5743 Penrose Ave
Dallas, TX 75206
Gas pressure test permitted at 5743 Penrose Ave
A residential plumbing permit for a gas pressure test at 5743 Penrose Ave was filed with the City of Dallas on January 14, 2026. The record does not specify additional work or a construction timeline.
Summarized from City of Dallas records · updated Jan 14, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 14, 2026
- since Jan 14, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 5743 Penrose Ave
What is being done at 5743 Penrose Ave?
A City of Dallas residential plumbing permit lists a gas pressure test. The permit was filed January 14, 2026.
Is new construction planned at 5743 Penrose Ave?
The available record is for a gas pressure test, not a new-construction project. It does not describe other planned work.
When was the gas pressure test permitted at 5743 Penrose Ave?
The permit was filed on January 14, 2026. Its number is RES-PLM-26-000531.
What kind of permit was filed for 5743 Penrose Ave?
The City of Dallas record identifies it as a residential plumbing permit for a gas pressure test.
What is happening near Uptown Ventures on Greenville Avenue?
A City of Dallas permit at 5743 Penrose Ave, about 101 meters from Uptown Ventures at 3606 Greenville Ave, lists a residential gas pressure test. It was filed January 14, 2026.
Also being built nearby
All of 75206- 5739 Penrose AveDec 8, 2020Install lawn sprinkler · 8 m away
- 5737 Penrose AveDec 8, 2020Install lawn sprinkler · 12 m away
- 5718 Penrose AveAug 13, 2026Gas test with release to atmos · 50 m away
- 5717 Penrose AveNov 12, 2025Install 50 gallon electric water heater · 52 m away
- 5730 Kenwood AveJul 13, 2026Nsfaa scope of workproject address: 5730 kenwood ave, dallas, tx 75206project descriptioncomplete removal of the existing masonry fireplace and chimney, including all interior and exterior components. the existing chimney structure will be demolished from the firebox through the roof penetration. the affected wall area will be reframed and restored with a new exterior window, interior finishes, and exterior materials to match the existing residence.estimated alteration area: 50 sq ftdemolition* remove existing masonry fireplace.* remove entire chimney structure above roof and along exterior wall.* remove all associated brick, framing, flashing, roofing, and chimney components.* remove debris and dispose of materials off-site.framing & structural restoration* frame new exterior wall in the former chimney location.* install framing to match existing construction.* use either 2x4 or 2x6 framing members, depending on existing wall construction.* install required king studs, jack studs, header, blocking, and structural support as required.window installation* install one new exterior window.* approximate window size: 41” w × 70” h (3’-5” × 5’-10”). * flash and weatherproof window opening.* seal all penetrations and install trim as required.exterior restoration* install insulation in wall cavity.* install plywood sheathing.* install zip tape at all seams.* install weather barrier / weather shield system.* install siding to match existing house.* install soffit materials to match existing house.* install fascia boards to match existing house.* install shingles and drip edge to match existing roof.* restore exterior finishes to blend with existing residence.interior restoration* install drywall in affected areas.* tape, float, and finish drywall.* apply texture to match existing walls and ceilings.* prime and paint repaired areas to match existing interior finishes.materials* approximately twenty (20) 2x4 or 2x6 framing members, 8’-10’ length (to match existing framing)* insulation* plywood sheathing* zip tape* weather shield roll* siding materials to match existing house* soffit materials to match existing house* fascia boards to match existing house* roofing shingles to match existing roof* drip edge to match existing roof* flashing, fasteners, sealants, and miscellaneous installation materialsnotes* all dimensions to be field verified prior to construction.* new window installation and exterior finishes shall comply with applicable city of dallas building codes.* final window specifications may be adjusted based on field conditions and structural requirements · 83 m away
- 5743 Kenwood AveAug 18, 2026Panel upgrade · 92 m away
- 5718 Kenwood AveJun 16, 2026Re-roof of main dwelling · 93 m away
- 5735 Kenwood AveAug 11, 2025Replace 4 ton condenser and coil only · 94 m away
- 3723 Greenville AveJan 12, 2021Upgrading equipment on existing cell tower · 97 m away
- 3612 Greenville AveSep 15, 2026Gas test · 99 m away
- 5729 Martel AveNov 26, 2025Gas test · 99 m away
- 3610 Greenville AveSep 15, 2026Gas test · 100 m away