton full system replacement

    City of Dallas permitResidential Mechanical Permit
    Record
    RES-MEC-26-000347
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Master bathroom remodel1.wire in and install (1) 6 inch led recessed light in shower2.wire in and install (1) exhaust/heat ceiling fan3.relocate (2) existing backsplash outlets4.install (2) new switches

    Master bathroom remodel1.wire in and install (1) 6 inch led recessed light in shower2.wire in and install (1) exhaust/heat ceiling fan3.relocate (2) existing backsplash outlets4.install (2) new switches

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-25-000958
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Remodel of bathroom shower, tub and valves

    Remodel of bathroom shower, tub and valves

    City of Dallas permitResidential Plumbing Permit
    Record
    RES-PLM-25-001756
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Nsfaa-plumbing tub to shower conversionrough in & install new shower head system electricwire in & install 2 vanity light fixtureswire in & install 1 recessed light fixturerelocate 2 outlets

    Nsfaa-plumbing tub to shower conversionrough in & install new shower head system electricwire in & install 2 vanity light fixtureswire in & install 1 recessed light fixturerelocate 2 outlets

    City of Dallas permitResidential Alteration Addition Permit
    Record
    RES-ALT-ADD-25-000293
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 5310 Morningside Ave

What work is permitted at 5310 Morningside Ave?

City of Dallas permits cover bathroom remodeling, electrical and plumbing work, and replacement of the home's full HVAC system. The filings range from June 8, 2025, to January 23, 2026.

Is there a bathroom remodel at 5310 Morningside Ave?

Yes. June 2025 permits describe a bathroom remodel, including a tub-to-shower conversion and work on the shower, tub, and valves.

What does the tub-to-shower permit include at 5310 Morningside Ave?

The June 8, 2025, alteration permit describes converting a tub to a shower, installing a shower head system and vanity and recessed lights, and relocating two outlets.

Is the HVAC system being replaced at 5310 Morningside Ave?

A City of Dallas mechanical permit filed January 23, 2026, describes replacement of a 15-SEER, 4-ton full system.

What electrical work was permitted at 5310 Morningside Ave?

A June 25, 2025, electrical permit describes installing a recessed shower light and an exhaust/heat ceiling fan, relocating two backsplash outlets, and installing two switches.

Also being built nearby

All of 75206
Get alerts for 5310 Morningside Ave