600 S Riverfront Blvd
Dallas, TX 75207
Permit covers gazebo and interior updates at 600 S Riverfront Blvd
A commercial alteration permit filed May 21, 2026, covers adding a gazebo and interior work at 600 S Riverfront Blvd. The permit description lists ceiling, lighting, toilet and sink replacements, along with wall and floor painting.
Summarized from City of Dallas records · updated May 21, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 21, 2026
- since May 21, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectAdding gazeboreplace ceiling faultreplace fixture lightsreplace toilets sinkspaint wallspaint floor
Adding gazeboreplace ceiling faultreplace fixture lightsreplace toilets sinkspaint wallspaint floor
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 600 S Riverfront Blvd
What is being built at 600 S Riverfront Blvd?
A City of Dallas commercial alteration permit describes adding a gazebo and making interior updates, including replacing ceiling materials, lights, toilets and sinks, and painting walls and floors.
When was the permit filed for 600 S Riverfront Blvd?
The permit was filed May 21, 2026. Its number is COM-ALT-ADD-26-001227.
Is 600 S Riverfront Blvd getting a new building?
The record is for a commercial alteration and addition permit, not a new-building permit. It describes a gazebo and interior work.
What interior work is planned at 600 S Riverfront Blvd?
The permit description lists ceiling and light fixture replacements, toilet and sink replacements, and painting walls and floors.
What business is going into 600 S Riverfront Blvd?
The permit record does not name a business or occupant.
How much will the work at 600 S Riverfront Blvd cost?
The permit record does not report a project valuation or cost estimate.
Also being built nearby
All of 75207- 608 S Riverfront BlvdNov 18, 2025See comments electrical to 3 jobsite trailers, site lighting · 117 m away
- 518 S Riverfront BlvdNov 10, 2026Add a service disconnect · 118 m away
- 506 S Riverfront BlvdFeb 26, 2026Add an ada compliant restroom · 121 m away
- 512 S Riverfront BlvdOct 22, 2026Remodel current retail space into a boxing gym · 131 m away
- 515 S Riverfront BlvdDec 3, 2025Toilets, frp, vanities, drywall patch/repair, paint, changing fixtures, tile, sinks, floor finish, fix damaged drains, remove part of interior wall (non load baring) close up window and door and fix various other things damaged by vandalism and car crashes. change use from office to restaurant · 153 m away
- 773 S Riverfront BlvdSep 15, 2025Install (6) supercharger cabinets · install (24) supercharger posts · install (1) switchgear assembly with integrated tesla site controller and primary broadcast unit · install (1) utility transformer, (1) meter, and other associated utility equipment· install (2) pole mounted luminaire(s) · install (1) wireless access point(s) · 284 m away
- 700 S Stemmons FwyAug 4, 2026Water and sewer services only meter release · 472 m away
- 351 S Riverfront BlvdJun 17, 2025Removal of glass windows and do brick wall instead of glass. store gets too hot with all of the glass in the front area · 472 m away
- 339 S Riverfront BlvdOct 28, 2026Zo bc kitchen remodel for existing convenience store (kitchen is approximately 255sf) · 517 m away
- 505 N RiverfrontJul 14, 2026New 100a, 120/240v single phase, overhead service for union pacific railroad · 544 m away
- 500 Memorial DrMay 11, 2026Electrical service connection for the new convention center construction trailer · 555 m away
- 602 S Houston StNov 20, 2025Mcr the project consists of the partial (southern half) demolition of the dallas morning news building · 573 m away