6027 Velasco Ave
Dallas, TX 75206
HVAC systems and water heater replacements at 6027 Velasco Ave
City of Dallas permits at 6027 Velasco Ave cover replacement of a 50-gallon gas water heater and two gas HVAC systems. The first permit was filed February 3, 2026, and the latest was filed September 23, 2026.
Summarized from City of Dallas records · updated Sep 23, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Sep 23, 2026
- since Feb 3, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 6027 Velasco Ave
What is happening at 6027 Velasco Ave in Dallas?
City permits indicate replacements of a 50-gallon gas water heater and two gas HVAC systems. The filings are dated February 3, February 13 and September 23, 2026.
Is a new house being built at 6027 Velasco Ave?
The records provided show residential plumbing and mechanical permits for equipment replacements, not a new-home construction permit.
What HVAC work is permitted at 6027 Velasco Ave?
Two permits describe replacing complete gas systems: a 3-ton system under permit RES-MEC-26-000630, filed February 13, 2026, and a 4-ton system under RES-MEC-26-005283, filed September 23, 2026.
Is a water heater being replaced at 6027 Velasco Ave?
Yes. Permit RES-PLM-26-001232, filed February 3, 2026, describes replacing a 50-gallon gas water heater.
When were permits filed for work at 6027 Velasco Ave?
The three City of Dallas filings are dated February 3, February 13 and September 23, 2026.
Also being built nearby
All of 75206- 6019 Velasco AveJan 20, 2021Install water heater · 15 m away
- 6035 Velasco AveJul 2, 20258' and 6' wood fence on steel posts · 15 m away
- 6039 Velasco AveJan 19, 2026Replace 3 ton gas hvac unit · 23 m away
- 6010 Velasco AveApr 14, 2026Nsfaa-replace front porch contrete slab -conservation district · 33 m away
- 6045 Velasco AveOct 22, 2025This project consists of installing a new concrete driveway , approach and replacing city sidewalk within the property limits as shown on the construction plans. the work includes grading, formwork, rebar placement, concrete pouring, and finishing, all in accordance with city of dallas standards and specifications · 35 m away
- 6044 Velasco AveOct 8, 2026Installed 2 50 gallon gas american water heater in second floor walk in attic · 37 m away
- 6047 Velasco AveAug 11, 2025New hvac system with condenser, coil, furnace and new duct work · 39 m away
- 6026 Llano AveMay 20, 2025Remodel existing plumbing · 104 m away
- 6018 Llano AveJan 25, 2021Demolition sfd · 105 m away
- 6014 Llano AveAug 20, 20255 ton system replacement · 106 m away
- 6037 Palo Pinto AveOct 13, 2026Install 3 piers · 127 m away
- 6009 Palo Pinto AveJan 12, 2021Upgrade existing electrical service · 130 m away