5419 Vickery Blvd
Dallas, TX 75206
5419 Vickery Blvd: 4 projects on record
City of Dallas lists 4 filings across 4 projects at 5419 Vickery Blvd, Dallas, TX 75206 since May 15, 2025. The most recent, filed May 22, 2025, covers: “Installed washer box and drain line for washing machine. installed supply line and drain for island sink”.
Compiled from City of Dallas records · updated May 22, 2025
- Projects
- 4
- 4 filings
- Latest filing
- May 22, 2025
- since May 15, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsInstalled washer box and drain line for washing machine. installed supply line and drain for island sink
Installed washer box and drain line for washing machine. installed supply line and drain for island sink
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 5419 Vickery Blvd
What is being built at 5419 Vickery Blvd?
The latest filing (City of Dallas permit RES-PLM-25-000735, May 22, 2025) covers installed washer box and drain line for washing machine. installed supply line and drain for island sink.
How many permits and filings does 5419 Vickery Blvd have?
4 filings across 4 projects, from May 15, 2025 to May 22, 2025.
Is there other construction near 5419 Vickery Blvd?
Yes. Nearby filings include 5418 Vickery Blvd (replace shingles, Dec 1, 2025); 5430 Vickery Blvd (replace water heater & replace/test gas service, Nov 9, 2020); 5436 Vickery Blvd (hvac change out – remove & replace condenser and coil + no new duct work + attic installation + replace plenum, Apr 27, 2026).
How do I get alerts for new permits at 5419 Vickery Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75206- 5418 Vickery BlvdDec 1, 2025Replace shingles · 13 m away
- 5430 Vickery BlvdNov 9, 2020Replace water heater & replace/test gas service · 32 m away
- 5436 Vickery BlvdApr 27, 2026Hvac change out – remove & replace condenser and coil + no new duct work + attic installation + replace plenum · 46 m away
- 5443 Vickery BlvdOct 23, 2020Complete work from previous permit # 2006061082 · 59 m away
- 5450 Vickery BlvdJan 20, 2021Install water heater · 79 m away
- 5458 Vickery BlvdMay 14, 20266ft fence till building structure and then 8ft fence after. pressure treated pickets 270 linear ft of fence · 98 m away
- 5420 Goodwin AveJun 10, 2026Mcr with battery zack mahdavi - installing a 28.56 kw pv solar system, 4 tesla pw3 batteries, 1 tesla dc expansion pack and 2 main panel service upgrades (span) · 109 m away
- 5412 Goodwin AveSep 17, 2025Replace 2x 4 ton completes · 110 m away
- 5410 Goodwin AveJul 7, 2025143ft board on board cedar fence no taller than 9ft with (2) walk gates · 110 m away
- 5434 Goodwin AveOct 21, 2025Mechanical work addition/remodel duct work and new hvac system · 116 m away
- 5432 Miller AveMay 8, 2026Installed 50 gallon electric water heater in garage · 138 m away
- 5449 Goodwin AveApr 15, 2026New cedar side fence 6' high, rear fence 8' high with a 20' wide rolling gate · 142 m away