5730 Martel Ave
Dallas, TX 75206
Driveway approach work permitted at 5730 Martel Ave
City of Dallas permits indicate driveway and driveway-approach work at 5730 Martel Ave, not a new building. A permit filed February 19, 2026, describes removing the driveway and driveway approach; an earlier permit filed November 10, 2025, describes removing and replacing the driveway approach.
Summarized from City of Dallas records · updated Feb 19, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Feb 19, 2026
- since Nov 10, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 5730 Martel Ave
What is being built at 5730 Martel Ave?
The City of Dallas records show driveway and driveway-approach work, not a new building. Permit RES-DSW-26-000080, filed February 19, 2026, describes removing the driveway and driveway approach.
What work is planned at 5730 Martel Ave?
Two residential drive approach and sidewalk permits are listed. One describes driveway approach removal and replacement, and the later permit describes removing the driveway and driveway approach.
When was the latest permit filed for 5730 Martel Ave?
The latest listed permit was filed February 19, 2026. It is permit RES-DSW-26-000080.
Is a new home being built at 5730 Martel Ave?
The records provided do not indicate a new home. They list permits for driveway and driveway-approach work.
What work is permitted at 5730 Martel Ave near Sip 4500 on Greenville Avenue?
The City of Dallas permits list driveway and driveway-approach work at 5730 Martel Ave. They do not identify work at Sip 4500, listed at 3607 Greenville Ave.
Also being built nearby
All of 75206- 5729 Martel AveNov 26, 2025Gas test · 13 m away
- 5740 Martel AveJan 29, 2026Remove and replace approximately 408 square feet of 8"–10" thick concrete at the driveway entrance and 32 square feet of 4" thick sidewalk.work to include:demolition & removal:saw cut and remove existing concrete in designated areas.haul off and properly dispose of all concrete and construction debris.subgrade preparation:compact (tamper down) the existing ground to achieve a stable base.install cushion sand as needed for proper leveling and support.reinforcement & concrete installation:install #3 rebar reinforcement per standard spacing requirements.pour 4000 psi concrete to the specified thickness (8"–10" for driveway, 4" for sidewalk).apply a broom finish for texture and slip resistance · 20 m away
- 3611 Greenville AveJun 20, 2025Clean and show permit · 73 m away
- 3526 Greenville AveJan 5, 2021Remodel existing plumbing · 73 m away
- 3619 Greenville AveSep 29, 2026Zo bc request to permit existing front and back patio awning structures.1. patio awning - front patio 34ft x10ft (existing structure when business was opened but was not permitted)2. patio awning - back patio 41ft x 33ft (added to existing structure) · 74 m away
- 3607 Greenville Ave · Sip 4500, LLC C/0 Sf Waranch Co.Jun 9, 2025Installing new mini split system, ductwork, air devices, mechanical insulation. 1 existing rooftop unit · 76 m away
- 3602 Greenville AveDec 1, 2025Instálele new system · 79 m away
- 3606 Greenville Ave · Uptown Ventures LLCNov 2, 2026Tacos richy — renovation/alteration — interior remodel · 80 m away
- 3610 Greenville AveSep 15, 2026Gas test · 81 m away
- 3612 Greenville AveSep 15, 2026Gas test · 82 m away
- 3601 Greenville AveApr 17, 2026Replace rpz for soda machine · 85 m away
- 5718 Penrose AveAug 13, 2026Gas test with release to atmos · 98 m away