608 S Riverfront Blvd
Dallas, TX 75207
Temporary power and lighting for a construction laydown yard
Dallas electrical permits filed November 13 and 18, 2025, cover temporary power and site lighting for a construction laydown yard at 608 S Riverfront Blvd. The work includes lighting poles around the yard and electrical connections for three construction trailers.
Summarized from City of Dallas records · updated Nov 18, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Nov 18, 2025
- since Nov 13, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsInstallation of temporary power and lighting for construction "laydown yard". we will provide site lighting and power. 4 poles around perimeter for yard lighting, hook up 3 construction trailers. service equipment (1) 320amp meter with (2) 200amp load centers 1 phase 240v outdoors on service rack
Installation of temporary power and lighting for construction "laydown yard". we will provide site lighting and power. 4 poles around perimeter for yard lighting, hook up 3 construction trailers. service equipment (1) 320amp meter with (2) 200amp load centers 1 phase 240v outdoors on service rack
City of Dallas permitCommercial Electrical Permit
Sources: City of Dallas
Questions about 608 S Riverfront Blvd
What is being built at 608 S Riverfront Blvd?
Dallas permit records describe temporary power and site lighting for a construction laydown yard, including connections for three jobsite trailers. They do not describe a permanent building project.
What do the permits at 608 S Riverfront Blvd cover?
The permits cover temporary electrical service, lighting around the yard and power for construction trailers. They were filed November 13 and 18, 2025.
When were permits filed for 608 S Riverfront Blvd?
The City of Dallas filed permit COM-ELC-25-003151 on November 13, 2025, and permit COM-ELC-25-003180 on November 18, 2025.
How many construction trailers will get power at 608 S Riverfront Blvd?
The permit descriptions refer to electrical connections for three construction trailers.
Will there be site lighting at 608 S Riverfront Blvd?
Yes. The permits describe site lighting, including four poles around the perimeter of the laydown yard.
Also being built nearby
All of 75207- 600 S Riverfront BlvdMay 21, 2026Adding gazeboreplace ceiling faultreplace fixture lightsreplace toilets sinkspaint wallspaint floor · 117 m away
- 773 S Riverfront BlvdSep 15, 2025Install (6) supercharger cabinets · install (24) supercharger posts · install (1) switchgear assembly with integrated tesla site controller and primary broadcast unit · install (1) utility transformer, (1) meter, and other associated utility equipment· install (2) pole mounted luminaire(s) · install (1) wireless access point(s) · 185 m away
- 518 S Riverfront BlvdNov 10, 2026Add a service disconnect · 234 m away
- 506 S Riverfront BlvdFeb 26, 2026Add an ada compliant restroom · 237 m away
- 512 S Riverfront BlvdOct 22, 2026Remodel current retail space into a boxing gym · 242 m away
- 515 S Riverfront BlvdDec 3, 2025Toilets, frp, vanities, drywall patch/repair, paint, changing fixtures, tile, sinks, floor finish, fix damaged drains, remove part of interior wall (non load baring) close up window and door and fix various other things damaged by vandalism and car crashes. change use from office to restaurant · 248 m away
- 700 S Stemmons FwyAug 4, 2026Water and sewer services only meter release · 481 m away
- 351 S Riverfront BlvdJun 17, 2025Removal of glass windows and do brick wall instead of glass. store gets too hot with all of the glass in the front area · 586 m away
- 500 Memorial DrMay 11, 2026Electrical service connection for the new convention center construction trailer · 589 m away