5950 Lewis St
Dallas, TX 75206
5950 Lewis St: 1 project on record
City of Dallas lists 1 filing across 1 project at 5950 Lewis St, Dallas, TX 75206. The most recent, filed October 1, 2020, covers: “Install city walk only”.
Compiled from City of Dallas records · updated Oct 1, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Oct 1, 2020
- since Oct 1, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 5950 Lewis St
What is being built at 5950 Lewis St?
The latest filing (City of Dallas permit 2010015001, October 1, 2020) covers install city walk only.
How many permits and filings does 5950 Lewis St have?
1 filing across 1 project, from October 1, 2020 to October 1, 2020.
Is there other construction near 5950 Lewis St?
Yes. Nearby filings include 5946 Lewis St (building 5 condos -3 story, Aug 15, 2025); 5968 Lewis St (replace 30 gal gas water heater, Nov 2, 2026); 5927 Lewis St (gas test, Dec 9, 2025).
How do I get alerts for new permits at 5950 Lewis St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75206- 5946 Lewis StAug 15, 2025Building 5 condos -3 story · 12 m away
- 5968 Lewis StNov 2, 2026Replace 30 gal gas water heater · 53 m away
- 5927 Lewis StDec 9, 2025Gas test · 80 m away
- 5920 Lewis StMay 13, 2026Demolition house · 89 m away
- 5918 Lewis StJul 30, 2026In person qteam meeting 5.19.26 (9am) 00000155863000000 parcel lewis town house new construction 12 units 22 ,328 sq ft living =total sq ft 36,0004 units 2450 living +140 deck +garage 470 =3000 sq ft 8 unit 1716 living +140 deck total 3000 sq fttotal construction only building $1,600,00 record predev-25-000132: pre development meeting)record status: closed - completeexpiration date: 03/28/2026 · 94 m away
- 5924 La Vista DrDec 4, 2025Gas test · 96 m away
- 5934 La Vista DrAug 28, 2025Single ac condenser + coil-only change out - no duct work · 96 m away
- 5959 Ross AveMay 14, 20262 ton el16 heat pump with first company air handler · 100 m away
- 5900 La Vista DrJun 16, 2025Gas test · 104 m away
- 5970 Ross AveAug 17, 2026We plan on replacing a section of the city sidewalk · 106 m away
- 5968 Ross AveAug 18, 2026Nstall new perimeter fencing consisting of: rear fence: 130 linear feet of 8-foot-tall wood privacy fence with 6-inch wood pickets. side fence: 6-foot-tall wood privacy fence with 6-inch wood pickets. front fence: 75 linear feet of 4-foot-tall ornamental iron fence with one automatic/manual sliding gate. construction specifications: fence posts spaced at 8 feet on center (o.c.). wood fence posts: 2-3/8-inch galvanized steel posts set in 12-inch diameter × 24-inch deep concrete footings (minimum 3,000 psi concrete). horizontal rails: 2” × 4” pressure-treated lumber. fence pickets: 1” × 6” cedar or pressure-treated wood. sliding gate supported by steel gate posts installed per manufacturer’s requirements and set in reinforced concrete footings sized to support the gate load · 107 m away
- 5929 La Vista DrAug 14, 2025Gas test/repair leak · 108 m away