8250 N. Central Expressway
Dallas, TX 75206 · Black Forest Cc Hotel LLC
DoubleTree Dallas Campbell Centre public-area renovation
A 26,245-square-foot public-area renovation at the DoubleTree Dallas Campbell Centre was registered with TDLR on October 26, 2026. The work includes finishes in the lobby, meeting rooms and toilet facilities, a new meeting room within existing space, and reconfiguring a bar into a bar and coffee bar. The applicant estimates the project cost at $2.3 million.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 26, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 26, 2026
- since Oct 26, 2026
- Largest scope
- 26,245 sf
- Estimated cost
- $2.3M
- state registration
Where this project stands
Approved · construction starts Jan 5, 2027Doubletree Dallas Campbell Centre Public Area Renovation
26,245 sq ft · $2.3M est.
- RegisteredOct 26, 2026
- Plan review
- ConstructionJan '27 – May '27
- Inspected
- Closed
A 4-month build is scheduled. Bids for subcontractors and suppliers usually close before the start date.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectPrimarily finishes renovations to the lobby, meeting room areas, toilet facilities, addition of a new meeting room (in existing space) and reconfiguration of a bar into a new bar/coffee bar. — doubletree dallas campbell centre
TDLR project registrationRenovation/AlterationReview Complete26,245 sq ft$2.3M est.- Project #
- TABS2027004428
- Tenant / owner
- Doubletree Dallas Campbell Centre Public Area Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 8250 N. Central Expressway
What is being renovated at 8250 N. Central Expressway?
A TDLR registration describes public-area renovations at the DoubleTree Dallas Campbell Centre, including the lobby, meeting room areas and toilet facilities. It also lists a new meeting room in existing space and a bar reconfigured as a bar and coffee bar.
When was the DoubleTree Dallas Campbell Centre renovation filed?
The project was registered with TDLR on October 26, 2026. Its registration number is TABS2027004428.
How large is the DoubleTree renovation in Dallas?
The TDLR project registration lists 26,245 square feet for the renovation.
How much will the DoubleTree Dallas Campbell Centre renovation cost?
The applicant's TDLR estimate is $2.3 million for the project.
Is a new meeting room being added at the DoubleTree on North Central Expressway?
Yes. The registration describes adding a meeting room within existing space as part of the public-area renovation.
Is the bar at the DoubleTree Dallas Campbell Centre changing?
The project description says a bar will be reconfigured into a new bar and coffee bar. The registration does not provide an opening date.
What is the status of the DoubleTree renovation registration?
The TDLR record lists the status as Review Complete. It was registered on October 26, 2026, under project number TABS2027004428.
Also being built nearby
All of 75206- 8250 N Central ExpyOct 29, 2026Zo bc-expedited primarily finish renovation to the lobby, ballrooms, meeting rooms and toilet facilities with the addition of building (1) new meeting room
- 8290 S Central ExpyJun 4, 2026Electrical repair to owner provided transformer · 281 m away
- 8050 S Central ExpyMar 10, 2026Pole mounted electrical service. we are upgrading an existing service that has been disconnected so we can have service turned back on to provide power to an envirormental weather station.note: the address that we show for this is 8050 s central expy - this would not come up in your system · 320 m away
- 8050 S Central ExpyMar 27, 2026Pole mounted electrical service. we are upgrading an existing service that has been disconnected so we can have service turned back on to provide power to an envirormental weather station · 320 m away
- 7745 S Central ExpyJun 2, 2026Extent 4 inch pipe and run wire from transformer to unit container.ground grid and ground fence · 333 m away
- 7745 S Central Expressway · Danik Data CenterApr 29, 2024Danik data center — new construction — three new data center modular buildings on subkect property · 333 m away
- 7912 Carbondale StDec 19, 2025New construction residential · 378 m away
- 7924 Carbondale StJul 7, 2026Service installation. installing an electrical pole in a vacant lot for enviromental station · 379 m away
- 7932 Carbondale StSep 12, 2025No work being done · 380 m away
- 4515 Burma RdNov 9, 2026Wire new construction per code · 418 m away
- 4504 Burma RdFeb 11, 2026This application is for a fence permit to allow screening of the property in connection with a proposed contractor’s maintenance yard. the fence has already been constructed.to obtain the certificate of occupancy (co) for the property, the city has required that the existing demolition permit be finalized. while the demolition work is complete, the inspector has requested that a fence permit be submitted before issuing a green tag on the demolition permit. once the fence permit application is in place, the demolition permit can be finalized, allowing us to proceed with the co application for the contractor’s maintenance yard · 421 m away
- 7828 Carbondale StMar 17, 2026New construction (residential) 7824 carbondale st · 434 m away
More restaurants in 75206.