5354 Vickery Blvd
Dallas, TX 75206
5354 Vickery Blvd: 1 project on record
City of Dallas lists 1 filing across 1 project at 5354 Vickery Blvd, Dallas, TX 75206. The most recent, filed July 31, 2025, covers: “Added new gas line for a meter relocation”.
Compiled from City of Dallas records · updated Jul 31, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 31, 2025
- since Jul 31, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 5354 Vickery Blvd
What is being built at 5354 Vickery Blvd?
The latest filing (City of Dallas permit RES-PLM-25-003159, July 31, 2025) covers added new gas line for a meter relocation.
How many permits and filings does 5354 Vickery Blvd have?
1 filing across 1 project, from July 31, 2025 to July 31, 2025.
Is there other construction near 5354 Vickery Blvd?
Yes. Nearby filings include 5351 Vickery Blvd (this project involves the construction of a new rear gate that will be 8 ft. tall and an automated sliding gate that will be 24 ft. in length and a concrete apron, May 12, 2026); 5334 Vickery Blvd (new hvac systems and ducts, Nov 6, 2026); 5355 Miller Ave (foundation repair - installation of jack pads, floor joists and treated beams, Nov 13, 2026).
How do I get alerts for new permits at 5354 Vickery Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75206- 5351 Vickery BlvdMay 12, 2026This project involves the construction of a new rear gate that will be 8 ft. tall and an automated sliding gate that will be 24 ft. in length and a concrete apron · 16 m away
- 5334 Vickery BlvdNov 6, 2026New hvac systems and ducts · 45 m away
- 5355 Miller AveNov 13, 2026Foundation repair - installation of jack pads, floor joists and treated beams · 108 m away
- 5343 Miller AveNov 4, 2020Install fence · 112 m away
- 5354 Miller AveMar 7, 2026Re-roof · 121 m away
- 5331 Miller AveSep 2, 2025Remove and replace shingles down to decking · 121 m away
- 5348 Goodwin AveJun 19, 2026Re-roof: tear off and disposal of old roofing material and install new roof system · 121 m away
- 5338 Goodwin AveMay 20, 2026Install 9.5 gallon tankless in second floor pull down attic. replaced 2 50 gallon gas water heaterswith a tankless · 126 m away
- 5323 Miller AveJun 30, 2025Installing power to un attached garage · 131 m away
- 5328 Miller AveDec 30, 2020Build swimming pool and spa · 135 m away
- 5341 Goodwin AveJun 25, 2025Replace 1- 2 ton furnace · 137 m away
- 5318 Miller AveMay 28, 2026Gas line to pool heater, sewer reroute and water reroute · 146 m away